|
Volumn 53, Issue 4-5, 2006, Pages 253-262
|
Improving the start-up of an EBPR system using OUR to control the aerobic phase length: A simulation study
|
Author keywords
Activated sludge models; Control; Enhanced biological phosphorus removal; Oxygen uptake rate; Polyphosphate accumulating organisms; Sequencing batch reactor
|
Indexed keywords
ACTIVATED SLUDGE PROCESS;
CHEMICAL REACTORS;
COMPUTER SIMULATION;
PHOSPHORUS;
REMOVAL;
ENHANCED BIOLOGICAL PHOSPHORUS REMOVAL;
OXYGEN UPTAKE RATE;
POLYPHOSPHATE ACCUMULATING ORGANISMS;
SEQUENCING BATCH REACTOR;
PLANT STARTUP;
PHOSPHORUS;
POLYPHOSPHATE;
ACTIVATED SLUDGE PROCESS;
CHEMICAL REACTORS;
COMPUTER SIMULATION;
PHOSPHORUS;
PLANT STARTUP;
REMOVAL;
CONTROL SYSTEM;
OXIC CONDITIONS;
SIMULATION;
SLUDGE;
WASTE FACILITY;
WASTE TREATMENT;
WASTEWATER;
ACTIVATED SLUDGE;
ARTICLE;
BATCH REACTOR;
BIOMASS;
COMPUTER SIMULATION;
CONTROL SYSTEM;
CONTROLLED STUDY;
SLUDGE TREATMENT;
WASTE WATER MANAGEMENT;
WASTE WATER TREATMENT PLANT;
AEROBIOSIS;
ANAEROBIOSIS;
BIOREACTORS;
COMPUTER SIMULATION;
GLYCOGEN;
MODELS, BIOLOGICAL;
OXYGEN;
PHOSPHORUS;
WASTE DISPOSAL, FLUID;
|
EID: 33646753777
PISSN: 02731223
EISSN: None
Source Type: Book Series
DOI: 10.2166/wst.2006.130 Document Type: Article |
Times cited : (8)
|
References (8)
|