메뉴 건너뛰기




Volumn 2005, Issue , 2005, Pages

Multilevel integrated stochastic networks for cost and time risk assessment

Author keywords

Modeling; Networks; Risk assessment; Simulation; Time Cost integration; Uncertainty

Indexed keywords

COMPUTER SIMULATION; COSTS; DECISION SUPPORT SYSTEMS; DYNAMIC PROGRAMMING; RANDOM PROCESSES; TREES (MATHEMATICS);

EID: 33748975160     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (2)

References (16)
  • 1
    • 84968053439 scopus 로고
    • Improving new product planning with GERT simulation
    • Bellas C.J. and Samli A. G. (1973). "Improving new product planning with GERT simulation." California Management Review, 15(4), 14-21.
    • (1973) California Management Review , vol.15 , Issue.4 , pp. 14-21
    • Bellas, C.J.1    Samli, A.G.2
  • 2
    • 0006238013 scopus 로고
    • RESQUE: A resource oriented simulation system for multiple resource constrained proceedings of processes
    • Milwaukee, Wisconsin
    • Chang, D.Y., and Carr, R.I. (1987). "RESQUE: A Resource Oriented Simulation System for Multiple Resource Constrained Proceedings of Processes." Proceedings of the 1987 PMI Seminar/Symposium, Milwaukee, Wisconsin, 4-19.
    • (1987) Proceedings of the 1987 PMI Seminar/Symposium , pp. 4-19
    • Chang, D.Y.1    Carr, R.I.2
  • 3
    • 17744387774 scopus 로고    scopus 로고
    • True estimate reduces project risk
    • Durrenberger, M. R. (1999). "True estimate reduces project risk." PM Network, 45-48.
    • (1999) PM Network , pp. 45-48
    • Durrenberger, M.R.1
  • 5
    • 0017539255 scopus 로고
    • CYCLONE: Method for modeling of job site processes
    • ASCE
    • Halpin, D. W. (1977). "CYCLONE: Method for Modeling of Job Site Processes." Journal of the Construction Division, ASCE, 103(3), 489-499.
    • (1977) Journal of the Construction Division , vol.103 , Issue.3 , pp. 489-499
    • Halpin, D.W.1
  • 6
    • 33748958790 scopus 로고    scopus 로고
    • Project schedule risk analysis: Monte Carlo simulation or PERT?
    • February
    • Hulett, D. T. (2000). "Project schedule risk analysis: Monte Carlo simulation or PERT?" PM Network, February, 43-47.
    • (2000) PM Network , pp. 43-47
    • Hulett, D.T.1
  • 7
    • 0003656321 scopus 로고
    • Department of Civil Engineering, The University of Michigan, Ann Arbor, Michigan
    • Ioannou, P.G. (1989). UM-CYCLONE User's Guide. Department of Civil Engineering, The University of Michigan, Ann Arbor, Michigan.
    • (1989) UM-CYCLONE User's Guide
    • Ioannou, P.G.1
  • 13
    • 17744392247 scopus 로고    scopus 로고
    • Decision tree module within decision support simulation system
    • Accepted for the, Washington DC, Dec. 2004
    • Moussa, M., Ruwanpura, J., and Jergeas, G. (2004b) "Decision Tree Module within Decision Support Simulation System," Accepted for the Proceedings of Winter Simulation Conference, Washington DC, Dec. 2004.
    • (2004) Proceedings of Winter Simulation Conference
    • Moussa, M.1    Ruwanpura, J.2    Jergeas, G.3
  • 14
    • 33748977596 scopus 로고
    • GERT networks with tree structure: Properties, temporal analysis, cost minimization and scheduling
    • Oberwolfach, West Germany
    • Neumann, K. (1984). "GERT networks with tree structure: Properties, temporal analysis, cost minimization and scheduling." Contributions to Operations Research. Proceedings, Oberwolfach, West Germany, 142-158.
    • (1984) Contributions to Operations Research. Proceedings , pp. 142-158
    • Neumann, K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.