-
1
-
-
33745669797
-
Sales and operations planning (SOP): The SC'pilar
-
Marrakech, Morocco, 16-19 May
-
Affonso, R., Marcotte, F. and Orabot, B., Sales and operations planning (SOP): the SC'pilar. Proceedings of the industrial eng. and system management conference, IESM 05, Marrakech, Morocco, 16-19 May 2005, pp. 706-715.
-
(2005)
Proceedings of the Industrial Eng. and System Management Conference, IESM 05
, pp. 706-715
-
-
Affonso, R.1
Marcotte, F.2
Orabot, B.3
-
2
-
-
33745636679
-
Order promising process for extended collaborative selling chain (ECOSELL)
-
Marrakech, Morocco, 16-19 May
-
Alemany, M.M.E., Alarcón, F., Ortiz, A. and Lario, F.-C., Order promising process for extended collaborative selling chain (ECOSELL), Proceedings of the industrial eng. and system management conference, IESM 05, Marrakech, Morocco, 16-19 May 2005, pp. 716-725.
-
(2005)
Proceedings of the Industrial Eng. and System Management Conference, IESM 05
, pp. 716-725
-
-
Alemany, M.M.E.1
Alarcón, F.2
Ortiz, A.3
Lario, F.-C.4
-
3
-
-
33745648620
-
-
APICS: Falls Church, USA
-
APICS, Dictionary, 5th edition, 1984 (APICS: Falls Church, USA).
-
(1984)
Dictionary, 5th Edition
-
-
-
4
-
-
0030110534
-
Computer-integrated manufacturing in the chemical industry
-
Ashayeri, J., Teelen, A. and Selen, W., Computer-integrated manufacturing in the chemical industry. Prod. Inventory Mgmt Jnl, 1996, 37, 52-57.
-
(1996)
Prod. Inventory Mgmt Jnl
, vol.37
, pp. 52-57
-
-
Ashayeri, J.1
Teelen, A.2
Selen, W.3
-
5
-
-
0347360399
-
Planning, scheduling and budgeting value-added chains
-
Badell, M., Romero, J., Huertas, R. and Puigjaner, L., Planning, scheduling and budgeting value-added chains. Comput. Chem. Engng, 2004, 28, 45-61.
-
(2004)
Comput. Chem. Engng
, vol.28
, pp. 45-61
-
-
Badell, M.1
Romero, J.2
Huertas, R.3
Puigjaner, L.4
-
6
-
-
0032209962
-
Manufacturing planning and control: The evolution of MRP and JIT integration
-
Benton, W.C. and Shin, H., Manufacturing planning and control: the evolution of MRP and JIT integration. Europ. J. Opl. Res., 1998, 110, 411-440.
-
(1998)
Europ. J. Opl. Res.
, vol.110
, pp. 411-440
-
-
Benton, W.C.1
Shin, H.2
-
7
-
-
29144458135
-
Enterprise resource planning systems in aluminium conversion industry
-
David, F., Pierreval, H. and Caux, C, Enterprise resource planning systems in aluminium conversion industry. Prod. Planning Control, 2005, 16, 785-795.
-
(2005)
Prod. Planning Control
, vol.16
, pp. 785-795
-
-
David, F.1
Pierreval, H.2
Caux, C.3
-
8
-
-
0012692790
-
The overselling of the supply chain planning suites: 60 manufacturers speak up
-
Fontanella, J., The overselling of the supply chain planning suites: 60 manufacturers speak up. AMR research report, 2001.
-
(2001)
AMR Research Report
-
-
Fontanella, J.1
-
9
-
-
21844501562
-
A typology of production control situations in process industries
-
Fransoo, J.C. and Rutten, W.G.M.M., A typology of production control situations in process industries. Int. J. Ops Prod. Mgmt, 1994, 14, 47-57.
-
(1994)
Int. J. Ops Prod. Mgmt
, vol.14
, pp. 47-57
-
-
Fransoo, J.C.1
Rutten, W.G.M.M.2
-
10
-
-
33745673257
-
Panorama de l'offre en supply chain management
-
Freitas, M., Panorama de l'offre en supply chain management. Logistiques Mag., 2003, 178, 76-79.
-
(2003)
Logistiques Mag.
, vol.178
, pp. 76-79
-
-
Freitas, M.1
-
11
-
-
0141532081
-
Design of an IT-driven decision support system for vehicle routing and scheduling
-
Gayialis, S.P. and Tatsiopoulos, I.P., Design of an IT-driven decision support system for vehicle routing and scheduling. Europ. J. Opl Res., 2004, 152, 382-398.
-
(2004)
Europ. J. Opl Res.
, vol.152
, pp. 382-398
-
-
Gayialis, S.P.1
Tatsiopoulos, I.P.2
-
12
-
-
33745652820
-
Outil d'aide à la decision pour la planification d'un atelier de fabrication de tôles laminées
-
April Toulouse, France
-
Gourgand, M., Grangeon, N., Norre, S. and Tchernev, N., Outil d'aide à la decision pour la planification d'un atelier de fabrication de tôles laminées. Proceedings of MOSIM 2003, Fourth Conférence Francophone de Modélisation et Simulation, April 2003, Toulouse, France.
-
(2003)
Proceedings of MOSIM 2003, Fourth Conférence Francophone de Modélisation et Simulation
-
-
Gourgand, M.1
Grangeon, N.2
Norre, S.3
Tchernev, N.4
-
15
-
-
33745637351
-
-
12 Solution, Dallas, Texas
-
12 Supply Chain Strategist, 2003b (12 Solution, Dallas, Texas).
-
(2003)
12 Supply Chain Strategist
-
-
-
18
-
-
0036642595
-
Advanced planning and scheduling with outsourcing in manufacturing supply chain
-
Lee, Y.H., Jeong, C.S. and Moon, C., Advanced planning and scheduling with outsourcing in manufacturing supply chain. Comput. Ind. Engng, 2002, 43, 351-374.
-
(2002)
Comput. Ind. Engng
, vol.43
, pp. 351-374
-
-
Lee, Y.H.1
Jeong, C.S.2
Moon, C.3
-
19
-
-
33745648217
-
Automatisation de la décision : Jusqu'où peut-on aller?
-
Lovejoy, W.S., Automatisation de la décision : jusqu'où peut-on aller?, Les Echos - l'Art de la stratégie, 2000, 11, 6-7.
-
(2000)
Les Echos - l'Art de la Stratégie
, vol.11
, pp. 6-7
-
-
Lovejoy, W.S.1
-
20
-
-
0025433556
-
Medium to short term finite capacity scheduling: A planning methodology for capacity constrained work-shops
-
Me Carthy, S.W. and Barber, K.D., Medium to short term finite capacity scheduling: A planning methodology for capacity constrained work-shops. Engng Costs Prod. Econ., 2002, 19, 189-199.
-
(2002)
Engng Costs Prod. Econ.
, vol.19
, pp. 189-199
-
-
Me Carthy, S.W.1
Barber, K.D.2
-
21
-
-
0033355582
-
Focusing material requirements planning (MRP) towards performance
-
Plenert, G., Focusing material requirements planning (MRP) towards performance. Europ. J. Opl Res., 1999, 119, 91-99.
-
(1999)
Europ. J. Opl Res.
, vol.119
, pp. 91-99
-
-
Plenert, G.1
-
22
-
-
33745654206
-
MySAP SCM supply chain planning
-
SAP: Walldorf, Germany
-
SAP, mySAP SCM supply chain planning. SAP functions in Detail, 2002a (SAP: Walldorf, Germany).
-
(2002)
SAP Functions in Detail
-
-
-
23
-
-
33745671766
-
Production planning and detailed scheduling with SAP Advanced Planner & Optimizer
-
SAP: Walldorf, Germany
-
SAP, Production planning and detailed scheduling with SAP Advanced Planner & Optimizer. SAP functions in Detail, 2002b (SAP: Walldorf, Germany).
-
(2002)
SAP Functions in Detail
-
-
-
24
-
-
0031220255
-
Diagnostic Scheduling in finite-capacity production environments
-
Tardif, V. and Barman, M.L.S., Diagnostic Scheduling in finite-capacity production environments. Comput. Ind. Engng, 1997, 32, 867-878.
-
(1997)
Comput. Ind. Engng
, vol.32
, pp. 867-878
-
-
Tardif, V.1
Barman, M.L.S.2
-
25
-
-
33745662493
-
Heuristic-based approach for an industrial three dimensional layout problem
-
May Porto, Portugal
-
Tchernev, N., Grangeon, N. and Norre, S., Heuristic-based approach for an industrial three dimensional layout problem. Proceedings of IEPM 2003, 6th International Conference on Industrial Engineering and Production Management, May 2003, Porto, Portugal.
-
(2003)
Proceedings of IEPM 2003, 6th International Conference on Industrial Engineering and Production Management
-
-
Tchernev, N.1
Grangeon, N.2
Norre, S.3
-
26
-
-
33745642808
-
Identification, modeling and optimization of flexibility dimensions in blending industries
-
May Porto, Portugal
-
Thomas, C., Moulin, F. and Penz, B., Identification, modeling and optimization of flexibility dimensions in blending industries. Proceedings of IEPM 2003, 6th International Conference on Industrial Engineering and Production Management, May 2003, Porto, Portugal.
-
(2003)
Proceedings of IEPM 2003, 6th International Conference on Industrial Engineering and Production Management
-
-
Thomas, C.1
Moulin, F.2
Penz, B.3
-
27
-
-
33745672404
-
Advanced planning and scheduling (APS) systems
-
Turbide, D., Advanced planning and scheduling (APS) systems. Midrange ERP Mag., 1998, 1, 1.
-
(1998)
Midrange ERP Mag.
, vol.1
, pp. 1
-
-
Turbide, D.1
-
28
-
-
0036758148
-
A case study on the integration of APS and ERP in a steel processing plant
-
Wiers, V.C.S., A case study on the integration of APS and ERP in a steel processing plant. Prod. Planning Control, 2002, 13, 552-560.
-
(2002)
Prod. Planning Control
, vol.13
, pp. 552-560
-
-
Wiers, V.C.S.1
-
29
-
-
0031233711
-
Schedule based production
-
Yeh, C.-H., Schedule based production. Int. J. Prod. Econ., 1997, 51, 235-242.
-
(1997)
Int. J. Prod. Econ.
, vol.51
, pp. 235-242
-
-
Yeh, C.-H.1
-
30
-
-
33745663382
-
So you think you are Ready for SCP?
-
TG-12-5540
-
Zrimsek, B., Peterson, K. and Brant, K.F., So you think you are Ready for SCP?, Gartner's Manufacturing Applications Strategies Research Note, 2000, TG-12-5540.
-
(2000)
Gartner's Manufacturing Applications Strategies Research Note
-
-
Zrimsek, B.1
Peterson, K.2
Brant, K.F.3
|