메뉴 건너뛰기




Volumn 10, Issue 4, 1993, Pages 28-35

Process Improvement and the Corporate Balance Sheet

Author keywords

[No Author keywords available]

Indexed keywords


EID: 33748696414     PISSN: 07407459     EISSN: None     Source Type: Journal    
DOI: 10.1109/52.219618     Document Type: Article
Times cited : (122)

References (8)
  • 2
    • 0003904007 scopus 로고
    • A Method for Assessing the Software Engineering Capability of Contractors
    • et. al., Tech. Report CMU/SEI-87-TR-2 3, Software Engineering Institute, Pittsburgh
    • W.S. Humphrey et al., “A Method for Assessing the Software Engineering Capability of Contractors,” Tech. Report CMU/SEI-87-TR-2 3, Software Engineering Institute, Pittsburgh, 1987.
    • (1987)
    • Humphrey, W.S.1
  • 3
    • 0003964033 scopus 로고
    • MIT Center for Advanced Engineering Study, Cambridge, Mass.
    • W.E. Deming, Out of the Crisis, MIT Center for Advanced Engineering Study, Cambridge, Mass., 1982.
    • (1982) Out of the Crisis
    • Deming, W.E.1
  • 4
    • 0003645081 scopus 로고
    • juran on Planning for Quality
    • The Free Press, New York
    • J.M. Juran, juran on Planning for Quality, The Free Press, New York, 1988.
    • (1988)
    • Juran, J.M.1
  • 6
    • 0037764377 scopus 로고
    • Elements of a Process-Improvement Program
    • July
    • R. Dion, “Elements of a Process-Improvement Program,” IEEE Software, July 1992, pp. 83–85.
    • (1992) IEEE Software , pp. 83-85
    • Dion, R.1
  • 7
    • 0023416901 scopus 로고
    • Improving Software Productivity
    • Sept.
    • B. Boehm, “Improving Software Productivity,” Computer, Sept. 1987, pp. 43–57.
    • (1987) Computer , pp. 43-57
    • Boehm, B.1
  • 8
    • 84946966665 scopus 로고
    • Advanced in Software Inspections
    • July
    • M. Fagen, “Advanced in Software Inspections,” IEEE Trans. Software Eng., July 1988, pp. 751–774.
    • (1988) IEEE Trans. Software Eng. , pp. 751-774
    • Fagen, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.