-
1
-
-
84968053439
-
Improving new product planning with GERT simulation
-
Bellas C.J. and Samli A. G. (1973). "Improving new product planning with GERT simulation." California Management Review, 15(4), 14-21.
-
(1973)
California Management Review
, vol.15
, Issue.4
, pp. 14-21
-
-
Bellas, C.J.1
Samli, A.G.2
-
2
-
-
0006238013
-
RESQUE: A resource oriented simulation system for multiple resource constrained proceedings of processes
-
Milwaukee, Wisconsin
-
Chang, D.Y., and Carr, R.I. (1987). "RESQUE: A Resource Oriented Simulation System for Multiple Resource Constrained Proceedings of Processes." Proceedings of the 1987 PMI Seminar/Symposium, Milwaukee, Wisconsin, 4-19.
-
(1987)
Proceedings of the 1987 PMI Seminar/Symposium
, pp. 4-19
-
-
Chang, D.Y.1
Carr, R.I.2
-
3
-
-
17744387774
-
True estimate reduces project risk
-
Durrenberger, M. R. (1999). "True estimate reduces project risk." PM Network, 45-48.
-
(1999)
PM Network
, pp. 45-48
-
-
Durrenberger, M.R.1
-
5
-
-
0017539255
-
CYCLONE: Method for modeling of job site processes
-
ASCE
-
Halpin, D. W. (1977). "CYCLONE: Method for Modeling of Job Site Processes." Journal of the Construction Division, ASCE, 103(3), 489-499.
-
(1977)
Journal of the Construction Division
, vol.103
, Issue.3
, pp. 489-499
-
-
Halpin, D.W.1
-
6
-
-
33748958790
-
Project schedule risk analysis: Monte Carlo simulation or PERT?
-
February
-
Hulett, D. T. (2000). "Project schedule risk analysis: Monte Carlo simulation or PERT?" PM Network, February, 43-47.
-
(2000)
PM Network
, pp. 43-47
-
-
Hulett, D.T.1
-
7
-
-
0003656321
-
-
Department of Civil Engineering, The University of Michigan, Ann Arbor, Michigan
-
Ioannou, P.G. (1989). UM-CYCLONE User's Guide. Department of Civil Engineering, The University of Michigan, Ann Arbor, Michigan.
-
(1989)
UM-CYCLONE User's Guide
-
-
Ioannou, P.G.1
-
10
-
-
0028741632
-
General purpose simulation with stroboscope
-
Orlando, FL
-
Martinez, J., and Ioannou, P.G. (1994). "General Purpose Simulation with stroboscope." Proceedings of the Winter Simulation Conference, Orlando, FL, 1159-1166.
-
(1994)
Proceedings of the Winter Simulation Conference
, pp. 1159-1166
-
-
Martinez, J.1
Ioannou, P.G.2
-
12
-
-
33748976665
-
An integrated simulation tool using multilevel stochastic networks cost and time risk assessment
-
ASCE, submitted in July 2004
-
Moussa, M., Ruwanpura, J., and Jergeas, G. (2004a) "An Integrated Simulation Tool using Multilevel Stochastic Networks Cost and Time Risk Assessment," Under Review for the Journal of Construction Engineering and Management, ASCE, submitted in July 2004.
-
(2004)
Under Review for the Journal of Construction Engineering and Management
-
-
Moussa, M.1
Ruwanpura, J.2
Jergeas, G.3
-
13
-
-
17744392247
-
Decision tree module within decision support simulation system
-
Accepted for the, Washington DC, Dec. 2004
-
Moussa, M., Ruwanpura, J., and Jergeas, G. (2004b) "Decision Tree Module within Decision Support Simulation System," Accepted for the Proceedings of Winter Simulation Conference, Washington DC, Dec. 2004.
-
(2004)
Proceedings of Winter Simulation Conference
-
-
Moussa, M.1
Ruwanpura, J.2
Jergeas, G.3
-
14
-
-
33748977596
-
GERT networks with tree structure: Properties, temporal analysis, cost minimization and scheduling
-
Oberwolfach, West Germany
-
Neumann, K. (1984). "GERT networks with tree structure: Properties, temporal analysis, cost minimization and scheduling." Contributions to Operations Research. Proceedings, Oberwolfach, West Germany, 142-158.
-
(1984)
Contributions to Operations Research. Proceedings
, pp. 142-158
-
-
Neumann, K.1
-
15
-
-
0023366950
-
Construction operations simulation by microcomputer
-
ASCE
-
Paulson, B.C. Jr., Chan, W.T., Koo, C.C. (1987). "Construction Operations Simulation by Microcomputer." Journal of Construction Engineering and Management, ASCE, 113(2), 302-314.
-
(1987)
Journal of Construction Engineering and Management
, vol.113
, Issue.2
, pp. 302-314
-
-
Paulson Jr., B.C.1
Chan, W.T.2
Koo, C.C.3
|