메뉴 건너뛰기




Volumn 4, Issue 1, 1998, Pages 64-71

A decision-support system for logistic management in a building company

Author keywords

[No Author keywords available]

Indexed keywords


EID: 33744468025     PISSN: 13921525     EISSN: None     Source Type: Journal    
DOI: 10.1080/13921525.1998.10531381     Document Type: Article
Times cited : (1)

References (10)
  • 1
  • 2
    • 85024166292 scopus 로고    scopus 로고
    • Research Project Carried out under the Guidance of A. Sobotka, KBN, No 1 H02D 006 11, Lublin
    • Examining and Optimising Logistic Systems in a Building Company. Research Project Carried out under the Guidance of A. Sobotka, KBN, No 1 H02D 006 11, Lublin, 1996.
    • (1996) Examining and Optimising Logistic Systems in a Building Company
  • 3
    • 16244392539 scopus 로고
    • Information for the Management of the Building-Materials Flow. Engineering
    • E.R. Poortman, H.N.M. Bons. Information for the Management of the Building-Materials Flow. Engineering, Construction and Architectural Management, 1994,1/2, p. 139-140
    • (1994) Construction and Architectural Management , vol.1 , Issue.2 , pp. 139-140
    • Poortman, E.R.1    Bons, H.N.M.2
  • 4
    • 0542389909 scopus 로고
    • Model Input Management a Case Study
    • Ch. Standridge, D.K. Laval. Model Input Management a Case Study. Simulation 199, March 1992, p. 199-208.
    • (1992) Simulation , vol.199 , pp. 199-208
    • Standridge, C.H.1    Laval, D.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.