메뉴 건너뛰기




Volumn 45, Issue 1-2, 2007, Pages 11-20

Manufacturing delivery performance for supply chain management

Author keywords

Due date; Holding cost; MTO system; Order leadtime; Single stage

Indexed keywords

COSTS; PROBLEM SOLVING; PROCESS ENGINEERING; PRODUCTION ENGINEERING;

EID: 33748967411     PISSN: 08957177     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.mcm.2005.07.008     Document Type: Article
Times cited : (23)

References (20)
  • 1
    • 84989412809 scopus 로고
    • Material requirements planning under uncertainty
    • Whybark D.C., and William J.G. Material requirements planning under uncertainty. Decision Sciences 17 4 (1976) 595-606
    • (1976) Decision Sciences , vol.17 , Issue.4 , pp. 595-606
    • Whybark, D.C.1    William, J.G.2
  • 3
    • 0001178440 scopus 로고
    • The cost of inflated planned leadtimes in MRP system
    • St John R. The cost of inflated planned leadtimes in MRP system. Journal of Operations Management 5 2 (1985) 119-128
    • (1985) Journal of Operations Management , vol.5 , Issue.2 , pp. 119-128
    • St John, R.1
  • 4
    • 38249044047 scopus 로고
    • Manufacturing lead times accuracy
    • Marlin P.G. Manufacturing lead times accuracy. Journal of Operations Management 6 2 (1986) 179-202
    • (1986) Journal of Operations Management , vol.6 , Issue.2 , pp. 179-202
    • Marlin, P.G.1
  • 5
    • 0003007750 scopus 로고
    • Optimizing planned lead times and delivery dates
    • American Production and Inventory Control Society
    • Weeks J.K. Optimizing planned lead times and delivery dates. 21st Annual Conference Proceeding (1981), American Production and Inventory Control Society 177-188
    • (1981) 21st Annual Conference Proceeding , pp. 177-188
    • Weeks, J.K.1
  • 6
    • 38249039951 scopus 로고
    • Toward a better understanding of lead times in MRP systems
    • Kanet J.J. Toward a better understanding of lead times in MRP systems. Journal of Operations Management 6 3 (1986) 305-315
    • (1986) Journal of Operations Management , vol.6 , Issue.3 , pp. 305-315
    • Kanet, J.J.1
  • 7
    • 0023207074 scopus 로고
    • Setting planned leadtimes in serial production systems with tardiness costs
    • Yano C.A. Setting planned leadtimes in serial production systems with tardiness costs. Management Science 33 1 (1987) 95-106
    • (1987) Management Science , vol.33 , Issue.1 , pp. 95-106
    • Yano, C.A.1
  • 8
    • 0023419888 scopus 로고
    • Planned leadtimes for serial production system
    • Yano C.A. Planned leadtimes for serial production system. IIE Transactions 19 3 (1987) 300-307
    • (1987) IIE Transactions , vol.19 , Issue.3 , pp. 300-307
    • Yano, C.A.1
  • 9
    • 0023558979 scopus 로고
    • Stochastic leadtimes in two-level assembly systems
    • Yano C.A. Stochastic leadtimes in two-level assembly systems. IIE Transactions 19 4 (1987) 371-378
    • (1987) IIE Transactions , vol.19 , Issue.4 , pp. 371-378
    • Yano, C.A.1
  • 10
    • 0032419175 scopus 로고    scopus 로고
    • Planned lead times in multistage systems
    • Moran R.P., and Ritzman L.P. Planned lead times in multistage systems. Decision Sciences 29 1 (1998) 163-191
    • (1998) Decision Sciences , vol.29 , Issue.1 , pp. 163-191
    • Moran, R.P.1    Ritzman, L.P.2
  • 14
    • 0000752798 scopus 로고
    • Investing in reduced setups in the EOQ model
    • Porteus E. Investing in reduced setups in the EOQ model. Management Science 31 (1985) 998-1010
    • (1985) Management Science , vol.31 , pp. 998-1010
    • Porteus, E.1
  • 15
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • Porteus E. Optimal lot sizing, process quality improvement and setup cost reduction. Management Science 34 (1986) 137-144
    • (1986) Management Science , vol.34 , pp. 137-144
    • Porteus, E.1
  • 16
    • 0023439708 scopus 로고
    • From EOQ towards ZI
    • Zangwill W. From EOQ towards ZI. Management Science 33 (1987) 1209-1223
    • (1987) Management Science , vol.33 , pp. 1209-1223
    • Zangwill, W.1
  • 17
    • 0346603264 scopus 로고    scopus 로고
    • The joining effect of leadtime variance and lot size in a parallel processing environment
    • Song J., and Zipkin P.H. The joining effect of leadtime variance and lot size in a parallel processing environment. Management Science 42 9 (1996) 1352-1363
    • (1996) Management Science , vol.42 , Issue.9 , pp. 1352-1363
    • Song, J.1    Zipkin, P.H.2
  • 18
    • 0000376862 scopus 로고
    • Customer-order information, leadtimes, and inventories
    • Hariharan R., and Zipkin P. Customer-order information, leadtimes, and inventories. Management Science 41 10 (1995) 1599-1607
    • (1995) Management Science , vol.41 , Issue.10 , pp. 1599-1607
    • Hariharan, R.1    Zipkin, P.2
  • 19
    • 0001131108 scopus 로고
    • Single facility due date setting with multiple customer classes
    • Duenyas I. Single facility due date setting with multiple customer classes. Management Science 41 4 (1995) 608-619
    • (1995) Management Science , vol.41 , Issue.4 , pp. 608-619
    • Duenyas, I.1
  • 20
    • 0002987480 scopus 로고
    • Quoting customer lead times
    • Duenyas I., and Hopp W.J. Quoting customer lead times. Management Science 41 1 (1995) 43-57
    • (1995) Management Science , vol.41 , Issue.1 , pp. 43-57
    • Duenyas, I.1    Hopp, W.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.