메뉴 건너뛰기




Volumn 2006, Issue , 2006, Pages 370-373

Lessons learned in applying domain-independent planning to high-speed manufacturing

Author keywords

[No Author keywords available]

Indexed keywords

DOMAIN INDEPENDENT PLANNING; GRAPH STYLE HEURISTIC; HIGH SPEED MANUFACTURING; REAL INDUSTRIAL PROBLEM;

EID: 33746103670     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (9)

References (10)
  • 1
    • 33746050596 scopus 로고    scopus 로고
    • Scheduling alternative activities
    • Beck, Chris, and Mark Fox. 1999. Scheduling alternative activities. In Proc. of AAAI-99).
    • (1999) Proc. of AAAI-99
    • Beck, C.1    Fox, M.2
  • 4
    • 0003767273 scopus 로고    scopus 로고
    • Model-based computing: Developing flexible machine control software
    • Fromherz, Markus P.J., Vijay A. Saraswat, and Daniel G. Bobrow. 1999. Model-based computing: Developing flexible machine control software. Artificial Intelligence 114(1-2):157-202.
    • (1999) Artificial Intelligence , vol.114 , Issue.1-2 , pp. 157-202
    • Fromherz, M.P.J.1    Saraswat, V.A.2    Bobrow, D.G.3
  • 5
    • 85166919496 scopus 로고
    • Representation and control in IxTeT, a temporal planner
    • Ghallab, Malik, and Hervé Laruelle. 1994. Representation and control in IxTeT, a temporal planner. In Proc. of AIPS-94, 61-67.
    • (1994) Proc. of AIPS-94 , pp. 61-67
    • Ghallab, M.1    Laruelle, H.2
  • 6
    • 0003264788 scopus 로고    scopus 로고
    • Heuristic planning with time and resources
    • Haslum, Patrik, and Héctor Geffner. 2001. Heuristic planning with time and resources. In Proc. of ECP-01.
    • (2001) Proc. of ECP-01
    • Haslum, P.1    Geffner, H.2
  • 7
    • 0039310873 scopus 로고
    • HSTS: Integrating planning and scheduling
    • ed. Monte Zweben and Mark S. Fox, chap. 6, Morgan Kaufmann
    • Muscettola, Nicola. 1994. HSTS: Integrating planning and scheduling. In Intelligent scheduling, ed. Monte Zweben and Mark S. Fox, chap. 6, 169-212. Morgan Kaufmann.
    • (1994) Intelligent Scheduling , pp. 169-212
    • Muscettola, N.1
  • 8
    • 84890309215 scopus 로고    scopus 로고
    • On-line planning and scheduling for high-speed manufacturing
    • Ruml, Wheeler, Minh Binh Do, and Markus Fromherz. 2005. On-line planning and scheduling for high-speed manufacturing. In Proc. of ICAPSO5, 30-39.
    • (2005) Proc. of ICAPSO5 , pp. 30-39
    • Ruml, W.1    Do, M.B.2    Fromherz, M.3
  • 10
    • 84880691938 scopus 로고    scopus 로고
    • Temporal planning with mutual exclusion reasoning
    • Smith, David E., and Daniel S. Weld. 1999. Temporal planning with mutual exclusion reasoning. In Proc. of IJCAI-99, 326-333.
    • (1999) Proc. of IJCAI-99 , pp. 326-333
    • Smith, D.E.1    Weld, D.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.