-
1
-
-
0242662607
-
A genetic algorithm for a multistage capacitated lot-sizing problem
-
Berretta, R., & Rodrigues, L. F. (2004). A genetic algorithm for a multistage capacitated lot-sizing problem, International Journal of Production Economics, 87(1), 67-81.
-
(2004)
International Journal of Production Economics
, vol.87
, Issue.1
, pp. 67-81
-
-
Berretta, R.1
Rodrigues, L.F.2
-
2
-
-
0034501331
-
A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs
-
Dellaert, N., Jeunet, J., & Jornard, N. (2000). A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs, International Journal of Production Economy, 68, 241-257.
-
(2000)
International Journal of Production Economy
, vol.68
, pp. 241-257
-
-
Dellaert, N.1
Jeunet, J.2
Jornard, N.3
-
3
-
-
4544365101
-
Performance comparison of Genetic algorithms
-
Digalakis, J., & Margaritis, K. (2004). Performance comparison of Genetic algorithms. Applied Mathematics and Computation, 158(1), 237-252.
-
(2004)
Applied Mathematics and Computation
, vol.158
, Issue.1
, pp. 237-252
-
-
Digalakis, J.1
Margaritis, K.2
-
6
-
-
0003220937
-
Scatter search and star-plants-beyond the genetic metaphor
-
Glover, F. (1977). Scatter search and star-plants-beyond the genetic metaphor. OR Spectrum, 17(2-3), 125-137.
-
(1977)
OR Spectrum
, vol.17
, Issue.2-3
, pp. 125-137
-
-
Glover, F.1
-
7
-
-
0036464279
-
Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
-
Kacem, I., Hammadi, S., Borne, P. (2002). Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems. IEEE Transactions on Systems, Man and Cybernetics, Part C, 32(1), 408-419.
-
(2002)
IEEE Transactions on Systems, Man and Cybernetics, Part C
, vol.32
, Issue.1
, pp. 408-419
-
-
Kacem, I.1
Hammadi, S.2
Borne, P.3
-
11
-
-
21144431907
-
A STEP-based manufacturing information system to share flexible manufacturing resources data
-
Lopez, O., & Ramirez, M. (2005). A STEP-based manufacturing information system to share flexible manufacturing resources data. Journal of Intelligent Manufacturing, 16(3), 287-301.
-
(2005)
Journal of Intelligent Manufacturing
, vol.16
, Issue.3
, pp. 287-301
-
-
Lopez, O.1
Ramirez, M.2
-
12
-
-
0036721872
-
Integrated machine tool selection and operation sequencing with capacity and precedence constraints using genetic algorithm
-
Moon, C., Lee, M., Seo, Y., & Lee, Y. H. (2002). Integrated machine tool selection and operation sequencing with capacity and precedence constraints using genetic algorithm. Computers and Industrial Engineering, 43(3), 605-621.
-
(2002)
Computers and Industrial Engineering
, vol.43
, Issue.3
, pp. 605-621
-
-
Moon, C.1
Lee, M.2
Seo, Y.3
Lee, Y.H.4
-
13
-
-
33747723783
-
Evolutionary algorithm for process plan selection with multiple objectives
-
Moon, C., Lee, Y. H., & Gen, M. (2004a). Evolutionary algorithm for process plan selection with multiple objectives. Journal of Industrial Engineering and Management Systems, 3(2), 125-131.
-
(2004)
Journal of Industrial Engineering and Management Systems
, vol.3
, Issue.2
, pp. 125-131
-
-
Moon, C.1
Lee, Y.H.2
Gen, M.3
-
14
-
-
3142777327
-
Advanced planning and scheduling based on precedence and resource constraints for e-plant chains
-
Moon, C., Kim, J. S., & Gen, M. (2004b). Advanced planning and scheduling based on precedence and resource constraints for e-plant chains. International Journal of Production Research, 42(15), 2941-2955.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.15
, pp. 2941-2955
-
-
Moon, C.1
Kim, J.S.2
Gen, M.3
-
15
-
-
31744446307
-
Advanced planning for minimizing makespan with load balancing in multi-plant chain
-
Moon, C., & Seo, Y. (2005). Advanced planning for minimizing makespan with load balancing in multi-plant chain. International Journal of Production Research, 43(20), 4381-4396.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.20
, pp. 4381-4396
-
-
Moon, C.1
Seo, Y.2
-
16
-
-
0038269297
-
A modified simulated annealing method for flexible job shop scheduling problem
-
Najid, N. M., Dauzere-Peres, S., & Zaidat, A. (2002). A modified simulated annealing method for flexible job shop scheduling problem. Proceedings of IEEE International Conference on Systems, Man and Cybernetics, 5, 6.
-
(2002)
Proceedings of IEEE International Conference on Systems, Man and Cybernetics
, vol.5
, pp. 6
-
-
Najid, N.M.1
Dauzere-Peres, S.2
Zaidat, A.3
-
17
-
-
21144445739
-
An autonomous decentralized supply chain planning system for multi-stage production processes
-
Nishi, T., & Konishi, M. (2005). An autonomous decentralized supply chain planning system for multi-stage production processes. Journal of Intelligent Manufacturing, 16(3), 259-275.
-
(2005)
Journal of Intelligent Manufacturing
, vol.16
, Issue.3
, pp. 259-275
-
-
Nishi, T.1
Konishi, M.2
-
18
-
-
17444375349
-
A robust dynamic planning strategy for lot-sizing problems with stochastic demands
-
Raa, B., & Aghezzaf, E. H. (2005). A robust dynamic planning strategy for lot-sizing problems with stochastic demands. Journal of Intelligent Manufacturing, 16(2), 207-213.
-
(2005)
Journal of Intelligent Manufacturing
, vol.16
, Issue.2
, pp. 207-213
-
-
Raa, B.1
Aghezzaf, E.H.2
-
19
-
-
0242492049
-
Resource selection for distributed manufacturing in agile manufacturing
-
Su, P., Wu, N., & Yu, Z. (2003). Resource selection for distributed manufacturing in agile manufacturing. Proceedings of IEEE International Conference on Systems, Man and Cybernetics, 2(1), 1578-1582.
-
(2003)
Proceedings of IEEE International Conference on Systems, Man and Cybernetics
, vol.2
, Issue.1
, pp. 1578-1582
-
-
Su, P.1
Wu, N.2
Yu, Z.3
-
20
-
-
0033885605
-
Integration of process planning and scheduling-a review
-
Tan, W. (2000). Integration of process planning and scheduling-a review. Journal of Intelligent Manufacturing, 11(1), 51-63.
-
(2000)
Journal of Intelligent Manufacturing
, vol.11
, Issue.1
, pp. 51-63
-
-
Tan, W.1
-
21
-
-
4344620927
-
A linearized polynomial mixed integer programming model for the integration of process planning and scheduling
-
Tan, W. (2004). A linearized polynomial mixed integer programming model for the integration of process planning and scheduling. Journal of Intelligent Manufacturing, 15(5), 593-605.
-
(2004)
Journal of Intelligent Manufacturing
, vol.15
, Issue.5
, pp. 593-605
-
-
Tan, W.1
-
22
-
-
33747735942
-
Multistage-based genetic algorithm for flexible job-shop scheduling problem
-
Zhang, H., & Gen, M. (2005). Multistage-based genetic algorithm for flexible job-shop scheduling problem. Journal of Complexity International, 11, 223-232.
-
(2005)
Journal of Complexity International
, vol.11
, pp. 223-232
-
-
Zhang, H.1
Gen, M.2
|