-
1
-
-
0032074551
-
The impact of priority rule combinations on lateness and tardiness
-
S. Barman, The impact of priority rule combinations on lateness and tardiness, IIE, Transactions, Vol.30, 1998, pp. 495-504.
-
(1998)
IIE Transactions
, vol.30
, pp. 495-504
-
-
Barman, S.1
-
2
-
-
0037546939
-
A neural networks approach for due-date assignment in a wafer fabrication factory
-
P.-C. Chang, J.-C. Hsieh, A neural networks approach for due-date assignment in a wafer fabrication factory, International Journal of Industrial Engineering, Vol.10, No.1, 2003, pp. 55-61.
-
(2003)
International Journal of Industrial Engineering
, vol.10
, Issue.1
, pp. 55-61
-
-
Chang, P.-C.1
Hsieh, J.-C.2
-
3
-
-
67749133834
-
A case-based reasoning approach for due date assignment in a wafer fabrication factory
-
Vancouver, British Columbia, Canada
-
P.-C. Chang, J.-C. Hsieh, T. W. Liao, A case-based reasoning approach for due date assignment in a wafer fabrication factory, in: Proceedings of the International Conference on Case-Based Reasoning (ICCBR 2001), Vancouver, British Columbia, Canada, 2001.
-
(2001)
Proceedings of the International Conference on Case-Based Reasoning (ICCBR 2001)
-
-
Chang, P.-C.1
Hsieh, J.-C.2
Liao, T.W.3
-
5
-
-
15844419035
-
A fuzzy back propagation network for output time prediction in a wafer fab
-
T. Chen, A fuzzy back propagation network for output time prediction in a wafer fab, Journal of Applied Soft Computing, Vol.2/3F, 2003, pp. 211-222.
-
(2003)
Journal of Applied Soft Computing
, vol.2-3 F
, pp. 211-222
-
-
Chen, T.1
-
6
-
-
0031246943
-
The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories
-
S.-H. Chung, M.-H. Yang, C.-M. Cheng, The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories, IEEE Transactions On Components, Packaging, and Manufacturing Technology - Part C, Vol.20, No.4, 1997, pp. 278-287.
-
(1997)
IEEE Transactions on Components, Packaging, and Manufacturing Technology - Part C
, vol.20
, Issue.4
, pp. 278-287
-
-
Chung, S.-H.1
Yang, M.-H.2
Cheng, C.-M.3
-
7
-
-
0026851662
-
Neural network forecasting of short, noisy time series
-
W. R. Foster, F. Gollopy, L. H. Ungar, Neural network forecasting of short, noisy time series, Computers in Chemical Engineering, Vol.16, No.4, 1992, pp. 293-297.
-
(1992)
Computers in Chemical Engineering
, vol.16
, Issue.4
, pp. 293-297
-
-
Foster, W.R.1
Gollopy, F.2
Ungar, L.H.3
-
9
-
-
0003560266
-
Shop floor scheduling of semiconductor wafer fabrication using real-time feedback control and prediction
-
Ph.D. Dissertation, Engineering-Industrial Engineering and Operations Research, University of California at Berkeley
-
C.-Y. Lin, Shop floor scheduling of semiconductor wafer fabrication using real-time feedback control and prediction, Ph.D. Dissertation, Engineering-Industrial Engineering and Operations Research, University of California at Berkeley, 1996.
-
(1996)
-
-
Lin, C.-Y.1
-
10
-
-
0032749972
-
Theory and methodology - Financial credit-risk evaluation with neural and neuralfuzzy systems
-
S. Piramuthu, Theory and methodology - financial credit-risk evaluation with neural and neuralfuzzy systems, European Journal of Operational Research, Vol.112, 1991, pp. 310-321.
-
(1991)
European Journal of Operational Research
, vol.112
, pp. 310-321
-
-
Piramuthu, S.1
-
11
-
-
0026186620
-
Dynamic rules for due-date assignment
-
M. M. Vig, K. J. Dooley, Dynamic rules for due-date assignment, International Journal of Production Research, Vol.29, No.7, 1991, pp. 1361-1377.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.7
, pp. 1361-1377
-
-
Vig, M.M.1
Dooley, K.J.2
|