-
1
-
-
0025519319
-
"A regression-based approach to short-term system load forecasting"
-
Nov
-
A. D. Papalexopoulos and T. C. Hesterberg, "A regression-based approach to short-term system load forecasting," IEEE Trans. Power Syst., vol. 4, no. 4, pp. 1535-1547, Nov. 1990.
-
(1990)
IEEE Trans. Power Syst.
, vol.4
, Issue.4
, pp. 1535-1547
-
-
Papalexopoulos, A.D.1
Hesterberg, T.C.2
-
2
-
-
0035273372
-
"Real-time very short-term load prediction for power-system automatic generation control"
-
Mar
-
D. J. Trudnowski et al., "Real-time very short-term load prediction for power-system automatic generation control," IEEE Trans. Control Syst. Technol., vol. 9, no. 2, pp. 254-260, Mar. 2001.
-
(2001)
IEEE Trans. Control Syst. Technol.
, vol.9
, Issue.2
, pp. 254-260
-
-
Trudnowski, D.J.1
-
3
-
-
0024001840
-
"An expert system based algorithm for short-term load forecast"
-
May
-
S. Rahman and R. Bhatnagar, "An expert system based algorithm for short-term load forecast," IEEE Trans. Power Syst., vol. 3, no. 2, pp. 392-399, May 1988.
-
(1988)
IEEE Trans. Power Syst.
, vol.3
, Issue.2
, pp. 392-399
-
-
Rahman, S.1
Bhatnagar, R.2
-
4
-
-
0030143484
-
"A neural network short-term load forecasting model for the Greek power system"
-
May
-
A. G. Bakirtzis et al., "A neural network short-term load forecasting model for the Greek power system," IEEE Trans. Power Syst., vol. 11, no. 2, pp. 858-863, May 1996.
-
(1996)
IEEE Trans. Power Syst.
, vol.11
, Issue.2
, pp. 858-863
-
-
Bakirtzis, A.G.1
-
5
-
-
0030289955
-
"A neural network based technique for short-term forecasting of anomalous load periods"
-
Nov
-
R. Lamedica et al., "A neural network based technique for short-term forecasting of anomalous load periods," IEEE Trans. Power Syst., vol. 11, no. 4, pp. 1749-1756, Nov. 1996.
-
(1996)
IEEE Trans. Power Syst.
, vol.11
, Issue.4
, pp. 1749-1756
-
-
Lamedica, R.1
-
6
-
-
0034186817
-
"Short-term load forecasting for special days in anomalous load conditions using neural networks and fuzzy inference method"
-
May
-
K. H. Kim, H. S. Youn, and Y. C. Kang, "Short-term load forecasting for special days in anomalous load conditions using neural networks and fuzzy inference method," IEEE Trans. Power Syst., vol. 15, no. 2, pp. 559-565, May 2000.
-
(2000)
IEEE Trans. Power Syst.
, vol.15
, Issue.2
, pp. 559-565
-
-
Kim, K.H.1
Youn, H.S.2
Kang, Y.C.3
-
7
-
-
0035425750
-
"Deterministic annealing clustering for ANN-based short-term load forecasting"
-
Aug
-
H. Mori and A. Yuihara, "Deterministic annealing clustering for ANN-based short-term load forecasting," IEEE Trans. Power Syst., vol. 16, no. 3, pp. 545-551, Aug. 2001.
-
(2001)
IEEE Trans. Power Syst.
, vol.16
, Issue.3
, pp. 545-551
-
-
Mori, H.1
Yuihara, A.2
-
8
-
-
0036474210
-
"One-hour-ahead load forecasting using neural network"
-
Feb
-
T. Senjyu, H. Takara, and T. Funabashi, "One-hour-ahead load forecasting using neural network," IEEE Trans. Power Syst., vol. 17, no. 1, pp. 113-118, Feb. 2002.
-
(2002)
IEEE Trans. Power Syst.
, vol.17
, Issue.1
, pp. 113-118
-
-
Senjyu, T.1
Takara, H.2
Funabashi, T.3
-
9
-
-
13844311476
-
"Short-term load forecasting for the holidays using fuzzy linear regression method"
-
Feb
-
K. B. Song, Y. S. Baek, D. H. Hong, and G. S. Jang, "Short-term load forecasting for the holidays using fuzzy linear regression method," IEEE Trans. Power Syst., vol. 20, no. 1, pp. 96-101, Feb. 2005.
-
(2005)
IEEE Trans. Power Syst.
, vol.20
, Issue.1
, pp. 96-101
-
-
Song, K.B.1
Baek, Y.S.2
Hong, D.H.3
Jang, G.S.4
-
10
-
-
0032593011
-
"The fuzzy regression approach to peak load estimation in power distribution systems"
-
Aug
-
J. Nazarko and W. Zalewski, "The fuzzy regression approach to peak load estimation in power distribution systems," IEEE Trans. Power Syst., vol. 14, no. 3, pp. 809-814, Aug. 1999.
-
(1999)
IEEE Trans. Power Syst.
, vol.14
, Issue.3
, pp. 809-814
-
-
Nazarko, J.1
Zalewski, W.2
-
11
-
-
33646348795
-
"Application of neural networks to short-term load forecasting using electrical load pattern"
-
H. S. Park, K. J. Mun, H. S. Kim, G. H. Hwang, H. S. Lee, and J. H. Park, "Application of neural networks to short-term load forecasting using electrical load pattern," KIEE Trans., vol. 48A, no. 1, pp. 8-13, 1999.
-
(1999)
KIEE Trans.
, vol.48 A
, Issue.1
, pp. 8-13
-
-
Park, H.S.1
Mun, K.J.2
Kim, G.H.3
Hwang, H.S.4
Lee, H.S.5
Park, J.H.6
-
12
-
-
13844316256
-
"Development of the Integrated System for Power System Operational Planning and Analysis"
-
KEPRI, Tech. Rep. TR.94YJ 15.JI998.89, Dec
-
Y. Yoon et al., "Development of the Integrated System for Power System Operational Planning and Analysis," KEPRI, Tech. Rep. TR.94YJ 15.JI998.89, Dec. 1998.
-
(1998)
-
-
Yoon, Y.1
-
13
-
-
0008321310
-
"Possibilistic linear system and their application to linear regression model"
-
H. Tanaka and J. Watada, "Possibilistic linear system and their application to linear regression model," Fuzzy Sets Syst., vol. 27, pp. 275-289, 1988.
-
(1988)
Fuzzy Sets Syst.
, vol.27
, pp. 275-289
-
-
Tanaka, H.1
Watada, J.2
-
14
-
-
0035899786
-
"Fuzzy linear regression analysis for fuzzy input-output data using shape preserving operations"
-
Sep
-
D. H. Hong et al., "Fuzzy linear regression analysis for fuzzy input-output data using shape preserving operations," Fuzzy Sets Syst., vol. 122, pp.513-526, Sep. 2001.
-
(2001)
Fuzzy Sets Syst.
, vol.122
, pp. 513-526
-
-
Hong, D.H.1
|