-
1
-
-
0030190632
-
Optimal switching device placement in radial distribution systems
-
July
-
R.Billinton- S.Jonnavithula, "Optimal switching device placement in radial distribution systems", IEEE Trans. on Power Delivery Vol.11 No3 July 1996 pp.1646-1651.
-
(1996)
IEEE Trans. on Power Delivery
, vol.11
, Issue.3
, pp. 1646-1651
-
-
Billinton, R.1
Jonnavithula, S.2
-
2
-
-
0032640276
-
Optimal sectionalizing switches allocation in distribution networks
-
July
-
Gianni Celli - Fabrizio Pilo, "Optimal sectionalizing switches allocation in distribution networks", IEEE Trans. on Power Delivery Vol. 14 No3 July 1993 pp.1167-1172.
-
(1993)
IEEE Trans. on Power Delivery
, vol.14
, Issue.3
, pp. 1167-1172
-
-
Celli, G.1
Pilo, F.2
-
3
-
-
0036118846
-
Feeder Switch relocation for customer interruption cost minimzation
-
January
-
J.Hao Teng - Chan Nan Lu, "Feeder Switch relocation for customer interruption cost minimzation", IEEE Trans. on Power Delivery Vol. 17 Nol January 2002 pp.254-259.
-
(2002)
IEEE Trans. on Power Delivery
, vol.17
, Issue.1
, pp. 254-259
-
-
Teng, J.H.1
Lu, C.N.2
-
4
-
-
0030196474
-
Time of outage restoration analysis in distribution systems
-
July
-
M.Y.Chow - L.S.Taylor - M.S.Chow, "Time of outage restoration analysis in distribution systems", IEEE Trans. on Power Delivery Vol. 11 No3 July 1996 pp.1652-1658.
-
(1996)
IEEE Trans. on Power Delivery
, vol.11
, Issue.3
, pp. 1652-1658
-
-
Chow, M.Y.1
Taylor, L.S.2
Chow, M.S.3
-
5
-
-
0031118145
-
Automated primary distribution system design: Reliability and cost optimization
-
April
-
R.E.Brown - S.Gupta - R.D.Christie - S.S.Venkata R.Fletcher, "Automated primary distribution system design: reliability and cost optimization", IEEE Trans. on Power Delivery Vol. 12 No2 April 1997 pp.1017-1022.
-
(1997)
IEEE Trans. on Power Delivery
, vol.12
, Issue.2
, pp. 1017-1022
-
-
Brown, R.E.1
Gupta, S.2
Christie, R.D.3
Venkata, S.S.4
Fletcher, R.5
-
6
-
-
0024479220
-
Impact of automation on the reliability of the Athens utilities board's distribution system
-
January
-
J.S.Lawler - L.D.Monteen - J.B.Patton - D.T.Rizy, "Impact of automation on the reliability of the Athens utilities board's distribution system", IEEE Trans. on Power Delivery Vol. 4 No1 January 1989 pp.770-777.
-
(1989)
IEEE Trans. on Power Delivery
, vol.4
, Issue.1
, pp. 770-777
-
-
Lawler, J.S.1
Monteen, L.D.2
Patton, J.B.3
Rizy, D.T.4
-
7
-
-
0029252562
-
Evaluation of reliabiliy indices and outage cost in distribution systems
-
February
-
R.N.Allan-M.G.DaSilva, "Evaluation of reliabiliy indices and outage cost in distribution systems", IEEE Trans. on Power Systems Vol.10 No1 February 1995 pp.413-419.
-
(1995)
IEEE Trans. on Power Systems
, vol.10
, Issue.1
, pp. 413-419
-
-
Allan, R.N.1
DaSilva, M.G.2
-
8
-
-
0036124732
-
Reliability cost/worth assessment of distribution systems incorporating time-varying weather conditions and restoration resources
-
January
-
P.Wang-R.Billinton, "Reliability cost/worth assessment of distribution systems incorporating time-varying weather conditions and restoration resources", IEEE Trans. on Power Delivery Vol. 17 No1 January 2002 pp.260-265.
-
(2002)
IEEE Trans. on Power Delivery
, vol.17
, Issue.1
, pp. 260-265
-
-
Wang, P.1
Billinton, R.2
-
9
-
-
0032636453
-
Time sequential distribution system reliability worth analysis considering time varying load and cost models
-
July
-
P.Wang - R.Billinton, "Time sequential distribution system reliability worth analysis considering time varying load and cost models", IEEE Trans. on Power Delivery Vol. 14 No3 July 1999 pp. 1046-1051.
-
(1999)
IEEE Trans. on Power Delivery
, vol.14
, Issue.3
, pp. 1046-1051
-
-
Wang, P.1
Billinton, R.2
-
10
-
-
0034314296
-
Distribution system planning with evolutionary programming and a reliability cost model
-
November
-
W. M. Lin - C. D. Yang - M. T. Tsay, "Distribution system planning with evolutionary programming and a reliability cost model", IEE Proc. Gen. Trans. Distrib. Vol. 147 No6 November 2000 pp.336-341.
-
(2000)
IEE Proc. Gen. Trans. Distrib.
, vol.147
, Issue.6
, pp. 336-341
-
-
Lin, W.M.1
Yang, C.D.2
Tsay, M.T.3
-
11
-
-
0035248413
-
Reliability and cost optimization for distribution networks expansion using an evolutionary algorithm
-
February
-
Ignacio J. Ramirez Rosado - José L. Bernal Agustin, "Reliability and cost optimization for distribution networks expansion using an evolutionary algorithm", IEEE Trans. on Power Systems Vol. 16 No1 February 2001 pp.111-118.
-
(2001)
IEEE Trans. on Power Systems
, vol.16
, Issue.1
, pp. 111-118
-
-
Ramirez Rosado, I.J.1
Bernal Agustin, J.L.2
-
12
-
-
84991787353
-
-
J.Endreneyi, "Reliability Modeling in Electric Power Systems", Editorial John Wiley & Sons Ltd. 1978.
-
-
-
|