-
2
-
-
0037410423
-
Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
-
Dubois, D., Fargier, H., Fortemps, P.: Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge. European Journal of Operational Research 147 (2003) 231-252
-
(2003)
European Journal of Operational Research
, vol.147
, pp. 231-252
-
-
Dubois, D.1
Fargier, H.2
Fortemps, P.3
-
3
-
-
0003430214
-
Scheduling under fuzziness
-
Słowiński, R., Hapke, M., eds. Physica-Verlag
-
Słowiński, R., Hapke, M., eds.: Scheduling Under Fuzziness. Volume 37 of Studies in Fuzziness and Soft Computing. Physica-Verlag (2000)
-
(2000)
Studies in Fuzziness and Soft Computing
, vol.37
-
-
-
4
-
-
0033093715
-
Production scheduling and rescheduling with genetic algorithms
-
Bierwirth, C., Mattfeld, D.C.: Production scheduling and rescheduling with genetic algorithms. Evolutionary Computation 7 (1999) 1-17
-
(1999)
Evolutionary Computation
, vol.7
, pp. 1-17
-
-
Bierwirth, C.1
Mattfeld, D.C.2
-
5
-
-
0031268178
-
Jobshop scheduling with imprecise durations: A fuzzy approach
-
Fortemps, P.: Jobshop scheduling with imprecise durations: a fuzzy approach. IEEE Transactions of Fuzzy Systems 7 (1997) 557-569
-
(1997)
IEEE Transactions of Fuzzy Systems
, vol.7
, pp. 557-569
-
-
Fortemps, P.1
-
6
-
-
0342526931
-
A review of some methods for ranking fuzzy subsets
-
Dubois, D., Prade, H., Yager, R., eds. Morgan Kaufmann
-
Bortolan, G., Degani, R.: A review of some methods for ranking fuzzy subsets. In Dubois, D., Prade, H., Yager, R., eds.: Readings in Fuzzy Sets for Intelligence Systems. Morgan Kaufmann (1993) 149-158
-
(1993)
Readings in Fuzzy Sets for Intelligence Systems
, pp. 149-158
-
-
Bortolan, G.1
Degani, R.2
-
7
-
-
0033881797
-
Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
-
Sakawa, M., Kubota, R.: Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms. European Journal of Operational Research 120 (2000) 393-407
-
(2000)
European Journal of Operational Research
, vol.120
, pp. 393-407
-
-
Sakawa, M.1
Kubota, R.2
-
8
-
-
0742321202
-
An evolutionary algorithm for pure fuzzy flow-shop scheduling problems
-
Celano, G., Costa, A., Fichera, S.: An evolutionary algorithm for pure fuzzy flow-shop scheduling problems. International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems 11 (2003) 655-669
-
(2003)
International Journal of Uncertainty, Fuzziness and Knowledge-based Systems
, vol.11
, pp. 655-669
-
-
Celano, G.1
Costa, A.2
Fichera, S.3
-
9
-
-
0022101320
-
A review of fuzzy set aggregation connectives
-
Dubois, D., Prade, H.: A review of fuzzy set aggregation connectives. Information Sciences 36 (1985) 85-121
-
(1985)
Information Sciences
, vol.36
, pp. 85-121
-
-
Dubois, D.1
Prade, H.2
-
10
-
-
26444559586
-
An evolutionary approach to designing and solving fuzzy job-shop problems
-
González Rodríguez, I., Vela, C.R., Puente, J.: An evolutionary approach to designing and solving fuzzy job-shop problems. Lecture Notes in Computer Science 3562 (2005) 74-83
-
(2005)
Lecture Notes in Computer Science
, vol.3562
, pp. 74-83
-
-
González Rodríguez, I.1
Vela, C.R.2
Puente, J.3
-
11
-
-
0000131281
-
Algorithms for solving production scheduling problems
-
Giffler, B., Thomson, G.L.: Algorithms for solving production scheduling problems. Operations Research 8 (1960) 487-503
-
(1960)
Operations Research
, vol.8
, pp. 487-503
-
-
Giffler, B.1
Thomson, G.L.2
-
12
-
-
0037448778
-
A knowledge-based evolutionary strategy for scheduling problems with bottlenecks
-
Varela, R., Vela, C.R., Puente, J., Gómez, A.: A knowledge-based evolutionary strategy for scheduling problems with bottlenecks. European Journal of Operational Research 145 (2003) 57-71
-
(2003)
European Journal of Operational Research
, vol.145
, pp. 57-71
-
-
Varela, R.1
Vela, C.R.2
Puente, J.3
Gómez, A.4
|