메뉴 건너뛰기




Volumn 17, Issue 4, 2006, Pages 385-397

An effective coding approach for multiobjective integrated resource selection and operation sequences problem

Author keywords

Integrated resource selection and operation sequences; Intelligent manufacturing system; Left shift hillclimber; Multiple criteria model; Multistage operation based genetic algorithm

Indexed keywords

ARTIFICIAL INTELLIGENCE; CHROMOSOMES; GENETIC ALGORITHMS; MACHINE TOOLS; OPERATIONS RESEARCH; PARETO PRINCIPLE; PROBLEM SOLVING; RESOURCE ALLOCATION;

EID: 33747676002     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-005-0012-y     Document Type: Article
Times cited : (17)

References (22)
  • 2
    • 0034501331 scopus 로고    scopus 로고
    • A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs
    • Dellaert, N., Jeunet, J., & Jornard, N. (2000). A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs, International Journal of Production Economy, 68, 241-257.
    • (2000) International Journal of Production Economy , vol.68 , pp. 241-257
    • Dellaert, N.1    Jeunet, J.2    Jornard, N.3
  • 6
    • 0003220937 scopus 로고
    • Scatter search and star-plants-beyond the genetic metaphor
    • Glover, F. (1977). Scatter search and star-plants-beyond the genetic metaphor. OR Spectrum, 17(2-3), 125-137.
    • (1977) OR Spectrum , vol.17 , Issue.2-3 , pp. 125-137
    • Glover, F.1
  • 7
    • 0036464279 scopus 로고    scopus 로고
    • Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
    • Kacem, I., Hammadi, S., Borne, P. (2002). Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems. IEEE Transactions on Systems, Man and Cybernetics, Part C, 32(1), 408-419.
    • (2002) IEEE Transactions on Systems, Man and Cybernetics, Part C , vol.32 , Issue.1 , pp. 408-419
    • Kacem, I.1    Hammadi, S.2    Borne, P.3
  • 11
    • 21144431907 scopus 로고    scopus 로고
    • A STEP-based manufacturing information system to share flexible manufacturing resources data
    • Lopez, O., & Ramirez, M. (2005). A STEP-based manufacturing information system to share flexible manufacturing resources data. Journal of Intelligent Manufacturing, 16(3), 287-301.
    • (2005) Journal of Intelligent Manufacturing , vol.16 , Issue.3 , pp. 287-301
    • Lopez, O.1    Ramirez, M.2
  • 12
    • 0036721872 scopus 로고    scopus 로고
    • Integrated machine tool selection and operation sequencing with capacity and precedence constraints using genetic algorithm
    • Moon, C., Lee, M., Seo, Y., & Lee, Y. H. (2002). Integrated machine tool selection and operation sequencing with capacity and precedence constraints using genetic algorithm. Computers and Industrial Engineering, 43(3), 605-621.
    • (2002) Computers and Industrial Engineering , vol.43 , Issue.3 , pp. 605-621
    • Moon, C.1    Lee, M.2    Seo, Y.3    Lee, Y.H.4
  • 14
    • 3142777327 scopus 로고    scopus 로고
    • Advanced planning and scheduling based on precedence and resource constraints for e-plant chains
    • Moon, C., Kim, J. S., & Gen, M. (2004b). Advanced planning and scheduling based on precedence and resource constraints for e-plant chains. International Journal of Production Research, 42(15), 2941-2955.
    • (2004) International Journal of Production Research , vol.42 , Issue.15 , pp. 2941-2955
    • Moon, C.1    Kim, J.S.2    Gen, M.3
  • 15
    • 31744446307 scopus 로고    scopus 로고
    • Advanced planning for minimizing makespan with load balancing in multi-plant chain
    • Moon, C., & Seo, Y. (2005). Advanced planning for minimizing makespan with load balancing in multi-plant chain. International Journal of Production Research, 43(20), 4381-4396.
    • (2005) International Journal of Production Research , vol.43 , Issue.20 , pp. 4381-4396
    • Moon, C.1    Seo, Y.2
  • 17
    • 21144445739 scopus 로고    scopus 로고
    • An autonomous decentralized supply chain planning system for multi-stage production processes
    • Nishi, T., & Konishi, M. (2005). An autonomous decentralized supply chain planning system for multi-stage production processes. Journal of Intelligent Manufacturing, 16(3), 259-275.
    • (2005) Journal of Intelligent Manufacturing , vol.16 , Issue.3 , pp. 259-275
    • Nishi, T.1    Konishi, M.2
  • 18
    • 17444375349 scopus 로고    scopus 로고
    • A robust dynamic planning strategy for lot-sizing problems with stochastic demands
    • Raa, B., & Aghezzaf, E. H. (2005). A robust dynamic planning strategy for lot-sizing problems with stochastic demands. Journal of Intelligent Manufacturing, 16(2), 207-213.
    • (2005) Journal of Intelligent Manufacturing , vol.16 , Issue.2 , pp. 207-213
    • Raa, B.1    Aghezzaf, E.H.2
  • 20
    • 0033885605 scopus 로고    scopus 로고
    • Integration of process planning and scheduling-a review
    • Tan, W. (2000). Integration of process planning and scheduling-a review. Journal of Intelligent Manufacturing, 11(1), 51-63.
    • (2000) Journal of Intelligent Manufacturing , vol.11 , Issue.1 , pp. 51-63
    • Tan, W.1
  • 21
    • 4344620927 scopus 로고    scopus 로고
    • A linearized polynomial mixed integer programming model for the integration of process planning and scheduling
    • Tan, W. (2004). A linearized polynomial mixed integer programming model for the integration of process planning and scheduling. Journal of Intelligent Manufacturing, 15(5), 593-605.
    • (2004) Journal of Intelligent Manufacturing , vol.15 , Issue.5 , pp. 593-605
    • Tan, W.1
  • 22
    • 33747735942 scopus 로고    scopus 로고
    • Multistage-based genetic algorithm for flexible job-shop scheduling problem
    • Zhang, H., & Gen, M. (2005). Multistage-based genetic algorithm for flexible job-shop scheduling problem. Journal of Complexity International, 11, 223-232.
    • (2005) Journal of Complexity International , vol.11 , pp. 223-232
    • Zhang, H.1    Gen, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.