-
1
-
-
0001849846
-
Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis
-
Slowinski, R. and Weglarz, J., ed. Elsevier
-
Alvarez-Valdez, A., and Tamarit, J. 1989. Heuristic Algorithms for Resource-Constrained Project Scheduling: a Review and an Empirical Analysis. In Slowinski, R. and Weglarz, J., ed., Intelligent Scheduling Systems. Elsevier. 113-134.
-
(1989)
Intelligent Scheduling Systems
, pp. 113-134
-
-
Alvarez-Valdez, A.1
Tamarit, J.2
-
3
-
-
0013157009
-
Counting linear extensions
-
Brightwell, G., and Winkler, P. 1991. Counting Linear Extensions. Order 8:225-242.
-
(1991)
Order
, vol.8
, pp. 225-242
-
-
Brightwell, G.1
Winkler, P.2
-
4
-
-
0008517462
-
Resource-constrained project scheduling: Notation, classification, models, and methods
-
Brucker, P.; Drexl, A.; Mohring, R.; Neumann, K.; and Pesch, E. 1998. Resource-Constrained Project Scheduling: Notation, Classification, Models, and Methods. European Journal of Operations Research.
-
(1998)
European Journal of Operations Research
-
-
Brucker, P.1
Drexl, A.2
Mohring, R.3
Neumann, K.4
Pesch, E.5
-
5
-
-
26944482061
-
Planning with concurrency, time and resources. A CSP-based approach
-
Vlahavas, I., and Vrakas, D., eds. Idea Group Publishing (to appear)
-
Cesta, A.; Fratini, S.; and Oddi, A. 2004. Planning with Concurrency, Time and Resources. A CSP-Based Approach. In Vlahavas, I., and Vrakas, D., eds., Intelligent Techniques for Planning. Idea Group Publishing (to appear).
-
(2004)
Intelligent Techniques for Planning
-
-
Cesta, A.1
Fratini, S.2
Oddi, A.3
-
6
-
-
33750797855
-
Biasing the structure of scheduling problems through classical planners
-
Cesta, A.; Pecora, F.; and Rasconi, R. 2004. Biasing the Structure of Scheduling Problems Through Classical Planners. In Proceedings of the Workshop on Integrating Planning into Scheduling (WIPIS) at ICAPS, Whistler, Canada.
-
(2004)
Proceedings of the Workshop on Integrating Planning into Scheduling (WIPIS) at ICAPS, Whistler, Canada
-
-
Cesta, A.1
Pecora, F.2
Rasconi, R.3
-
7
-
-
0016972372
-
Heuristics for scheduling resource-constrained scheduling projects: An experimental investigation
-
Cooper, D. 1976. Heuristics for Scheduling Resource-Constrained Scheduling Projects: an Experimental Investigation. Management Science 22:1186-1194.
-
(1976)
Management Science
, vol.22
, pp. 1186-1194
-
-
Cooper, D.1
-
8
-
-
0026255231
-
O-plan: The open planning architecture
-
Currie, K., and Tate, A. 1991. O-Plan: The Open Planning Architecture. Artificial Intelligence 52(1):49-86.
-
(1991)
Artificial Intelligence
, vol.52
, Issue.1
, pp. 49-86
-
-
Currie, K.1
Tate, A.2
-
9
-
-
0030573494
-
On the use of the complexity index as a measure of complexity in activity networks
-
De Reyck, B., and Herroelen, W. 1996. On the use of the complexity index as a measure of complexity in activity networks. European Journal of Operational Research 91:347-366.
-
(1996)
European Journal of Operational Research
, vol.91
, pp. 347-366
-
-
De Reyck, B.1
Herroelen, W.2
-
10
-
-
25144522234
-
PDDL2.2: The language for the classical part of the 4th international plan-ning competition
-
Technical Report 195 Computer Science Department, University of Freiburg
-
Edelkamp, S., and Hoffmann, J. 2004. PDDL2.2: The Language for the Classical Part of the 4th International Plan-ning Competition. Technical report, Technical Report 195 Computer Science Department, University of Freiburg.
-
(2004)
Technical Report
-
-
Edelkamp, S.1
Hoffmann, J.2
-
11
-
-
27444434099
-
PDDL2.1: An extension to PDDL for expressing temporal planning domains
-
Fox, M., and Long, D. 2003. PDDL2.1: An Extension to PDDL for Expressing Temporal Planning Domains. Journal of Artificial Intelligence Research 20:61-124.
-
(2003)
Journal of Artificial Intelligence Research
, vol.20
, pp. 61-124
-
-
Fox, M.1
Long, D.2
-
14
-
-
0003780657
-
-
AIPS 98 Planning Competition Committee
-
Ghallab, M.; Howe, A.; Knoblock, C.; McDermott, D.; Ram, A.; Veloso, M.; Weld, D.; and Wilkins, D. 1998. PDDL - The Planning Domain Definition Language, AIPS 98 Planning Competition Committee.
-
(1998)
PDDL - The Planning Domain Definition Language
-
-
Ghallab, M.1
Howe, A.2
Knoblock, C.3
McDermott, D.4
Ram, A.5
Veloso, M.6
Weld, D.7
Wilkins, D.8
-
15
-
-
0036377352
-
The FF planning system: Fast plan generation through heuristic search
-
Hoffmann, J., and Nebel, B. 2001. The FF Planning System: Fast Plan Generation Through Heuristic Search. Journal of Artificial Intelligence Research 14:253-302.
-
(2001)
Journal of Artificial Intelligence Research
, vol.14
, pp. 253-302
-
-
Hoffmann, J.1
Nebel, B.2
-
16
-
-
84942944881
-
Planning in interplanetary space: Theory and practice
-
Jonsson, A.; Morris, P.; Muscettola, N.; Rajan, K.; and Smith, B. 2000. Planning in Interplanetary Space: Theory and Practice. In Proceedings of the Fifth Int. Conf. on Artificial Intelligence Planning and Scheduling (AIPS-00).
-
(2000)
Proceedings of the Fifth Int. Conf. on Artificial Intelligence Planning and Scheduling (AIPS-00)
-
-
Jonsson, A.1
Morris, P.2
Muscettola, N.3
Rajan, K.4
Smith, B.5
-
17
-
-
0000698758
-
Characterization and generation of a general class of resourceconstrained project scheduling problems
-
Kolisch, R.; Sprecher, A.; and Drexl, A. 1995. Characterization and generation of a general class of resourceconstrained project scheduling problems. Management Science 41(10):1693-1703.
-
(1995)
Management Science
, vol.41
, Issue.10
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
18
-
-
0001636411
-
An experimental and comparative evaluation of production line balancing tehniques
-
Mastor, A. 1970. An Experimental and Comparative Evaluation of Production Line Balancing Tehniques. Management Science 16:728-746.
-
(1970)
Management Science
, vol.16
, pp. 728-746
-
-
Mastor, A.1
-
19
-
-
0034852165
-
Chaff: Engineering an efficient SAT solver
-
Moskewicz, M.; Madigan, C.; Zhao, Y.; Zhang, L.; and Malik, S. 2001. Chaff: Engineering an Efficient SAT Solver. In Proceedings of the 38th Design Automation Conference (DAC'01).
-
(2001)
Proceedings of the 38th Design Automation Conference (DAC'01)
-
-
Moskewicz, M.1
Madigan, C.2
Zhao, Y.3
Zhang, L.4
Malik, S.5
-
20
-
-
84858883359
-
-
Moskewicz, M. 2004. mChaff Website at Princeton: http://www.princeton.edu/~chaff/mchaff. html.
-
(2004)
-
-
Moskewicz, M.1
-
21
-
-
84944982433
-
Coordinating space telescope operations in an integrated planning and scheduling architecture
-
Muscettola, N.; Smith, S.; Cesta, A.; and D'Aloisi, D. 1992. Coordinating Space Telescope Operations in an Integrated Planning and Scheduling Architecture. In IEEE Control Systems, Vol.12, N.1, 28-37.
-
(1992)
IEEE Control Systems
, vol.12
, Issue.1
, pp. 28-37
-
-
Muscettola, N.1
Smith, S.2
Cesta, A.3
D'Aloisi, D.4
-
23
-
-
85017366945
-
Assessing the bias of classical planning strategies on makespan-optimizing scheduling
-
Pecora, F.; Rasconi, R.; and Cesta, A. 2004. Assessing the Bias of Classical Planning Strategies on Makespan-Optimizing Scheduling. In Proceedings of the 16th European Conference on Artificial Intelligence (ECAI-04), August 22nd - 27th, Valencia, Spain.
-
(2004)
Proceedings of the 16th European Conference on Artificial Intelligence (ECAI-04), August 22nd - 27th, Valencia, Spain
-
-
Pecora, F.1
Rasconi, R.2
Cesta, A.3
-
24
-
-
33646049610
-
Integrating hybrid reasoners for planning & scheduling
-
R-Moreno, M.; Oddi, A.; Borrajo, D.; Cesta, A.; and Meziat, D. 2002. Integrating Hybrid Reasoners for Planning & Scheduling. In Proceedings of UK PLANSIG02 Workshop, Delft, The Netherlands.
-
(2002)
Proceedings of UK PLANSIG02 Workshop, Delft, the Netherlands
-
-
R-Moreno, M.1
Oddi, A.2
Borrajo, D.3
Cesta, A.4
Meziat, D.5
-
25
-
-
0011006529
-
Generation of resource-constrained project scheduling problems subject to temporal consraints
-
Universität Karlsruhe. Report WIOR-543
-
Schwindt, C. 1998. Generation of Resource-Constrained Project Scheduling Problems Subject to Temporal Consraints. Technical report, Universität Karlsruhe. Report WIOR-543.
-
(1998)
Technical Report
-
-
Schwindt, C.1
-
27
-
-
1642506021
-
RealPlan: Decoupling causal and resource reasoning in planning
-
Srivastava, B. 2000. RealPlan: Decoupling Causal and Resource Reasoning in Planning. In AAAI/IAAI, 812-818.
-
(2000)
AAAI/IAAI
, pp. 812-818
-
-
Srivastava, B.1
|