메뉴 건너뛰기




Volumn 236, Issue 14-16, 2006, Pages 1547-1557

Westinghouse AP1000 advanced passive plant

Author keywords

[No Author keywords available]

Indexed keywords

COSTS; ELECTRIC POWER PLANTS; NUCLEAR POWER PLANTS; PRESSURIZED WATER REACTORS; REGULATORY COMPLIANCE; RELIABILITY; RISK ASSESSMENT; STRATEGIC PLANNING;

EID: 33745224696     PISSN: 00295493     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.nucengdes.2006.03.049     Document Type: Article
Times cited : (601)

References (8)
  • 1
    • 33745193014 scopus 로고    scopus 로고
    • AP1000 Design Control Document, Revision 14, September 2004 (Revision 0 sent to NRC March 2002).
  • 2
    • 33745207313 scopus 로고    scopus 로고
    • AP1000 Probabilistic Risk Assessment, Revision 8, July 2004 (Revision 0 sent to NRC March 2002).
  • 3
    • 33745192568 scopus 로고    scopus 로고
    • Advanced Light Water Reactor Utility Requirements Document, 1999. Volume III, ALWR Passive Plant, Revision 8, March.
  • 6
    • 84933177519 scopus 로고    scopus 로고
    • Using immersive virtual environments to develop and visualize construction schedules for advanced nuclear power plants
    • May
    • Whisker V.E. Using immersive virtual environments to develop and visualize construction schedules for advanced nuclear power plants. Proceedings of the ICAPP 2003, paper 3271. May (2003)
    • (2003) Proceedings of the ICAPP 2003, paper 3271
    • Whisker, V.E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.