메뉴 건너뛰기




Volumn 12, Issue 3, 2006, Pages 184-191

Optimal scheduling of replacement and rehabilitation of water distribution systems

Author keywords

Cost control; Optimization; Pipelines; Probabilistic methods; Rehabilitation; Stochastic process; Water distribution systems

Indexed keywords

OPTIMIZATION; PROBABILITY; RANDOM PROCESSES; SCHEDULING; WATER PIPELINES;

EID: 33747257019     PISSN: 10760342     EISSN: None     Source Type: Journal    
DOI: 10.1061/(asce)1076-0342(2006)12:3(184)     Document Type: Article
Times cited : (30)

References (9)
  • 1
    • 0023314118 scopus 로고
    • "A new methodology for modeling the break failure patterns in deteriorating water distribution systems: Theory"
    • AWREDI0309-170810.1016/0309-1708(87)90002-9
    • Andreou, S. A., Marks, D. H., and Clark, R. M. (1987). "A new methodology for modeling the break failure patterns in deteriorating water distribution systems: Theory." Adv. Water Resour. AWREDI0309-170810.1016/0309-1708(87)90002-9, 10(1), 2-10.
    • (1987) Adv. Water Resour. , vol.10 , Issue.1 , pp. 2-10
    • Andreou, S.A.1    Marks, D.H.2    Clark, R.M.3
  • 2
    • 11144269509 scopus 로고    scopus 로고
    • "Municipal water and wastewater infrastructure: Estimated investment needs 1997-2012"
    • Canadian Water and Wastewater (CWWA). Partially sponsored by the Canadian Mortgage and Housing Corp., Ottawa
    • Canadian Water and Wastewater (CWWA). (1997). "Municipal water and wastewater infrastructure: Estimated investment needs 1997-2012." Partially sponsored by the Canadian Mortgage and Housing Corp., Ottawa.
    • (1997)
  • 4
    • 0032657522 scopus 로고    scopus 로고
    • "Using limited data to assess future needs"
    • JAWWA50003-150X
    • Kleiner, Y., and Rajani, B. B. (1999). "Using limited data to assess future needs." J. Am. Water Works Assoc. JAWWA50003-150X, 91(7), 47-61.
    • (1999) J. Am. Water Works Assoc. , vol.91 , Issue.7 , pp. 47-61
    • Kleiner, Y.1    Rajani, B.B.2
  • 5
    • 0035155332 scopus 로고    scopus 로고
    • "Water distribution network renewal planning"
    • JCCEE50887-380110.1061/(ASCE)0887-3801(2001)15:1(15)
    • Kleiner, Y., Adams, B. J., and Rogers, J. S. (2001). "Water distribution network renewal planning." J. Comput. Civ. Eng. JCCEE50887-380110.1061/(ASCE)0887-3801(2001)15:1(15), 15(1), 15-26.
    • (2001) J. Comput. Civ. Eng. , vol.15 , Issue.1 , pp. 15-26
    • Kleiner, Y.1    Adams, B.J.2    Rogers, J.S.3
  • 6
    • 0036642338 scopus 로고    scopus 로고
    • "Threshold break rate for pipeline replacement in water distribution system"
    • JWRMD50733-949610.1061/(ASCE)0733-9496(2002)128:4(271)
    • Loganathan, G. V., Park, S., and Sherali, H. D. (2002). "Threshold break rate for pipeline replacement in water distribution system." J. Water Resour. Plan. Manage. JWRMD50733-949610.1061/ (ASCE)0733-9496(2002)128:4(271), 128(4), 271-287.
    • (2002) J. Water Resour. Plan. Manage. , vol.128 , Issue.4 , pp. 271-287
    • Loganathan, G.V.1    Park, S.2    Sherali, H.D.3
  • 8
    • 0018318075 scopus 로고
    • "An analytical approach to scheduling pipe replacement"
    • JAWWA50003-150X
    • Shamir, U., and Howard, C. D. D. (1979). "An analytical approach to scheduling pipe replacement." J. Am. Water Works Assoc. JAWWA50003-150X, 71(5), 248-258.
    • (1979) J. Am. Water Works Assoc. , vol.71 , Issue.5 , pp. 248-258
    • Shamir, U.1    Howard, C.D.D.2
  • 9
    • 0020098396 scopus 로고
    • "Economic analysis of water main breaks"
    • JAWWA50003-150X
    • Walski, T. M., and Pelliccia, A. (1982). "Economic analysis of water main breaks." J. Am. Water Works Assoc. JAWWA50003-150X, 74(3), 140-147.
    • (1982) J. Am. Water Works Assoc. , vol.74 , Issue.3 , pp. 140-147
    • Walski, T.M.1    Pelliccia, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.