메뉴 건너뛰기




Volumn 2002, Issue , 2002, Pages 103-112

Design for construction mitigation on the central artery/tunnel project

Author keywords

[No Author keywords available]

Indexed keywords

ACOUSTIC NOISE; AIR QUALITY; DUST; PROJECT MANAGEMENT; STRUCTURAL DESIGN; TUNNELING (EXCAVATION); URBAN PLANNING;

EID: 33645715674     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (2)

References (23)
  • 1
    • 33645710438 scopus 로고    scopus 로고
    • Central Artery (1-93)/Tunnel (1-90) Project
    • Massachusetts Turnpike Authority, Central Artery (1-93)/Tunnel (1-90) Project, Design Policy Memorandum #1, Revision 6, 1997.
    • (1997) Design Policy Memorandum #1, Revision 6 , vol.1
  • 2
    • 0024303125 scopus 로고
    • Building response to excavation-induced settlement
    • January
    • Boscardin, M. D. and Cording, E. J., "Building Response to Excavation-Induced Settlement", Journal of Geotechnical Engineering, Volume 115, Number 1, January 1989.
    • (1989) Journal of Geotechnical Engineering , vol.115 , Issue.1
    • Boscardin, M.D.1    Cording, E.J.2
  • 3
    • 0034261792 scopus 로고    scopus 로고
    • Construction noise control program and mitigation strategy at the central artery/tunnel project
    • Sep-Oct
    • Thalheimer, E., Construction Noise Control Program and Mitigation Strategy at the Central Artery/Tunnel Project, Noise Control Engineering Journal, Vol. 48, No. 5, pp. 157-165, Sep-Oct 2000.
    • (2000) Noise Control Engineering Journal , vol.48 , Issue.5 , pp. 157-165
    • Thalheimer, E.1
  • 4
    • 33645711746 scopus 로고    scopus 로고
    • The importance of community involvement in a successful construction noise control program
    • paper 2aNS2 presented, Atlanta GA, May
    • Thalheimer, E., The Importance of Community Involvement in a Successful Construction Noise Control Program, paper 2aNS2 presented at the Acoustical Society of America Meeting, Atlanta, GA, May 2000.
    • (2000) Acoustical Society of America Meeting
    • Thalheimer, E.1
  • 5
    • 0343890262 scopus 로고
    • Central Artery (l-93)/Tunnel (I-90) Project, Chapters 5 and 20, Boston, Massachusetts, November
    • Massachusetts Department of Public Works, Central Artery (l-93)/Tunnel (I-90) Project, Final Supplemental Environmental Impact Report, Chapters 5 and 20, Boston, Massachusetts, November 1990.
    • (1990) Final Supplemental Environmental Impact Report
  • 6
    • 0010976240 scopus 로고    scopus 로고
    • Central Artery (I-93)/Tunnel (I-90) Project, Boston, Massachusetts, Revised 11/20/01
    • Massachusetts Turnpike Authority, Central Artery (I-93)/Tunnel (I-90) Project, Construction Noise Control Specification 721.560, Boston, Massachusetts, Revised 11/20/01.
    • Construction Noise Control Specification 721.560
  • 7
    • 0343890260 scopus 로고    scopus 로고
    • Window sound proofing for construction noise at the central artery/ tunnel project
    • paper no. 97, Ft. Lauderdale, FL, December
    • Fistel, M.; Thalheimer, E., Window Sound Proofing for Construction Noise at the Central Artery/Tunnel Project, paper no. 97, presented at Inter-Noise99, Ft. Lauderdale, FL, December 1999.
    • (1999) Inter-noise99
    • Fistel, M.1    Thalheimer, E.2
  • 8
    • 0011057291 scopus 로고    scopus 로고
    • Central Artery (I-93)/Tunnel (I-90) Project, Effective 11/5/97, Updated 4/20/01
    • Massachusetts Highway Department, Central Artery (I-93)/Tunnel (I-90) Project, CA/T Construction Noise Off-Site Residential Mitigation Policy, Effective 11/5/97, Updated 4/20/01.
    • CA/T Construction Noise Off-site Residential Mitigation Policy
  • 10
    • 0343890262 scopus 로고
    • Works, Central Artery (I-93)/Tunnel (I-90) Project, Chapters 4 and 13, Boston, Massachusetts, November
    • Massachusetts Department of Public Works, Central Artery (I-93)/Tunnel (I-90) Project, Final Supplemental Environmental Impact Report, Chapters 4 and 13, Boston, Massachusetts, November 1990.
    • (1990) Final Supplemental Environmental Impact Report
  • 12
    • 33645702164 scopus 로고    scopus 로고
    • Massachusetts Highway Department: Central Artery/Tunnel Project Division 1 General Requirements and Covenants Section 7.00 Legal Relations and Responsibility to Public
    • Massachusetts Highway Department: Central Artery/Tunnel Project Division 1 General Requirements and Covenants Section 7.00 Legal Relations and Responsibility to Public.
  • 13
    • 33645721194 scopus 로고
    • Central Artery/Tunnel Project, Boston, Massachusetts, September
    • Massachusetts Highway Department: Central Artery/Tunnel Project, Construction Dust Control Specification 721.561, Boston, Massachusetts, September 1995.
    • (1995) Construction Dust Control Specification 721.561
  • 14
    • 33645715607 scopus 로고    scopus 로고
    • 10 and CO air quality monitoring plan for the central artery (I-93) mainline construction
    • April
    • 10 and CO Air Quality Monitoring Plan for the Central Artery (I-93) Mainline Construction, Final Draft, April 1997.
    • (1997) Final Draft


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.