메뉴 건너뛰기




Volumn 16, Issue 2, 2006, Pages 1350-1353

Design of thick septa magnets based on 3D field calculation for the 3 GeV rapid cycling synchrotron of J-PARC

Author keywords

Leakage field; Magnetic vacuum chamber; Proton synchrotron; Septum magnet

Indexed keywords

COMPUTATION THEORY; MAGNETIC FIELD EFFECTS; MAINTENANCE; PARTICLE ACCELERATORS; SYNCHROTRONS; THREE DIMENSIONAL COMPUTER GRAPHICS;

EID: 33746646013     PISSN: 10518223     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASC.2005.864358     Document Type: Conference Paper
Times cited : (7)

References (3)
  • 1
    • 84886899686 scopus 로고    scopus 로고
    • Accelerator technical design report for high-intensity proton accelerator project, J-PARC
    • "Accelerator technical design report for high-intensity proton accelerator project, J-PARC," JAERI Tech. Rep., 2003-044 and KEK Rep. 2002-13.
    • JAERI Tech. Rep., 2003-044 and KEK Rep. 2002-13
  • 2
    • 85069023503 scopus 로고    scopus 로고
    • MARSH shielding calculations for the J-PARC 3 GeV RCS
    • N. Nakao et al., "MARSH shielding calculations for the J-PARC 3 GeV RCS," KEK rep. 2004-1.
    • KEK Rep. , vol.2004 , Issue.1
    • Nakao, N.1
  • 3
    • 85069011032 scopus 로고    scopus 로고
    • [Online]
    • [Online]. Available: http://www.tohokusteel.com/


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.