메뉴 건너뛰기




Volumn 5, Issue 5, 2006, Pages 910-915

A look-ahead back propagation network to predict wafer lot output time

Author keywords

Back propagation network; Future release plan; Fuzzy set application; Output time prediction

Indexed keywords

BACKPROPAGATION; FUZZY SETS; SILICON WAFERS; TIME DOMAIN ANALYSIS;

EID: 33744547519     PISSN: 11092750     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (3)

References (11)
  • 1
    • 0032074551 scopus 로고    scopus 로고
    • The impact of priority rule combinations on lateness and tardiness
    • S. Barman, The impact of priority rule combinations on lateness and tardiness, IIE, Transactions, Vol.30, 1998, pp. 495-504.
    • (1998) IIE Transactions , vol.30 , pp. 495-504
    • Barman, S.1
  • 2
    • 0037546939 scopus 로고    scopus 로고
    • A neural networks approach for due-date assignment in a wafer fabrication factory
    • P.-C. Chang, J.-C. Hsieh, A neural networks approach for due-date assignment in a wafer fabrication factory, International Journal of Industrial Engineering, Vol.10, No.1, 2003, pp. 55-61.
    • (2003) International Journal of Industrial Engineering , vol.10 , Issue.1 , pp. 55-61
    • Chang, P.-C.1    Hsieh, J.-C.2
  • 5
    • 15844419035 scopus 로고    scopus 로고
    • A fuzzy back propagation network for output time prediction in a wafer fab
    • T. Chen, A fuzzy back propagation network for output time prediction in a wafer fab, Journal of Applied Soft Computing, Vol.2/3F, 2003, pp. 211-222.
    • (2003) Journal of Applied Soft Computing , vol.2-3 F , pp. 211-222
    • Chen, T.1
  • 6
    • 0031246943 scopus 로고    scopus 로고
    • The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories
    • S.-H. Chung, M.-H. Yang, C.-M. Cheng, The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories, IEEE Transactions On Components, Packaging, and Manufacturing Technology - Part C, Vol.20, No.4, 1997, pp. 278-287.
    • (1997) IEEE Transactions on Components, Packaging, and Manufacturing Technology - Part C , vol.20 , Issue.4 , pp. 278-287
    • Chung, S.-H.1    Yang, M.-H.2    Cheng, C.-M.3
  • 7
  • 9
    • 0003560266 scopus 로고    scopus 로고
    • Shop floor scheduling of semiconductor wafer fabrication using real-time feedback control and prediction
    • Ph.D. Dissertation, Engineering-Industrial Engineering and Operations Research, University of California at Berkeley
    • C.-Y. Lin, Shop floor scheduling of semiconductor wafer fabrication using real-time feedback control and prediction, Ph.D. Dissertation, Engineering-Industrial Engineering and Operations Research, University of California at Berkeley, 1996.
    • (1996)
    • Lin, C.-Y.1
  • 10
    • 0032749972 scopus 로고
    • Theory and methodology - Financial credit-risk evaluation with neural and neuralfuzzy systems
    • S. Piramuthu, Theory and methodology - financial credit-risk evaluation with neural and neuralfuzzy systems, European Journal of Operational Research, Vol.112, 1991, pp. 310-321.
    • (1991) European Journal of Operational Research , vol.112 , pp. 310-321
    • Piramuthu, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.