-
1
-
-
0005850365
-
Models and methods for managing airline irregular operations
-
In: G Yu (eds) Kluwer Academic: Boston
-
Arguello M, Bard J, Yu G (1998) Models and methods for managing airline irregular operations. In: G Yu (eds) Operations research in the airline industry. Kluwer Academic: Boston
-
(1998)
Operations Research in the Airline Industry
-
-
Arguello, M.1
Bard, J.2
Yu, G.3
-
2
-
-
0032137730
-
Flight string models for aircraft fleeting and routing
-
Barnhart C, Boland N, Clarke L, Johnson E, Nemhauser G, Shenoi R (1998) Flight string models for aircraft fleeting and routing. Transp Sci 32(3):208-220
-
(1998)
Transp Sci
, vol.32
, Issue.3
, pp. 208-220
-
-
Barnhart, C.1
Boland, N.2
Clarke, L.3
Johnson, E.4
Nemhauser, G.5
Shenoi, R.6
-
3
-
-
0344861354
-
Preliminary evaluation of flight delay propagation through an airline schedule
-
2nd USA/Europe Air Traffic Management R&D Seminar, Orlando
-
Beatty R, Hsu R, Berry L, Rome J (1998) Preliminary evaluation of flight delay propagation through an airline schedule. 2nd USA/Europe Air Traffic Management R&D Seminar, Orlando
-
(1998)
-
-
Beatty, R.1
Hsu, R.2
Berry, L.3
Rome, J.4
-
4
-
-
84899315256
-
Hubs attract low-cost trade
-
Airline Business, March issue
-
Field D (2005) Hubs attract low-cost trade. Airline Business, March issue, 15
-
(2005)
, pp. 15
-
-
Field, D.1
-
5
-
-
1642514615
-
Breaking the bank
-
Airline Business, September issue
-
Goedeking P, Sala S (2003) Breaking the bank. Airline Business, September issue, 93-97
-
(2003)
, pp. 93-97
-
-
Goedeking, P.1
Sala, S.2
-
7
-
-
21844463286
-
Expect delays
-
Airline Business, July issue
-
Howarth G, O'Tool K (2005) Expect delays. Airline Business, July issue, 62-64
-
(2005)
, pp. 62-64
-
-
Howarth, G.1
O'Tool, K.2
-
8
-
-
0011960968
-
Worldwide scheduling guideline
-
International Air Transportation Association (IATA)
-
International Air Transportation Association (IATA) (2004) Worldwide scheduling guideline
-
(2004)
-
-
-
9
-
-
33748174353
-
Degradable airline scheduling: An approach to improve operational robustness and differentiate service quality
-
PhD thesis, Massachusetts Institute of Technology
-
Kang L (2004) Degradable airline scheduling: An approach to improve operational robustness and differentiate service quality. PhD thesis, Massachusetts Institute of Technology
-
(2004)
-
-
Kang, L.1
-
10
-
-
0031275839
-
On the airline schedule perturbation problem caused by the ground delay program
-
Luo S, Yu G (1997) On the airline schedule perturbation problem caused by the ground delay program. Transp Sci 31(4):298-311
-
(1997)
Transp Sci
, vol.31
, Issue.4
, pp. 298-311
-
-
Luo, S.1
Yu, G.2
-
14
-
-
0033871585
-
Airline fleet assignment with time windows
-
Rexing B, Barnhart C, Kniker T, Jarrah A, Krishnamurthy N (2000) Airline fleet assignment with time windows. Transp Sci 34(1):1-20
-
(2000)
Transp Sci
, vol.34
, Issue.1
, pp. 1-20
-
-
Rexing, B.1
Barnhart, C.2
Kniker, T.3
Jarrah, A.4
Krishnamurthy, N.5
-
15
-
-
0011151628
-
Airline extend flight times to conceal growing delays
-
Sunday Times (August 13)
-
Sunday Times (2000, August 13) Airline extend flight times to conceal growing delays
-
(2000)
-
-
-
16
-
-
0029342675
-
Model to reduce airline schedule disturbances
-
Teodorovic D, Stojkovic G (1995) Model to reduce airline schedule disturbances. J Transp Eng 121:324-331
-
(1995)
J Transp Eng
, vol.121
, pp. 324-331
-
-
Teodorovic, D.1
Stojkovic, G.2
-
18
-
-
20344407035
-
Inherent delays and operational reliability of airline schedules
-
Wu C-L (2005) Inherent delays and operational reliability of airline schedules. J Air Transp Manag 11:273-282
-
(2005)
J Air Transp Manag
, vol.11
, pp. 273-282
-
-
Wu, C.-L.1
-
19
-
-
0030244759
-
A decision support framework for multi-fleet routing and multi-stop flight scheduling
-
Yan S, Young H-F (1996) A decision support framework for multi-fleet routing and multi-stop flight scheduling. Transp Res 30A:379-398
-
(1996)
Transp Res
, vol.30 A
, pp. 379-398
-
-
Yan, S.1
Young, H.-F.2
|