-
1
-
-
0032099143
-
Techniques for the analysis of risk in major projects
-
Baker S, Ponniah D and Smith S (1998). Techniques for the analysis of risk in major projects. J Opnl Res Soc 49(6): 567-572.
-
(1998)
J Opnl Res Soc
, vol.49
, Issue.6
, pp. 567-572
-
-
Baker, S.1
Ponniah, D.2
Smith, S.3
-
2
-
-
0022532104
-
Using break-even quality level for selecting acceptance sampling plans given a prior distribution
-
Barad M (1986). Using break-even quality level for selecting acceptance sampling plans given a prior distribution. Int J Prod Res 24(1): 65-72.
-
(1986)
Int J Prod Res
, vol.24
, Issue.1
, pp. 65-72
-
-
Barad, M.1
-
3
-
-
0028728142
-
Decomposing timed petri net models of open queueing networks
-
Barad M (1994). Decomposing timed petri net models of open queueing networks. J Opnl Res Soc 45(12): 1385-1397.
-
(1994)
J Opnl Res Soc
, vol.45
, Issue.12
, pp. 1385-1397
-
-
Barad, M.1
-
4
-
-
0023861277
-
Multi-product queueing networks with deterministic routing: Decomposition approach and the notion of interference
-
Bitran GR and Tirupati D (1988). Multi-product queueing networks with deterministic routing: decomposition approach and the notion of interference. Mngt Sci 34: 75-100.
-
(1988)
Mngt Sci
, vol.34
, pp. 75-100
-
-
Bitran, G.R.1
Tirupati, D.2
-
5
-
-
0035416239
-
Applying the design structure matrix to system decomposition and integration problems
-
Browning TR (2001). Applying the design structure matrix to system decomposition and integration problems. IEEE Trans Engin Mngt 48(3): 292-306.
-
(2001)
IEEE Trans Engin Mngt
, vol.48
, Issue.3
, pp. 292-306
-
-
Browning, T.R.1
-
7
-
-
1842754758
-
A methodology for modeling VVT risks and costs
-
Engel A and Barad M (2003). A methodology for modeling VVT risks and costs. Syst Engin J 6(3): 135-151.
-
(2003)
Syst Engin J
, vol.6
, Issue.3
, pp. 135-151
-
-
Engel, A.1
Barad, M.2
-
8
-
-
0036090498
-
Risk filtering, ranking and Management framework using hierarchical holographic modeling
-
Haimes YY, Kaplan S and Lambert JH (2002). Risk filtering, ranking and Management framework using hierarchical holographic modeling. Risk Analysis 22(2): 383-398.
-
(2002)
Risk Analysis
, vol.22
, Issue.2
, pp. 383-398
-
-
Haimes, Y.Y.1
Kaplan, S.2
Lambert, J.H.3
-
9
-
-
11544302773
-
Cost of software quality: A means of promoting software process improvement
-
Houston D and Keats BJ (1998). Cost of software quality: a means of promoting software process improvement. Qual Engin 10(3): 563-574.
-
(1998)
Qual Engin
, vol.10
, Issue.3
, pp. 563-574
-
-
Houston, D.1
Keats, B.J.2
-
10
-
-
0000215324
-
Exploratory evidence on the behavior of quality costs
-
Ittner CD (1996). Exploratory evidence on the behavior of quality costs. Opns Res 44(1): 114-130.
-
(1996)
Opns Res
, vol.44
, Issue.1
, pp. 114-130
-
-
Ittner, C.D.1
-
12
-
-
0027851207
-
Decomposition of the design process
-
Kusiak A and Wang J (1993). Decomposition of the design process. J Mechanical Design 115: 687-695.
-
(1993)
J Mechanical Design
, vol.115
, pp. 687-695
-
-
Kusiak, A.1
Wang, J.2
-
14
-
-
0031377328
-
Optimizing the selection of VV&A activities - A risk benefit approach
-
Atlanta, GA, USA
-
Muessig PR, Laack DR and Wroblesky JW (1997). Optimizing the selection of VV&A activities - a risk benefit approach. In: Proceedings of the 1997 Winter Simulation Conference. Atlanta, GA, USA, pp 60-66.
-
(1997)
Proceedings of the
, vol.1997
, pp. 60-66
-
-
Muessig, P.R.1
Laack, D.R.2
Wroblesky, J.W.3
-
16
-
-
0002572733
-
Robust quality
-
Taguchi G and Clausing D (1990). Robust Quality. Harvard Bus Rev January-February: 65-75.
-
(1990)
Harvard Bus Rev
, vol.JANUARY-FEBRUARY
, pp. 65-75
-
-
Taguchi, G.1
Clausing, D.2
|