메뉴 건너뛰기




Volumn 44, Issue 18-19, 2006, Pages 4011-4025

Engineering management and the order entry point

Author keywords

Architectural innovation; Customization; Engineering management; Modular design; Order Entry Points

Indexed keywords

CUSTOMER SATISFACTION; INVENTORY CONTROL; OPERATIONS RESEARCH; PRODUCT DEVELOPMENT; PRODUCTION ENGINEERING; REQUIREMENTS ENGINEERING;

EID: 33746789356     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540600696328     Document Type: Conference Paper
Times cited : (41)

References (44)
  • 2
    • 0011788745 scopus 로고
    • Technisch management van produktwijzigmgen, Deel 1: Produktwijzigingen aan de lopende band
    • Bikker, H., Technisch management van produktwijzigmgen, Deel 1: Produktwijzigingen aan de lopende band, de Constructeur, 1992, 92, 22-30.
    • (1992) De Constructeur , vol.92 , pp. 22-30
    • Bikker, H.1
  • 4
    • 0023451389 scopus 로고
    • Systematic product breakdown as a major tool for productivity improvement
    • Bikker, H. and van der Heyden, W., Systematic Product Breakdown as a major tool for productivity improvement. Int. J. Prod. Res., 1987, 25, 1635-1644.
    • (1987) Int. J. Prod. Res. , vol.25 , pp. 1635-1644
    • Bikker, H.1    Van Der Heyden, W.2
  • 7
    • 0001634042 scopus 로고    scopus 로고
    • Supply chain migration from lean and functional to agile and customised
    • Christopher, M. and Towill, D.R., Supply chain migration from lean and functional to agile and customised. Supply Chain Manage., 2000, 5, 206-213.
    • (2000) Supply Chain Manage. , vol.5 , pp. 206-213
    • Christopher, M.1    Towill, D.R.2
  • 9
    • 0011606290 scopus 로고    scopus 로고
    • Concurrent engineering and project management as tools for product development
    • Dekkers, R., Concurrent engineering and project management as tools for product development, in 4th International Product Development Management Conference, 1997, pp. 241-250.
    • (1997) 4th International Product Development Management Conference , pp. 241-250
    • Dekkers, R.1
  • 10
    • 0038110576 scopus 로고    scopus 로고
    • Strategic capacity management: Balancing technological demands and performance criteria
    • Dekkers, R., Strategic capacity management: Balancing technological demands and performance criteria. J. Mater. Process. Technol, 2003, 139, 385-393.
    • (2003) J. Mater. Process. Technol , vol.139 , pp. 385-393
    • Dekkers, R.1
  • 13
    • 0035852790 scopus 로고    scopus 로고
    • Make to stock or make to order: The decoupling point in the food processing industries
    • van Donk, D.P., Make to stock or make to order: The decoupling point in the food processing industries. Int. J. Prod. Econ., 2001, 69, 297-306.
    • (2001) Int. J. Prod. Econ. , vol.69 , pp. 297-306
    • Van Donk, D.P.1
  • 14
    • 33746860166 scopus 로고
    • Ontwerpen en het realiseren van waarden
    • Eekels, J., Ontwerpen en het realiseren van waarden. de Ingenieur, 1993, 6, 44-47.
    • (1993) De Ingenieur , vol.6 , pp. 44-47
    • Eekels, J.1
  • 15
    • 33746808872 scopus 로고
    • Paradigms for future manufacturing systems (keynote)
    • Amsterdam
    • Furukawa, Y., Paradigms for Future Manufacturing Systems (keynote), in 9th Annual Conference CIM Europe, Amsterdam, 1993.
    • (1993) 9th Annual Conference CIM Europe
    • Furukawa, Y.1
  • 16
    • 0000535028 scopus 로고
    • Dynamics of the customer order decoupling point: Impact on information systems for production control
    • Giesberts, P.M.J. and van den Tang, L., Dynamics of the customer order decoupling point: impact on information systems for production control. Prod. Plan. Control, 1992, 3, 300-313.
    • (1992) Prod. Plan. Control , vol.3 , pp. 300-313
    • Giesberts, P.M.J.1    Van Den Tang, L.2
  • 18
    • 0001780709 scopus 로고    scopus 로고
    • Optimizing strategic safety stock placement in supply chains
    • Graves, S.C. and Willems, S.P., Optimizing strategic safety stock placement in supply chains. Manuf. Serv. Oper. Manage., 2000, 2, 68-83.
    • (2000) Manuf. Serv. Oper. Manage. , vol.2 , pp. 68-83
    • Graves, S.C.1    Willems, S.P.2
  • 19
    • 0035815832 scopus 로고    scopus 로고
    • Production planning in Japan: Rediscovering lost experiences or new insights?
    • de Haan, J., Yamamoto, M. and Lovink, G., Production planning in Japan: rediscovering lost experiences or new insights? Int. J. Prod. Econ., 2001, 71, 101-109.
    • (2001) Int. J. Prod. Econ. , vol.71 , pp. 101-109
    • De Haan, J.1    Yamamoto, M.2    Lovink, G.3
  • 20
    • 0001511053 scopus 로고
    • Architectural innovation: The reconfiguration of existing product technologies and the failure of established firms
    • Henderson, R. and Clark, K., Architectural innovation: the reconfiguration of existing product technologies and the failure of established firms. Admin. Sci. Quart., 1990, 35, 9-30.
    • (1990) Admin. Sci. Quart. , vol.35 , pp. 9-30
    • Henderson, R.1    Clark, K.2
  • 23
    • 0003081729 scopus 로고    scopus 로고
    • Factory on demand: The shaping of an agile production network
    • Lee, W.B. and Lau, H.C.W., Factory on demand: the shaping of an agile production network. Int. J. Agile Manage. Syst., 1999, 1, 83-87.
    • (1999) Int. J. Agile Manage. Syst. , vol.1 , pp. 83-87
    • Lee, W.B.1    Lau, H.C.W.2
  • 25
    • 0002220721 scopus 로고
    • The product family and the dynamics of core capability
    • Meyer, M.H. and Utterback, J.M., The product family and the dynamics of core capability. Sloan Manage. Rev., 1993, 34, 29-47.
    • (1993) Sloan Manage. Rev. , vol.34 , pp. 29-47
    • Meyer, M.H.1    Utterback, J.M.2
  • 26
    • 3142749667 scopus 로고    scopus 로고
    • Supply-chain integration: Implications for mass customization and postponement strategies
    • Mikkola, J.H. and Skjøtt-Larsen, T., Supply-chain integration: implications for mass customization and postponement strategies. Prod. Plan. Control, 2004, 15, 352-361.
    • (2004) Prod. Plan. Control , vol.15 , pp. 352-361
    • Mikkola, J.H.1    Skjøtt-Larsen, T.2
  • 27
    • 0344240982 scopus 로고    scopus 로고
    • Integrating the lean and agility manufacturing paradigms in the total supply chain
    • Naylor, J.B., Naim, M.M. and Berry, D., Leagility: integrating the lean and agility manufacturing paradigms in the total supply chain. Int. J. Prod. Econ., 1999, 62, 107-118.
    • (1999) Int. J. Prod. Econ. , vol.62 , pp. 107-118
    • Naylor, J.B.1    Naim, M.M.2    Leagility, B.D.3
  • 28
    • 0037810496 scopus 로고    scopus 로고
    • Strategic positioning of the order penetration point
    • Olhager, J., Strategic positioning of the order penetration point. Int. J. Prod. Econ., 2003, 85, 319-329.
    • (2003) Int. J. Prod. Econ. , vol.85 , pp. 319-329
    • Olhager, J.1
  • 29
    • 0000973709 scopus 로고    scopus 로고
    • The strategic choice of simultaneous versus sequential engineering for the introduction of new products
    • Riedel, J. and Pawar, K.S., The strategic choice of simultaneous versus sequential engineering for the introduction of new products. Int. J. Technol. Manage., 1998, 6, 321-334.
    • (1998) Int. J. Technol. Manage. , vol.6 , pp. 321-334
    • Riedel, J.1    Pawar, K.S.2
  • 30
    • 3142674870 scopus 로고    scopus 로고
    • Mass customization in terms of the customer order decoupling point
    • Rudberg, M. and Wikner, J., Mass customization in terms of the customer order decoupling point. Prod. Plan. Control, 2004, 15, 445-458.
    • (2004) Prod. Plan. Control , vol.15 , pp. 445-458
    • Rudberg, M.1    Wikner, J.2
  • 31
    • 0034288912 scopus 로고    scopus 로고
    • A multi-objective approach to simultaneous strategic and operational planning in supply chain design
    • Sabri, E.H. and Beamon, B.M., A multi-objective approach to simultaneous strategic and operational planning in supply chain design. Omega, 2000, 28, 581-598.
    • (2000) Omega , vol.28 , pp. 581-598
    • Sabri, E.H.1    Beamon, B.M.2
  • 32
    • 85050417347 scopus 로고    scopus 로고
    • Creating modular platforms for strategic flexibility
    • Sanchez, R., Creating modular platforms for strategic flexibility. Des. Manage. Rev., 2004, 15, 58-67.
    • (2004) Des. Manage. Rev. , vol.15 , pp. 58-67
    • Sanchez, R.1
  • 33
    • 2742527037 scopus 로고    scopus 로고
    • Komplexitätsmanagement im St. Galler Management-konzept
    • Schuh, G., Schwenk, U. and Speth, C., Komplexitätsmanagement im St. Galler Management-Konzept, io Management, 1998, 3, 78-85.
    • (1998) Io Management , vol.3 , pp. 78-85
    • Schuh, G.1    Schwenk, U.2    Speth, C.3
  • 34
    • 0002249048 scopus 로고
    • The rediscovery of logistics
    • Sharman, G., The rediscovery of logistics. Harv. Bus. Rev., 1984, 62, 71-80.
    • (1984) Harv. Bus. Rev. , vol.62 , pp. 71-80
    • Sharman, G.1
  • 35
    • 0034765872 scopus 로고    scopus 로고
    • Product platform design: Method and application
    • Simpson, T.W., Maier, J.R.A. and Mistree, F., Product platform design: method and application. Res. Eng. Des., 2001, 13, 2-22.
    • (2001) Res. Eng. Des. , vol.13 , pp. 2-22
    • Simpson, T.W.1    Maier, J.R.A.2    Mistree, F.3
  • 36
    • 3543084481 scopus 로고    scopus 로고
    • Product customisation and manufacturing strategy
    • Spring, M. and Dalrymple, J.F., Product customisation and manufacturing strategy. Int. J. Oper. Prod. Manage., 2000, 20, 441-467.
    • (2000) Int. J. Oper. Prod. Manage. , vol.20 , pp. 441-467
    • Spring, M.1    Dalrymple, J.F.2
  • 37
    • 33746840418 scopus 로고
    • Technisch management van produktwijzigingen, Deel 2: Produktwijziging en logistiek
    • van der Sterre, A.H.J., Technisch management van produktwijzigingen, Deel 2: Produktwijziging en logistiek. de Constructeur, 1992, 92, 50-54.
    • (1992) De Constructeur , vol.92 , pp. 50-54
    • Van Der Sterre, A.H.J.1
  • 38
    • 0040927869 scopus 로고    scopus 로고
    • A heuristic method for identifying modules for product architectures
    • Stone, R.B., Wood, K.L. and Crawford, R.H., A heuristic method for identifying modules for product architectures. Des. Stud., 2000, 21, 5-31.
    • (2000) Des. Stud. , vol.21 , pp. 5-31
    • Stone, R.B.1    Wood, K.L.2    Crawford, R.H.3
  • 40
    • 0032675551 scopus 로고    scopus 로고
    • Design requirements for health care production control systems
    • de Vries, G., Bertrand, J.W.M. and Vissers, J.M.H., Design requirements for health care production control systems. Prod. Plan. Control, 1999, 10, 559-569.
    • (1999) Prod. Plan. Control , vol.10 , pp. 559-569
    • De Vries, G.1    Bertrand, J.W.M.2    Vissers, J.M.H.3
  • 42
    • 33746784965 scopus 로고
    • Produktlogik, ein hilfsmittel zur automatisierung von varianten- und anpassungskonstruktionen
    • Weinbrenner, V. and Ehrlenspiel, K., Produktlogik, Ein Hilfsmittel zur Automatisierung von Varianten- und Anpassungskonstruktionen, in International Conference on Engineering Design, 1993, pp. 1594-1601.
    • (1993) International Conference on Engineering Design , pp. 1594-1601
    • Weinbrenner, V.1    Ehrlenspiel, K.2
  • 43
    • 0037943470 scopus 로고
    • Assemble-to-order manufacturing: Implications for materials management
    • Wemmerlöv, U., Assemble-to-order manufacturing: implications for materials management. J. Oper. Manage., 1984, 4, 347-368.
    • (1984) J. Oper. Manage. , vol.4 , pp. 347-368
    • Wemmerlöv, U.1
  • 44
    • 0011545735 scopus 로고    scopus 로고
    • Logistikgerechte produktstrukturen bei marktorientierter Variantenvielfalt
    • Wüpping, J., Logistikgerechte produktstrukturen bei marktorientierter Variantenvielfalt. io Management, 1998, 1/2, 76-81.
    • (1998) Io Management , vol.1-2 , pp. 76-81
    • Wüpping, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.