-
1
-
-
84952953296
-
Six-Sigma in lean construction systems: opportunities and challenges
-
Blacksburg, Virginia, USA: Virginia Tech, July 22–24
-
Abdelhamid, T. (2003) ‘Six-Sigma in lean construction systems: opportunities and challenges’, International Group of Lean Construction, 11th Annual Conference, Blacksburg, Virginia, USA: Virginia Tech, July 22–24.
-
(2003)
International Group of Lean Construction, 11th Annual Conference
-
-
Abdelhamid, T.1
-
3
-
-
0003816185
-
-
New York, NY: Wiley
-
Breyfogle, F.W., Cupello, J.M. and Meadows, B. (2001) Managing Six Sigma: A Practical Guidde to Understanding, Assessing, and Implementing the Strategy that Yields Bottom Line Success, New York, NY: Wiley.
-
(2001)
Managing Six Sigma: A Practical Guidde to Understanding, Assessing, and Implementing the Strategy that Yields Bottom Line Success
-
-
Breyfogle, F.W.1
Cupello, J.M.2
Meadows, B.3
-
7
-
-
84952965591
-
A client’s guide to quality assurance in construction
-
London, UK
-
CIRIA (1988) ‘A client’s guide to quality assurance in construction’, SP55, CIRIA, London, UK.
-
(1988)
SP55, CIRIA
-
-
CIRIA1
-
9
-
-
0003964033
-
-
Cambridge, Mass., US: MIT
-
Deming, W.E. (1982) Out of Crisis, Cambridge, Mass., US: MIT.
-
(1982)
Out of Crisis
-
-
Deming, W.E.1
-
18
-
-
84952964566
-
The technology challenge: satisfying the owner’s need for information
-
July–August, CFMA BP
-
Gretchen, G. and Bridges, M. (2003) ‘The technology challenge: satisfying the owner’s need for information’, CFO’S ToolBox, July–August, CFMA BP, http://www.cfma.org/documents/McCombBridgers%20J%20JULYAUG.pdf
-
(2003)
CFO’S ToolBox
-
-
Gretchen, G.1
Bridges, M.2
-
19
-
-
84952968511
-
-
Port Elizabeth, South Africa
-
Hachman, J.P. and Cattell, K.S. (2003) Human and Socio-Technical Factors in the Implementation of Concurrent Engineering in the AEC SECTOR, CIDB, 1st Postgraduate Conference, Port Elizabeth, South Africa.
-
(2003)
Human and Socio-Technical Factors in the Implementation of Concurrent Engineering in the AEC SECTOR, CIDB, 1st Postgraduate Conference
-
-
Hachman, J.P.1
Cattell, K.S.2
-
20
-
-
0035484257
-
-
Hammer, M. and Goding, J. (2001) Putting Six Sigma in Perspective, Quality, Vol. 40, No. 10, pp.58–63.
-
(2001)
Putting Six Sigma in Perspective, Quality
, vol.40
, Issue.10
, pp. 58-63
-
-
Hammer, M.1
Goding, J.2
-
25
-
-
84888979583
-
Failure modes and effects analysis – a modified approach
-
Nashville, TN
-
Latino, K.C. (1996) ‘Failure modes and effects analysis – a modified approach’, National Petroleum Refiners Association (NPRA) Maintenance Conference, Nashville, TN, May, pp.73–94.
-
(1996)
National Petroleum Refiners Association (NPRA) Maintenance Conference
, vol.May
, pp. 73-94
-
-
Latino, K.C.1
-
28
-
-
0037359278
-
Six Sigma: a goal-theoretic perspective
-
Elsavier Science
-
Linderman, K., Schroeder, R.G., Zaheer, S. and Choo, A.S. (2003) ‘Six Sigma: a goal-theoretic perspective’, Journal of Operations Management, Elsavier Science, Vol. 21, pp.193–203.
-
(2003)
Journal of Operations Management
, vol.21
, pp. 193-203
-
-
Linderman, K.1
Schroeder, R.G.2
Zaheer, S.3
Choo, A.S.4
-
29
-
-
0003485315
-
-
McGraw-Hill
-
Pande, P.S., Neuman, R.P. and Cavanagh, R.R. (2000) The Six Sigma Way: How GE, Motorola, and Other Top Companies are Honing Their Performance, McGraw-Hill.
-
(2000)
The Six Sigma Way: How GE, Motorola, and Other Top Companies are Honing Their Performance
-
-
Pande, P.S.1
Neuman, R.P.2
Cavanagh, R.R.3
|