메뉴 건너뛰기




Volumn 17, Issue 6, 2006, Pages 700-720

Risk management in supply chain: A real option approach

Author keywords

Risk management; Supplier relations; Supply chain management

Indexed keywords

COMPUTER SOFTWARE; INVENTORY CONTROL; MATHEMATICAL MODELS; OUTSOURCING; PRODUCTION ENGINEERING; RISK ASSESSMENT; SELECTION; THEOREM PROVING;

EID: 33746608521     PISSN: 1741038X     EISSN: None     Source Type: Journal    
DOI: 10.1108/17410380610678756     Document Type: Article
Times cited : (194)

References (41)
  • 1
    • 0001939620 scopus 로고
    • What is risk anyway?
    • Bettis, R.A. Thomas, H. JAI Press Greenwich, CT
    • Baird, I.S. and Thomas, H. (1990), "What is risk anyway?", in Bettis, R.A. and Thomas, H. (Eds), Risk, Strategy, and Management, JAI Press, Greenwich, CT, pp. 21-52.
    • (1990) Risk, Strategy, and Management , pp. 21-52
    • Baird, I.S.1    Thomas, H.2
  • 2
    • 0036754796 scopus 로고    scopus 로고
    • Managing information technology investment risk: A real option perspective
    • Benaroch, M. (2002), "Managing information technology investment risk: a real option perspective", Journal of Management Information Systems, Vol. 19 No. 2, pp. 43-84.
    • (2002) Journal of Management Information Systems , vol.19 , Issue.2 , pp. 43-84
    • Benaroch, M.1
  • 3
    • 0001662131 scopus 로고    scopus 로고
    • Justifying electronic banking network expansion using real options analysis
    • Benaroch, M. and Kauffman, R.J. (2000), "Justifying electronic banking network expansion using real options analysis", MIS Quarterly, Vol. 24 No. 2, pp. 197-225.
    • (2000) MIS Quarterly , vol.24 , Issue.2 , pp. 197-225
    • Benaroch, M.1    Kauffman, R.J.2
  • 4
    • 0010369181 scopus 로고    scopus 로고
    • The role of risk in environment related supplier initiatives
    • paper presented, London
    • Bowen, F.E., Cousins, P.D. and Lamming, R.C. (1998), "The role of risk in environment related supplier initiatives", paper presented at the 7th Annual IPSERA Conference, London.
    • (1998) 7th Annual IPSERA Conference
    • Bowen, F.E.1    Cousins, P.D.2    Lamming, R.C.3
  • 5
    • 0002398128 scopus 로고
    • A new approach to evaluating natural resource investments
    • Brennan, M. and Swartz, E. (1985), "A new approach to evaluating natural resource investments", Midland Corporate Finance Journal, Vol. 3 No. 1, pp. 37-47.
    • (1985) Midland Corporate Finance Journal , vol.3 , Issue.1 , pp. 37-47
    • Brennan, M.1    Swartz, E.2
  • 6
    • 14044268769 scopus 로고    scopus 로고
    • Real option's model to evaluate infrastructure flexibility: An application to photovoltaic technology
    • Calabrese, A., Gastaldi, M. and Levialdi Ghiron, N. (2005), "Real option's model to evaluate infrastructure flexibility: an application to photovoltaic technology", International Journal of Technology Management, Vol. 29 Nos 1/2, pp. 173-91.
    • (2005) International Journal of Technology Management , vol.29 , Issue.12 , pp. 173-191
    • Calabrese, A.1    Gastaldi, M.2    Levialdi Ghiron, N.3
  • 8
    • 0010007726 scopus 로고
    • Strategic information technology investments: Guideline
    • Clemons, E.K. and Weber, B. (1990), "Strategic information technology investments: guideline", Journal of Management Information Systems, Vol. 7 No. 2, pp. 9-28.
    • (1990) Journal of Management Information Systems , vol.7 , Issue.2 , pp. 9-28
    • Clemons, E.K.1    Weber, B.2
  • 9
    • 0003304564 scopus 로고    scopus 로고
    • Global supply chain management: A survey of research and applications
    • Tayur, S. Ganeshan, R. Kluwer Boston, MA
    • Cohen, M.A. and Huchzermeier, A. (1999), "Global supply chain management: a survey of research and applications", in Tayur, S. and Ganeshan, R. (Eds), Quantitative Models for Supply Chain Management, Kluwer, Boston, MA, pp. 669-702.
    • (1999) Quantitative Models for Supply Chain Management , pp. 669-702
    • Cohen, M.A.1    Huchzermeier, A.2
  • 11
    • 0347174927 scopus 로고    scopus 로고
    • Strategic supply and the management of inter- and intra-organisational relationships
    • Cousins, P.D. and Spekman, R. (2003), "Strategic supply and the management of inter- and intra-organisational relationships", Journal of Purchasing & Supply Management, Vol. 9 No. 1, pp. 19-29.
    • (2003) Journal of Purchasing & Supply Management , vol.9 , Issue.1 , pp. 19-29
    • Cousins, P.D.1    Spekman, R.2
  • 12
    • 0033339557 scopus 로고    scopus 로고
    • Quantitative approaches for assessing the value of COTS-centric development
    • paper presented, West Palm Beach, FL
    • Hakan, E. and Vandergraaf, J. (1999), "Quantitative approaches for assessing the value of COTS-centric development", paper presented at the 6th International Symposium on Software Metrics (METRICS'99), West Palm Beach, FL.
    • (1999) 6th International Symposium on Software Metrics (METRICS'99)
    • Hakan, E.1    Vandergraaf, J.2
  • 15
    • 33746630705 scopus 로고    scopus 로고
    • Trust, power, dependence, and economics: Can SCM research borrow paradigms?
    • Handfield, R.B. and Bechtel, C. (2004), "Trust, power, dependence, and economics: can SCM research borrow paradigms?", International Journal of Integrated Supply Management, Vol. 1 No. 1, pp. 3-32.
    • (2004) International Journal of Integrated Supply Management , vol.1 , Issue.1 , pp. 3-32
    • Handfield, R.B.1    Bechtel, C.2
  • 18
    • 17144382528 scopus 로고    scopus 로고
    • Vauling operational flexibility under exchange rate risk
    • Huchzermeier, A. and Cohen, M. (1996), "Vauling operational flexibility under exchange rate risk", Operations Research, Vol. 44 No. 1, pp. 100-13.
    • (1996) Operations Research , vol.44 , Issue.1 , pp. 100-113
    • Huchzermeier, A.1    Cohen, M.2
  • 19
    • 0003145343 scopus 로고
    • Waiting to invest: Investment and uncertainty
    • Ingersoll, J. and Ross, S. (1992), "Waiting to invest: investment and uncertainty", Journal of Business, Vol. 65 No. 1, pp. 1-29.
    • (1992) Journal of Business , vol.65 , Issue.1 , pp. 1-29
    • Ingersoll, J.1    Ross, S.2
  • 20
    • 2342595914 scopus 로고    scopus 로고
    • MRP-controlled batch-manufacturing environment under uncertainty
    • Koh, S.C.L. (2004), "MRP-controlled batch-manufacturing environment under uncertainty", Journal of The Operational Research Society, Vol. 55 No. 3, pp. 219-32.
    • (2004) Journal of the Operational Research Society , vol.55 , Issue.3 , pp. 219-232
    • Koh, S.C.L.1
  • 21
    • 2942574727 scopus 로고    scopus 로고
    • Modelling uncertainty under a multi-echelon ERP-controlled manufacturing system
    • Koh, S.C.L. and Saad, S.M. (2004), "Modelling uncertainty under a multi-echelon ERP-controlled manufacturing system", International Journal of Integrated Manufacturing Systems, Vol. 15 No. 3, pp. 239-53.
    • (2004) International Journal of Integrated Manufacturing Systems , vol.15 , Issue.3 , pp. 239-253
    • Koh, S.C.L.1    Saad, S.M.2
  • 23
    • 33746628742 scopus 로고    scopus 로고
    • Challanges to the practical implementation of modeling and valuing real option
    • Lander, D.M. and Pinches, G.E. (1998), "Challanges to the practical implementation of modeling and valuing real option", The Quarterly Review of Economics and Finance, Vol. 44 No. 5, pp. 751-67.
    • (1998) The Quarterly Review of Economics and Finance , vol.44 , Issue.5 , pp. 751-767
    • Lander, D.M.1    Pinches, G.E.2
  • 24
    • 0006461887 scopus 로고    scopus 로고
    • Total strategies for company-wide risk control
    • Meulbrook, L. (2000), "Total strategies for company-wide risk control", Financial Times, Vol. 9.
    • (2000) Financial Times , vol.9
    • Meulbrook, L.1
  • 25
    • 84982039701 scopus 로고
    • Organizational risk perception and reduction - A literature review
    • Mitchell, V.W. (1995), "Organizational risk perception and reduction - a literature review", British Journal of Management, Vol. 6, pp. 115-33.
    • (1995) British Journal of Management , vol.6 , pp. 115-133
    • Mitchell, V.W.1
  • 26
    • 0000888844 scopus 로고
    • Irreversible investment, capacity choice and the value of the firm
    • Pindyck, R. (1988), "Irreversible investment, capacity choice and the value of the firm", The American Economic Review, Vol. 78 No. 5, pp. 969-85.
    • (1988) The American Economic Review , vol.78 , Issue.5 , pp. 969-985
    • Pindyck, R.1
  • 27
    • 0000966878 scopus 로고
    • Software development outsourcing contract structure and business value
    • Richmond, W.B. and Seidmann, A. (1993), "Software development outsourcing contract structure and business value", Journal of Management Information Systems, Vol. 10 No. 1, pp. 57-72.
    • (1993) Journal of Management Information Systems , vol.10 , Issue.1 , pp. 57-72
    • Richmond, W.B.1    Seidmann, A.2
  • 28
    • 27744499708 scopus 로고    scopus 로고
    • Applying a strategic planning process to several supply chain partners
    • Sadler, I. and Gough, R. (2005), "Applying a strategic planning process to several supply chain partners", Journal of Manufacturing Technology Management, Vol. 16 No. 8, pp. 890-908.
    • (2005) Journal of Manufacturing Technology Management , vol.16 , Issue.8 , pp. 890-908
    • Sadler, I.1    Gough, R.2
  • 32
    • 84993000244 scopus 로고    scopus 로고
    • Supply chain management under the threat of international terrorism
    • Sheffi, Y. (2001), "Supply chain management under the threat of international terrorism", International Journal of Logistics Management, Vol. 12 No. 2, pp. 1-11.
    • (2001) International Journal of Logistics Management , vol.12 , Issue.2 , pp. 1-11
    • Sheffi, Y.1
  • 33
    • 0033124438 scopus 로고    scopus 로고
    • How risky is your company?
    • Simons, R.L. (1999), "How risky is your company?", Harvard Business Review, Vol. 77 No. 3, pp. 85-95.
    • (1999) Harvard Business Review , vol.77 , Issue.3 , pp. 85-95
    • Simons, R.L.1
  • 34
    • 84986131521 scopus 로고    scopus 로고
    • Risk and organisational behaviour: A research model
    • Smallman, C. (1996), "Risk and organisational behaviour: a research model", Disaster Prevention and Management, Vol. 5 No. 2, pp. 12-26.
    • (1996) Disaster Prevention and Management , vol.5 , Issue.2 , pp. 12-26
    • Smallman, C.1
  • 35
    • 0000832328 scopus 로고    scopus 로고
    • Options analysis of software platform decisions: A case study
    • Taudes, A., Feurstein, M. and Mild, A. (2000), "Options analysis of software platform decisions: a case study", MIS Quarterly, Vol. 24 No. 2, pp. 227-43.
    • (2000) MIS Quarterly , vol.24 , Issue.2 , pp. 227-243
    • Taudes, A.1    Feurstein, M.2    Mild, A.3
  • 39
    • 0036830708 scopus 로고    scopus 로고
    • Robust planning: A new paradigm for demand chain planning
    • Van Landeghem, H. and Vanmaele, H. (2002), "Robust planning: a new paradigm for demand chain planning", Journal of operations Management, Vol. 20, pp. 769-83.
    • (2002) Journal of Operations Management , vol.20 , pp. 769-783
    • Van Landeghem, H.1    Vanmaele, H.2
  • 40
    • 0011256425 scopus 로고    scopus 로고
    • Evaluating information technology investment: Cash flows or growth options?
    • paper presented, Charlotte, NC
    • Zhu, K. (1999), "Evaluating information technology investment: cash flows or growth options?", paper presented at Workshop on Information Systems Economics (WISE'99), Charlotte, NC.
    • (1999) Workshop on Information Systems Economics (WISE'99)
    • Zhu, K.1
  • 41
    • 1642445950 scopus 로고    scopus 로고
    • Purchasing organization involvement in risk assessments, contingency plans, and risk management: An exploratory study
    • Zsidisin, G.A., Panelli, A. and Upton, R. (2000), "Purchasing organization involvement in risk assessments, contingency plans, and risk management: an exploratory study", Supply Chain Management: An International Journal, Vol. 5 No. 4, pp. 187-97.
    • (2000) Supply Chain Management: An International Journal , vol.5 , Issue.4 , pp. 187-197
    • Zsidisin, G.A.1    Panelli, A.2    Upton, R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.