-
1
-
-
0025211593
-
Sequencing with earliness and tardiness penalties: A review
-
Baker K.R., Scudder C.D., Sequencing with earliness and tardiness penalties: a review, Operations Research 38 (1990) 22-36.
-
(1990)
Operations Research
, vol.38
, pp. 22-36
-
-
Baker, K.R.1
Scudder, C.D.2
-
2
-
-
0035145661
-
Heuristic algorithm for unrelated parallel machine scheduling with a common due date, relase dates, and linear earliness and tardiness penalties
-
Bank J., Werner F., Heuristic algorithm for unrelated parallel machine scheduling with a common due date, relase dates, and linear earliness and tardiness penalties, Mathematical and Computer Modelling 33 (2001) 363-383.
-
(2001)
Mathematical and Computer Modelling
, vol.33
, pp. 363-383
-
-
Bank, J.1
Werner, F.2
-
4
-
-
9444225978
-
Parallel genetic algorithm for minimizing total weighted completion time
-
Springer Verlag
-
Bożejko W., Wodecki M., Parallel genetic algorithm for minimizing total weighted completion time, Lecture Notes in Computer Science No. 3070, Springer Verlag (2004) 400-405.
-
(2004)
Lecture Notes in Computer Science No. 3070
, vol.3070
, pp. 400-405
-
-
Bozejko, W.1
Wodecki, M.2
-
5
-
-
33744515419
-
Block approach-tabu search algorithm for single machine total weighted tardiness problem
-
in press
-
Bożejko W., Grabowski J., Wodecki M., Block approach-tabu search algorithm for single machine total weighted tardiness problem, Computers & Industrial Engineering (2006) (in press).
-
(2006)
Computers & Industrial Engineering
-
-
Bozejko, W.1
Grabowski, J.2
Wodecki, M.3
-
6
-
-
33746224749
-
Parallel genetic algorithm for the flow shop scheduling problem
-
Springer Verlag
-
Bożejko W., Wodecki M, Parallel genetic algorithm for the flow shop scheduling problem, Lecture Notes in Computer Science No. 3019, Springer Verlag (2004) 566-571.
-
(2004)
Lecture Notes in Computer Science No. 3019
, vol.3019
, pp. 566-571
-
-
Bozejko, W.1
Wodecki, M.2
-
7
-
-
12444293774
-
Objectoriented implementation of parallel genetic algorithms
-
(R. Buyya, ed.), Prentice Hall
-
Bubak M., Sowa M., Objectoriented implementation of parallel genetic algorithms, in High Performance Cluster Computing: Programming and Applications (R. Buyya, ed.), 2, Prentice Hall (1999) 331-349.
-
(1999)
High Performance Cluster Computing: Programming and Applications
, vol.2
, pp. 331-349
-
-
Bubak, M.1
Sowa, M.2
-
8
-
-
0037290972
-
Single-machine scheduling for minimizing earliness and tardiness penalties by meta-heuristic approaches
-
Feldmann M., Biskup D., Single-machine scheduling for minimizing earliness and tardiness penalties by meta-heuristic approaches, Computers & Industrial Engineering 44 (2003) 307-323.
-
(2003)
Computers & Industrial Engineering
, vol.44
, pp. 307-323
-
-
Feldmann, M.1
Biskup, D.2
-
9
-
-
1942501670
-
A very fast tabu search algorithm for the permutation flow shop problem with makespan criterion
-
Grabowski J., Wodecki M., A very fast tabu search algorithm for the permutation flow shop problem with makespan criterion, Computers and Operations Research, 31 (2004) 1891-1909.
-
(2004)
Computers and Operations Research
, vol.31
, pp. 1891-1909
-
-
Grabowski, J.1
Wodecki, M.2
-
10
-
-
33744530716
-
A very fast tabu search algorithm for job shop problem
-
Rego C., Alidaee B. (editors), Kluwer Academic Publishers
-
Grabowski J., Wodecki M., A very fast tabu search algorithm for job shop problem, in: Rego C., Alidaee B. (editors), Adaptive memory and evolution: tabu search and scatter search, Kluwer Academic Publishers (2004).
-
(2004)
Adaptive Memory and Evolution: Tabu Search and Scatter Search
-
-
Grabowski, J.1
Wodecki, M.2
-
11
-
-
0037118177
-
A survey of the state-of-art of common due date assignment and scheduling research
-
Gordon V., Proth J.P., Chu C., A survey of the state-of-art of common due date assignment and scheduling research, European Journal of Operational Research 139 (2002) 1-25.
-
(2002)
European Journal of Operational Research
, vol.139
, pp. 1-25
-
-
Gordon, V.1
Proth, J.P.2
Chu, C.3
-
12
-
-
0001399202
-
A branch and bound algorithm for single-machine earliness-tardiness scheduling with idle time
-
Hoogeveen J.A., Van de Velde L.S., A branch and bound algorithm for single-machine earliness-tardiness scheduling with idle time, INFORMS Journal on Computing 8 (1996) 402-412.
-
(1996)
INFORMS Journal on Computing
, vol.8
, pp. 402-412
-
-
Hoogeveen, J.A.1
Van De Velde, L.S.2
-
13
-
-
0019702937
-
Minimizing the average deviation of job completion times about a common due date
-
Kanett J.J., Minimizing the average deviation of job completion times about a common due date. Naval Research Logistics 28 (1981) 643-651.
-
(1981)
Naval Research Logistics
, vol.28
, pp. 643-651
-
-
Kanett, J.J.1
-
14
-
-
0000902813
-
A generic algorithm for job sequencing problem with distinct due dates and general early-tardy penalty weights
-
Lee C.Y., Choi J.Y., A generic algorithm for job sequencing problem with distinct due dates and general early-tardy penalty weights, Computers and Operations Research 22 (1995) 857-869.
-
(1995)
Computers and Operations Research
, vol.22
, pp. 857-869
-
-
Lee, C.Y.1
Choi, J.Y.2
-
16
-
-
0001204823
-
A fast tabu search algorithm for the permutation flow shop problem
-
Nowicki E., Smutnicki C., A fast tabu search algorithm for the permutation flow shop problem, European Journal of Operational Research, 91 (1996) 160-175.
-
(1996)
European Journal of Operational Research
, vol.91
, pp. 160-175
-
-
Nowicki, E.1
Smutnicki, C.2
-
17
-
-
5244278595
-
A fast tabu search algorithm for the job shop problem
-
Nowicki E., Smutnicki C., A fast tabu search algorithm for the job shop problem, Management Science, 42 (1996) 797-813.
-
(1996)
Management Science
, vol.42
, pp. 797-813
-
-
Nowicki, E.1
Smutnicki, C.2
-
18
-
-
84941164665
-
-
OR-Library: http://people.brunel.ac.uk/mastjjb/jeb/info.html
-
-
-
-
20
-
-
0027557236
-
Adjacent ordering in single machine scheduling with earliness and tardiness penalties
-
Szwarc W., Adjacent ordering in single machine scheduling with earliness and tardiness penalties. Neval Research Logistics 40 (1993) 229-243.
-
(1993)
Neval Research Logistics
, vol.40
, pp. 229-243
-
-
Szwarc, W.1
-
23
-
-
14044249418
-
Fildered and recovering beam search algorithms for the early/tardy scheduling problem with no idle time
-
Valente J.M.S., Alves R.A.F.S., Fildered and recovering beam search algorithms for the early/tardy scheduling problem with no idle time, Computers & Industrial Engineering 48(2) (2005) 363-375.
-
(2005)
Computers & Industrial Engineering
, vol.48
, Issue.2
, pp. 363-375
-
-
Valente, J.M.S.1
Alves, R.A.F.S.2
-
24
-
-
0037120685
-
Tabu search for single machine scheduling with distinct due windows and weighted earliness/tardiness penalties
-
Wan G., Yen B.P.C., Tabu search for single machine scheduling with distinct due windows and weighted earliness/tardiness penalties, European Journal of Operational Research 142 (2002) 271-281.
-
(2002)
European Journal of Operational Research
, vol.142
, pp. 271-281
-
-
Wan, G.1
Yen, B.P.C.2
-
25
-
-
0026158109
-
Algorithms for a class of single machine weighted tardiness and earliness problems
-
Yano C.A., Kim Y.D., Algorithms for a class of single machine weighted tardiness and earliness problems, European Journal of Operational Research 52 (1991) 167-178.
-
(1991)
European Journal of Operational Research
, vol.52
, pp. 167-178
-
-
Yano, C.A.1
Kim, Y.D.2
|