메뉴 건너뛰기




Volumn 2, Issue 2-3, 2006, Pages 171-186

Asset maintenance management: State of the art in the European railways

Author keywords

Asset management; Infrastructure; Life cycle costing; Railways

Indexed keywords

COMPUTER AIDED DESIGN; COST EFFECTIVENESS; MANAGERS; RELIABILITY; STRATEGIC PLANNING;

EID: 33646258271     PISSN: 14753219     EISSN: None     Source Type: Journal    
DOI: 10.1504/IJCIS.2006.009436     Document Type: Article
Times cited : (16)

References (46)
  • 2
    • 84858884305 scopus 로고    scopus 로고
    • Outsourcing rail infrastructure maintenance and renewal, in: Innovations for a cost effective railway track
    • PROMAIN - Innovations for a Cost Effective Railway Track, Fraunhofer Institut, Karlsruhe
    • Allen, L. and Ogilvie, N. (2003) 'Outsourcing rail infrastructure maintenance and renewal, in: innovations for a cost effective railway track', 5th Framework EU Research Project, PROMAIN - Innovations for a Cost Effective Railway Track, Fraunhofer Institut, Karlsruhe, No. 3, pp.28-31, www.promain.org.
    • (2003) 5th Framework EU Research Project , Issue.3 , pp. 28-31
    • Allen, L.1    Ogilvie, N.2
  • 3
    • 15744374019 scopus 로고    scopus 로고
    • Extending asset life through the use of slab track
    • International Quality and Productivity Centre Ltd., London, UK
    • Bauman, G. (2003) 'Extending asset life through the use of slab track', Proc. Asset Management for Railway Infrastructure 2003, International Quality and Productivity Centre Ltd., London, UK.
    • (2003) Proc. Asset Management for Railway Infrastructure 2003
    • Bauman, G.1
  • 5
    • 85048625985 scopus 로고    scopus 로고
    • European standard on railway applications: The specification and demonstration of reliability, availability, maintainability and safety
    • Brussels
    • CENELEC (1999) 'European standard on railway applications: the specification and demonstration of reliability, availability, maintainability and safety', CENELEC, Brussels.
    • (1999) CENELEC
  • 6
    • 15744387815 scopus 로고    scopus 로고
    • LCC Rail Track - A model to predict LCC of rail track and components
    • TU Delft, Road and Railway Engineering Department, Delft, NL
    • Danzer, P. (2004) 'LCC Rail Track - a model to predict LCC of rail track and components', Proc. Switch to Delft International Conference 2004, TU Delft, Road and Railway Engineering Department, Delft, NL, www.rail.tudelft.nl.
    • (2004) Proc. Switch to Delft International Conference 2004
    • Danzer, P.1
  • 7
    • 26344476006 scopus 로고
    • European Council Directive 91/440, 29th July, European, Union
    • EU (1991) European Council Directive 91/440, 29th July, European, Union, Official Journal L 237, pp.25-28.
    • (1991) Official Journal L , vol.237 , pp. 25-28
  • 8
    • 33646251973 scopus 로고    scopus 로고
    • Council Directive 91/440/EEC of 29 July 1991 on the development of the Community's railways
    • Council Directive 91/440/EEC of 29 July 1991 on the development of the Community's railways
  • 9
    • 0031147586 scopus 로고    scopus 로고
    • Rail track infrastructure ownership: Investment and operational issues
    • Kluwer Academic Publishers
    • Ferreira, L. (1997) 'Rail track infrastructure ownership: investment and operational issues', Transportation, Vol. 24, Kluwer Academic Publishers, pp.183-200.
    • (1997) Transportation , vol.24 , pp. 183-200
    • Ferreira, L.1
  • 10
    • 15744367754 scopus 로고    scopus 로고
    • Switches, less is more? A cost-benefit analysis to determine the usefulness of disruption switches
    • TU Delft, Road and Railway Engineering Department, Delft, NL
    • Gallmann, S.B.M., Weits, E.A.G., Zoeteman, A. and Hurink, J.L. (2004) 'Switches, less is more? a cost-benefit analysis to determine the usefulness of disruption switches', Proc. Switch to Delft International Conference 2004, TU Delft, Road and Railway Engineering Department, Delft, NL, www.rail.tudelft.nl.
    • (2004) Proc. Switch to Delft International Conference 2004
    • Gallmann, S.B.M.1    Weits, E.A.G.2    Zoeteman, A.3    Hurink, J.L.4
  • 12
    • 0002539999 scopus 로고
    • A statewide pavement management system
    • Golabi, K., Kulkarni, R. and Way, G. (1982) 'A statewide pavement management system', Interfaces, Vol. 12, No. 6, pp.5-21.
    • (1982) Interfaces , vol.12 , Issue.6 , pp. 5-21
    • Golabi, K.1    Kulkarni, R.2    Way, G.3
  • 13
    • 33646255171 scopus 로고    scopus 로고
    • High-Speed Line South Project Organisation, Ministry of Transport, Public Works and Water Management, The Hague, NL
    • HSL South Project Organisation (1999) Infra Provider: Invitation to Tenderers (plus addenda), High-Speed Line South Project Organisation, Ministry of Transport, Public Works and Water Management, The Hague, NL.
    • (1999) Infra Provider: Invitation to Tenderers (Plus Addenda)
  • 16
    • 33646238199 scopus 로고    scopus 로고
    • Beheerconcessie hoofdspoorweginfrastructuur
    • V&W, Ministry of Transport, Public Works and Water Management, The Hague, NL
    • Ministry of Transport (V&W) (2005a) 'Beheerconcessie hoofdspoorweginfrastructuur', Concession for the Management of the Trunk Railway Network, V&W, Ministry of Transport, Public Works and Water Management, The Hague, NL.
    • (2005) Concession for the Management of the Trunk Railway Network
  • 17
    • 33646258676 scopus 로고    scopus 로고
    • Road and Hydraulic Engineering Institute, Directorate General of Public Works and Water Management, Ministry of Transport, Public Works and Water Management, The Hague, NL
    • Ministry of Transport (2005b) DWW-Wijzers 2/26/48, Road and Hydraulic Engineering Institute, Directorate General of Public Works and Water Management, Ministry of Transport, Public Works and Water Management, The Hague, NL.
    • (2005) DWW-Wijzers 2/26/48
  • 20
    • 33646250609 scopus 로고    scopus 로고
    • Renewing Finland's rail network to meet traffic needs of the future
    • Russell Publishing
    • Niemimuukko, O. (2003) 'Renewing Finland's rail network to meet traffic needs of the future', European Railway Review, Russell Publishing, Vol. 1, No. 2, pp. 17-24.
    • (2003) European Railway Review , vol.1 , Issue.2 , pp. 17-24
    • Niemimuukko, O.1
  • 23
    • 33646256761 scopus 로고    scopus 로고
    • ProRail, Dutch National Railway Administration, Utrecht, NL
    • ProRail (J. Swier) (2003) Benchmark Track Renewal Practices ProRail, ProRail, Dutch National Railway Administration, Utrecht, NL.
    • (2003) Benchmark Track Renewal Practices ProRail
  • 24
    • 33646246115 scopus 로고    scopus 로고
    • Dutch National Railway Administration, Utrecht, NL
    • ProRail Inframanagement (2004) Maintenance Management Manual for Railway Stations, Dutch National Railway Administration, Utrecht, NL.
    • (2004) Maintenance Management Manual for Railway Stations
  • 25
    • 15744372495 scopus 로고    scopus 로고
    • Strategic M&R policy of a railway corridor, taking into account the value of capacity
    • UK
    • Putallaz, Y. (2003) 'Strategic M&R policy of a railway corridor, taking into account the value of capacity', Proc. World Congress on Railway Research, UK.
    • (2003) Proc. World Congress on Railway Research
    • Putallaz, Y.1
  • 26
    • 15744397005 scopus 로고
    • Trends in track maintenance and renewal planning systems
    • Roney, M. and Esveld, C. (1993) 'Trends in track maintenance and renewal planning systems', Rail Engineering International, No. 1.
    • (1993) Rail Engineering International , Issue.1
    • Roney, M.1    Esveld, C.2
  • 27
    • 15744388687 scopus 로고    scopus 로고
    • An integrated approach to railway asset management optimization
    • Edinburgh, UK
    • Saccardi, D. (2003) 'An integrated approach to railway asset management optimization', Proc. World Congress on Railway Research, Edinburgh, UK.
    • (2003) Proc. World Congress on Railway Research
    • Saccardi, D.1
  • 28
    • 0037340023 scopus 로고    scopus 로고
    • Risk-based life-cycle costing of infrastructure rehabilitation and construction alternatives
    • March
    • Salem, O., AbouRizk, S. and Ariatnam, S. (2003) 'Risk-based life-cycle costing of infrastructure rehabilitation and construction alternatives', J. Infrastructure Systems, March, pp.6-15.
    • (2003) J. Infrastructure Systems , pp. 6-15
    • Salem, O.1    AbouRizk, S.2    Ariatnam, S.3
  • 31
    • 33646237755 scopus 로고    scopus 로고
    • New dutch assessment of rail welding geometry
    • Russell Publishing
    • Steenbergen, M., Esveld, C. and Dollevoet, R. (2005) 'New dutch assessment of rail welding geometry', European Railway Review, Russell Publishing, Vol. 3, No. 1, pp.71-79.
    • (2005) European Railway Review , vol.3 , Issue.1 , pp. 71-79
    • Steenbergen, M.1    Esveld, C.2    Dollevoet, R.3
  • 32
    • 15744401381 scopus 로고    scopus 로고
    • Infrastructure asset management: Better decision making by using Value of Time
    • UIC (International Union of Railways), Paris, Edinburgh, UK
    • Steinegger, R. (2003) 'Infrastructure asset management: better decision making by using Value of Time', World Congress on Railway Research, UIC (International Union of Railways), Paris, Edinburgh, UK.
    • (2003) World Congress on Railway Research
    • Steinegger, R.1
  • 33
    • 33646228338 scopus 로고    scopus 로고
    • Railway Gazette International, Quadrant House, Sutton, Surrey, UK
    • Swier, J. (2004) Exposing the Infrastructure Cost Drivers, Railway Gazette International, Quadrant House, Sutton, Surrey, UK.
    • (2004) Exposing the Infrastructure Cost Drivers
    • Swier, J.1
  • 35
    • 84858868286 scopus 로고    scopus 로고
    • National Academy of Sciences, Washington DC
    • TRB (Asset Management Task Force) (2004) Asset Management: Making it Reality, National Academy of Sciences, Washington DC, www.trb.org.
    • (2004) Asset Management: Making It Reality
  • 36
    • 33646271558 scopus 로고    scopus 로고
    • UIC, Paris
    • UIC Infrastructure Commission and BSL Management Consultants (2002) The Costs of Railway Infrastructure, UIC, Paris.
    • (2002) The Costs of Railway Infrastructure
  • 37
    • 15744368563 scopus 로고    scopus 로고
    • TRIS: Decision support system for track maintenance and renewal
    • Utrecht, NL
    • van den Beemt, F. (2001) 'TRIS: Decision support system for track maintenance and renewal', Volker Stevin Rail and Traffic, Utrecht, NL.
    • (2001) Volker Stevin Rail and Traffic
    • Van Den Beemt, F.1
  • 38
    • 15744362490 scopus 로고    scopus 로고
    • A risk based approach to determine type of ultrasonic inspection and frequencies in railway applications
    • Edinburgh, UK
    • Vatn, J. (2003) 'A risk based approach to determine type of ultrasonic inspection and frequencies in railway applications', Proc. World Congress on Railway Research, Edinburgh, UK.
    • (2003) Proc. World Congress on Railway Research
    • Vatn, J.1
  • 39
    • 15744390310 scopus 로고    scopus 로고
    • Eisenbahnfahrwegstrategien auf basis von lebenszykluskosten
    • September
    • Veit, P. (2000) 'Eisenbahnfahrwegstrategien auf Basis von Lebenszykluskosten', Internationales Verkehrswesen, September.
    • (2000) Internationales Verkehrswesen
    • Veit, P.1
  • 43
    • 79954554630 scopus 로고    scopus 로고
    • Analyzing the performance of railway infrastructure for design and maintenance decisions: A life cycle costing approach
    • Delft University Press
    • Zoeteman, A. (2001) 'Analyzing the performance of railway infrastructure for design and maintenance decisions: a life cycle costing approach', European Journal on Transport and Infrastructure Research, Delft University Press, Vol. 1, No. 4, pp.391-413.
    • (2001) European Journal on Transport and Infrastructure Research , vol.1 , Issue.4 , pp. 391-413
    • Zoeteman, A.1
  • 45
    • 33646259652 scopus 로고    scopus 로고
    • Life cycle cost based management of railway infrastructures: Opportunities and drawbacks
    • Elsevier
    • Zoeteman, A. (2004b) 'Life cycle cost based management of railway infrastructures: opportunities and drawbacks', Selected Proc. World Conf. on Transport Research, Elsevier.
    • (2004) Selected Proc. World Conf. on Transport Research
    • Zoeteman, A.1
  • 46
    • 73549108378 scopus 로고    scopus 로고
    • An approach to improving the performance of rail systems in a design phase
    • Cologne
    • Zoeteman, A. and Braaksma, E. (2001) 'An approach to improving the performance of rail systems in a design phase', World Conference on Railway Research, Cologne.
    • (2001) World Conference on Railway Research
    • Zoeteman, A.1    Braaksma, E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.