메뉴 건너뛰기




Volumn 2005, Issue , 2005, Pages 89-97

Fast component interaction for real-time systems

Author keywords

[No Author keywords available]

Indexed keywords

INFORMATION RETRIEVAL SYSTEMS; INTERACTIVE COMPUTER GRAPHICS; SERVERS; TELECOMMUNICATION NETWORKS;

EID: 33749044384     PISSN: 10683070     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ECRTS.2005.16     Document Type: Conference Paper
Times cited : (31)

References (21)
  • 1
    • 0032293318 scopus 로고    scopus 로고
    • Integrating multimedia applications in hard real-time systems
    • Madrid, Spain, December . IEEE
    • L. Abeni and G. Buttazzo. Integrating multimedia applications in hard real-time systems. In Real-Time Systems Symposium, Madrid, Spain, December 1998. IEEE.
    • (1998) Real-time Systems Symposium
    • Abeni, L.1    Buttazzo, G.2
  • 3
    • 0035684052 scopus 로고    scopus 로고
    • Aperiodic servers with resource constraints
    • London, UK, December . IEEE
    • M. Caccamo, G. Buttazzo, and L. Sha. Aperiodic servers with resource constraints. In Real-Time Systems Symposium, London, UK, December 2001. IEEE.
    • (2001) Real-time Systems Symposium
    • Caccamo, M.1    Buttazzo, G.2    Sha, L.3
  • 4
    • 0031373951 scopus 로고    scopus 로고
    • Scheduling real-time applications in open environment
    • San Francisco, December . IEEE
    • Z. Deng and J. Liu. Scheduling real-time applications in open environment. In Real-Time Systems Symposium, San Francisco, December 1997. IEEE.
    • (1997) Real-time Systems Symposium
    • Deng, Z.1    Liu, J.2
  • 7
    • 11244344125 scopus 로고    scopus 로고
    • Task synchronization in reservation-based real-time systems
    • L. A. Guiseppe Lipari, Gerardo Lamastra. Task synchronization in reservation-based real-time systems. IEEE Transactions on Computers, 53(12):1591-1601, 2004.
    • (2004) IEEE Transactions on Computers , vol.53 , Issue.12 , pp. 1591-1601
    • Lipari, L.A.G.1    Lamastra, G.2
  • 15
    • 0002264123 scopus 로고    scopus 로고
    • Schedulability analysis of periodic and aperiodic tasks with resource constraints
    • G. Lipari and G. Buttazzo. Schedulability analysis of periodic and aperiodic tasks with resource constraints. Journal of Systems Architecture, (46:327-338), 2000.
    • (2000) Journal of Systems Architecture , vol.46 , pp. 327-338
    • Lipari, G.1    Buttazzo, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.