메뉴 건너뛰기




Volumn 24, Issue 8, 2006, Pages 861-868

Integrated duration-cost influence network for modelling risk impacts on construction tasks

Author keywords

Integrated duration cost influence network; Quantitative risk analysis; Risk factors; Risk modelling; Risk propagation

Indexed keywords

COMPUTER SIMULATION; CONSTRUCTION INDUSTRY; COSTS; MATHEMATICAL MODELS; RISK MANAGEMENT;

EID: 33748200732     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446190600658891     Document Type: Article
Times cited : (25)

References (18)
  • 2
    • 0003486292 scopus 로고    scopus 로고
    • APM (Association for Project Management). In The APM Group
    • APM (Association for Project Management).(1997). In PRAM: Project Risk Analysis and Management Guide. The APM Group.
    • (1997) PRAM: Project Risk Analysis and Management Guide
  • 3
    • 0027609613 scopus 로고
    • Cost, schedule, and time variances and integration
    • Carr, R. I. (1993) Cost, schedule, and time variances and integration. Journal of Construction Engineering and Management, 119((2)), pp. 245-65.
    • (1993) Journal of Construction Engineering and Management , vol.119 , Issue.2 , pp. 245-265
    • Carr, R.I.1
  • 7
    • 0003573555 scopus 로고    scopus 로고
    • ICE and FIA (Institution of Civil Engineers and Faculty and Institute of Actuaries). In London: Thomas Telford
    • ICE and FIA (Institution of Civil Engineers and Faculty and Institute of Actuaries). (1998). In RAMP: Risk Analysis and Management for Projects. London: Thomas Telford.
    • (1998) RAMP: Risk Analysis and Management for Projects
  • 8
    • 8644292857 scopus 로고    scopus 로고
    • Multiple simulation analysis for probabilistic cost and schedule integration
    • Isidore, L. J. and Back, W. E. (2002) Multiple simulation analysis for probabilistic cost and schedule integration. Journal of Construction Engineering and Management, 128((3)), pp. 211-19.
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.3 , pp. 211-219
    • Isidore, L.J.1    Back, W.E.2
  • 9
    • 13944251500 scopus 로고
    • An object-oriented database management system approach to improve construction project planning and control
    • In. Urbana, USA: PhD thesis, University of Illinois
    • Kim, J. J.(1989) An object-oriented database management system approach to improve construction project planning and control. In. Urbana, USA: PhD thesis, University of Illinois.
    • (1989)
    • Kim, J.J.1
  • 12
    • 0013337442 scopus 로고    scopus 로고
    • A qualitative project risk assessment model using fuzzy logic
    • Tah, J. H. M. and Carr, V. (2000) A qualitative project risk assessment model using fuzzy logic. Construction Management and Economics, 18((4)), pp. 491-500.
    • (2000) Construction Management and Economics , vol.18 , Issue.4 , pp. 491-500
    • Tah, J.H.M.1    Carr, V.2
  • 13
    • 0035398703 scopus 로고    scopus 로고
    • Knowledge-based approach to construction project risk management
    • Tah, J. H. M. and Carr, V. (2001) Knowledge-based approach to construction project risk management. Journal of Computing in Civil Engineering, 15((3)), pp. 170-7.
    • (2001) Journal of Computing in Civil Engineering , vol.15 , Issue.3 , pp. 170-177
    • Tah, J.H.M.1    Carr, V.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.