메뉴 건너뛰기




Volumn 2005, Issue , 2005, Pages 1323-1326

Risk-informed fire protection and fire PRA for duke power's oconee, catawba and mcGuire nuclear plants

Author keywords

[No Author keywords available]

Indexed keywords

FIRE SAFE SHUTDOWN ANALYSIS; NATIONAL FIRE PROTECTION CODE; RISK-INFORMED FIRE PROTECTION;

EID: 33745858635     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (1)

References (8)
  • 3
    • 67649524784 scopus 로고    scopus 로고
    • TR-1008239 and NUREG/CR-6850, Joint Project between the US Nuclear Regulatory Commission and the Electric Power Research Institute, April
    • TR-1008239 and NUREG/CR-6850, "Fire PRA Methodologies for Nuclear Power Facilities," Joint Project between the US Nuclear Regulatory Commission and the Electric Power Research Institute, April 2005.
    • (2005) Fire PRA Methodologies for Nuclear Power Facilities
  • 4
    • 33745841952 scopus 로고    scopus 로고
    • An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis, Revision 1
    • US NRC, 11/2002
    • Reg. Guide 1.174, US NRC, An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis, Revision 1, 11/2002.
    • Reg. Guide 1.174
  • 6
    • 33745835150 scopus 로고    scopus 로고
    • Risk-informed fire-induced circuit failure analysis
    • D. W. Henneke, "Risk-Informed Fire-Induced Circuit Failure Analysis," ANS Winter Meeting, 2004.
    • (2004) ANS Winter Meeting
    • Henneke, D.W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.