메뉴 건너뛰기




Volumn 3, Issue 6, 2001, Pages 528-549

Evaluating functional and cellular manufacturing systems: a model and case analysis

Author keywords

Cellular manufacturing; comparative performance; functional layout; set up time reduction

Indexed keywords


EID: 33746575131     PISSN: 13682148     EISSN: None     Source Type: Journal    
DOI: 10.1504/IJMTM.2001.001428     Document Type: Article
Times cited : (5)

References (31)
  • 1
    • 0039900597 scopus 로고
    • The potential of group technology for US manufacturing
    • Hyer, N.L. (1984) ‘The potential of group technology for US manufacturing’, Journal of Operations Management, Vol. 4, No. 3, pp.183–202.
    • (1984) Journal of Operations Management , vol.4 , Issue.3 , pp. 183-202
    • Hyer, N.L.1
  • 2
    • 0024731850 scopus 로고
    • Cellular manufacturing in the US industry: a survey of users
    • Wemmerlov, U. and Hyer, N.L. (1989) ‘Cellular manufacturing in the US industry: a survey of users’, International Journal of Production Research, Vol. 27, No. 9, pp.1511–1530.
    • (1989) International Journal of Production Research , vol.27 , Issue.9 , pp. 1511-1530
    • Wemmerlov, U.1    Hyer, N.L.2
  • 5
    • 84925911130 scopus 로고
    • The group technology myths
    • Leonard, R. and Rathmill, K. (1977) ‘The group technology myths’, Management Today, Vol. 1, pp.66–69.
    • (1977) Management Today , vol.1 , pp. 66-69
    • Leonard, R.1    Rathmill, K.2
  • 7
    • 38249034192 scopus 로고
    • Repetitive lots: the use of a sequence dependent set-up time scheduling procedure in group technology and traditional job-shop
    • Flynn, B.B. (1987) ‘Repetitive lots: the use of a sequence dependent set-up time scheduling procedure in group technology and traditional job-shop’, Journal of Operations Management, Vol. 7, No. 2, pp.203–216.
    • (1987) Journal of Operations Management , vol.7 , Issue.2 , pp. 203-216
    • Flynn, B.B.1
  • 8
    • 84985773741 scopus 로고
    • An experimental comparison of cellular (group technology) layout with process layout
    • Flynn, B.B. and Jacobs, F.R. (1987) ‘An experimental comparison of cellular (group technology) layout with process layout’, Decision Sciences, Vol. 18, pp.562–581.
    • (1987) Decision Sciences , vol.18 , pp. 562-581
    • Flynn, B.B.1    Jacobs, F.R.2
  • 9
    • 0025560330 scopus 로고
    • A simulation analysis of factors influencing the attractiveness of group technology cellular layouts
    • Morris, S.J. and Tersine, R.J. (1990) ‘A simulation analysis of factors influencing the attractiveness of group technology cellular layouts’, Management Science, Vol. 36, No. 12, pp.1567–1578.
    • (1990) Management Science , vol.36 , Issue.12 , pp. 1567-1578
    • Morris, S.J.1    Tersine, R.J.2
  • 10
    • 0031622580 scopus 로고    scopus 로고
    • A review and analysis of comparative performance studies on cellular and functional manufacturing layouts
    • Agarwal, A. and Sarkis, J. (1998) ‘A review and analysis of comparative performance studies on cellular and functional manufacturing layouts’, Computers and Industrial Engineering, Vol. 34, No. 1, pp.77–98.
    • (1998) Computers and Industrial Engineering , vol.34 , Issue.1 , pp. 77-98
    • Agarwal, A.1    Sarkis, J.2
  • 11
    • 0343006275 scopus 로고    scopus 로고
    • On the relative performance of functional and cellular layouts: an analysis of the model-based comparative studies literature
    • Johnson, D.J. and Wemmmerlov, W. (1996) ‘On the relative performance of functional and cellular layouts: an analysis of the model-based comparative studies literature’, Production and Operations Management, Vol. 5, No. 1, pp.309–334.
    • (1996) Production and Operations Management , vol.5 , Issue.1 , pp. 309-334
    • Johnson, D.J.1    Wemmmerlov, W.2
  • 12
    • 0026866118 scopus 로고
    • Change to group technology: process organization is obsolete
    • Burbidge, J.L. (1992) ‘Change to group technology: process organization is obsolete’, International Journal of Production Research, Vol. 30, No. 5, pp.1209–1219.
    • (1992) International Journal of Production Research , vol.30 , Issue.5 , pp. 1209-1219
    • Burbidge, J.L.1
  • 14
    • 0025485232 scopus 로고
    • An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell
    • Mahmoodi, F., Dooley, K.J. and Starr, P.J. (1990) ‘An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell’, International Journal of Production Research, Vol. 28, No. 9, pp.1695–1711.
    • (1990) International Journal of Production Research , vol.28 , Issue.9 , pp. 1695-1711
    • Mahmoodi, F.1    Dooley, K.J.2    Starr, P.J.3
  • 15
    • 0027148704 scopus 로고
    • Is the full potential of cellular manufacturing being achieved
    • Jordan, P.C. and Frazier, G.V. (1993) ‘Is the full potential of cellular manufacturing being achieved’, Production and Inventory Management Journal, Vol. 34, No. 1, pp.70–72.
    • (1993) Production and Inventory Management Journal , vol.34 , Issue.1 , pp. 70-72
    • Jordan, P.C.1    Frazier, G.V.2
  • 16
    • 84985788221 scopus 로고    scopus 로고
    • Partitioning work centers for group technology: analytical extension and shop- level simulation investigation
    • Suresh, N.C. ‘Partitioning work centers for group technology: analytical extension and shop- level simulation investigation’, Decision Sciences, Vol. 23, pp.267–290.
    • Decision Sciences , vol.23 , pp. 267-290
    • Suresh, N.C.1
  • 17
    • 0023603692 scopus 로고
    • A method for planning analysis and design simulation of CIM systems
    • IEEE Computer Society Press
    • Anderson, K.R. (1987) ‘A method for planning analysis and design simulation of CIM systems’, Proceedings 1987 Winter Simulation Conference, IEEE Computer Society Press, pp.715–720.
    • (1987) Proceedings 1987 Winter Simulation Conference , pp. 715-720
    • Anderson, K.R.1
  • 18
    • 0002751207 scopus 로고
    • IBM combines rapid modeling technique and simulation to design PCB factory -of-the-future
    • Brown, E. (1988) ‘IBM combines rapid modeling technique and simulation to design PCB factory -of-the-future’, Industrial Engineering, Vol. 20, No. 6, pp.23–26.
    • (1988) Industrial Engineering , vol.20 , Issue.6 , pp. 23-26
    • Brown, E.1
  • 19
    • 84952174404 scopus 로고
    • An examination of the dynamic behavior of part- families in group technology
    • Gupta, R. M. and Tompkins, J. A. (1982) ‘An examination of the dynamic behavior of part- families in group technology’, International Journal of Production Research, Vol. 20, No. 1, pp.73–86.
    • (1982) International Journal of Production Research , vol.20 , Issue.1 , pp. 73-86
    • Gupta, R.M.1    Tompkins, J.A.2
  • 20
    • 0024714857 scopus 로고
    • Group technology in the US manufacturing industry: survey of current practices
    • Hyer, N.L. and Wemmerlov, U. (1989) ‘Group technology in the US manufacturing industry: survey of current practices’, International Journal of Production Research, Vol. 27, No. 8, pp.1287–1304.
    • (1989) International Journal of Production Research , vol.27 , Issue.8 , pp. 1287-1304
    • Hyer, N.L.1    Wemmerlov, U.2
  • 21
    • 0011718914 scopus 로고
    • A survey of cellular manufacturing cells
    • Pullen, R.D. (1976) ‘A survey of cellular manufacturing cells’, The Production Engineer, Vol. 55, pp.451–454.
    • (1976) The Production Engineer , vol.55 , pp. 451-454
    • Pullen, R.D.1
  • 22
    • 77957033398 scopus 로고
    • Performance evaluation of production networks
    • Suri, R., Sanders, J.L. and Kamath, M. (1993) ‘Performance evaluation of production networks’, Handbooks in OR & MS, Vol. 4, pp.199–285.
    • (1993) Handbooks in OR & MS , vol.4 , pp. 199-285
    • Suri, R.1    Sanders, J.L.2    Kamath, M.3
  • 23
    • 0001930641 scopus 로고
    • Jobshop-like queuing systems
    • Jackson, J.R. (1963) ‘Jobshop-like queuing systems’, Management Science, Vol. 10, No. 1, pp.131–142.
    • (1963) Management Science , vol.10 , Issue.1 , pp. 131-142
    • Jackson, J.R.1
  • 24
    • 0023310940 scopus 로고
    • Lot sizes, lead times and in-process inventories
    • Karmarkar, U.S. (1987) ‘Lot sizes, lead times and in-process inventories’, Management Science, Vol. 33, No. 3, pp.409–418.
    • (1987) Management Science , vol.33 , Issue.3 , pp. 409-418
    • Karmarkar, U.S.1
  • 25
    • 0022034627 scopus 로고
    • Lot-sizing and lead-time performance in a manufacturing cell
    • Karmarkar, U.S., Kekre, S., Kekre, S. and Freeman, S. (1985) ‘Lot-sizing and lead-time performance in a manufacturing cell’, Interfaces, Vol. 15, No. 2, pp.1–9.
    • (1985) Interfaces , vol.15 , Issue.2 , pp. 1-9
    • Karmarkar, U.S.1    Kekre, S.2    Kekre, S.3    Freeman, S.4
  • 26
    • 84985829464 scopus 로고
    • Partitioning work centers for group technology: insights from an analytical model
    • Suresh, N.C. (1991) ‘Partitioning work centers for group technology: insights from an analytical model’, Decision Sciences, Vol. 22, pp.772–791.
    • (1991) Decision Sciences , vol.22 , pp. 772-791
    • Suresh, N.C.1
  • 29
    • 0004244246 scopus 로고
    • North River Press, Inc., Croton-on-Hudson, NY
    • Goldratt, E.M. and Cox, J. (1992) The Goal, North River Press, Inc., Croton-on-Hudson, NY.
    • (1992) The Goal
    • Goldratt, E.M.1    Cox, J.2
  • 30
    • 0001451553 scopus 로고
    • Measuring manufacturing performance: a new challenge for managerial accounting research
    • Kaplan, R.S. (1983) ‘Measuring manufacturing performance: a new challenge for managerial accounting research’, The Accounting Review, October, pp.686–703.
    • (1983) The Accounting Review , vol.October , pp. 686-703
    • Kaplan, R.S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.