메뉴 건너뛰기




Volumn 28, Issue 5-6, 2006, Pages 445-449

Dynamic programming approach for analyzing delayed product differentiation

Author keywords

Built to order; Dynamic programming; Postponement; Product differentiation

Indexed keywords

CUSTOMER SATISFACTION; DIFFERENTIATION (CALCULUS); EQUIPMENT; WAREHOUSES;

EID: 33645509909     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-004-2401-3     Document Type: Article
Times cited : (7)

References (13)
  • 1
    • 0002507193 scopus 로고
    • Centralized ordering policies in a multi-warehouse system with lead times and random demand in multi level production/inventory systems
    • Schwarz LB (ed) North Holland, Amsterdam
    • Eppen GD, Schrage L (1981) Centralized ordering policies in a multi-warehouse system with lead times and random demand in multi level production/inventory systems. In: Schwarz LB (ed) Theory and practice. North Holland, Amsterdam
    • (1981) Theory and Practice
    • Eppen, G.D.1    Schrage, L.2
  • 2
    • 0000748431 scopus 로고
    • Models tor assessing the value of warehouse risk-pooling: Risk-pooling over outside-supplier leadtimes
    • Schwatz LB (1989) Models tor assessing the value of warehouse risk-pooling: risk-pooling over outside-supplier leadtimes. Manage Sci 35:828-842
    • (1989) Manage Sci , vol.35 , pp. 828-842
    • Schwatz, L.B.1
  • 3
    • 0031219775 scopus 로고    scopus 로고
    • Supply chain partnerships: Opportunities for operations research
    • Maloni MJ, Benton WC (1997) Supply chain partnerships: opportunities for operations research. Eur J Oper Res 101:419-129
    • (1997) Eur J Oper Res , vol.101 , pp. 419-1129
    • Maloni, M.J.1    Benton, W.C.2
  • 4
    • 0028371172 scopus 로고
    • Coordination of production and distribution planning
    • Chandra P, Fisher ML (1994) Coordination of production and distribution planning. Eur J Oper Res 72:503-517
    • (1994) Eur J Oper Res , vol.72 , pp. 503-517
    • Chandra, P.1    Fisher, M.L.2
  • 5
    • 0006040250 scopus 로고
    • An integrated production, distribution and inventory planning system
    • Glover G, Jones G, Karney D, Klingman D, Mote J (1979) An integrated production, distribution and inventory planning system. Interfaces 9(5):21-35
    • (1979) Interfaces , vol.9 , Issue.5 , pp. 21-35
    • Glover, G.1    Jones, G.2    Karney, D.3    Klingman, D.4    Mote, J.5
  • 6
    • 0023984228 scopus 로고
    • Strategic analysis of integrated production-distribution systems: Models and methods
    • Cohen MA, Lee HL (1988) Strategic analysis of integrated production-distribution systems: models and methods. Oper Res 36:216-228
    • (1988) Oper Res , vol.36 , pp. 216-228
    • Cohen, M.A.1    Lee, H.L.2
  • 8
    • 3943096171 scopus 로고
    • Modularity, variety, and standardization in product design
    • Paper presented Massachusetts Institute of Technology, Cambridge, MA
    • Ulrich KT (1991) Modularity, variety, and standardization in product design. Paper presented at Production and Operations Summer Camp, Massachusetts Institute of Technology, Cambridge, MA
    • (1991) Production and Operations Summer Camp
    • Ulrich, K.T.1
  • 9
    • 0000935380 scopus 로고    scopus 로고
    • Effective management of inventory and service through product and process redesign
    • Lee HL (1996) Effective management of inventory and service through product and process redesign. Oper Res 44:151-159
    • (1996) Oper Res , vol.44 , pp. 151-159
    • Lee, H.L.1
  • 10
    • 0030734685 scopus 로고    scopus 로고
    • Modelling the costs and benefits of delayed product differentiation
    • Lee HL, Tang CS (1997) Modelling the costs and benefits of delayed product differentiation. Manage Sci 43(1):40-53
    • (1997) Manage Sci , vol.43 , Issue.1 , pp. 40-53
    • Lee, H.L.1    Tang, C.S.2
  • 11
    • 0020542746 scopus 로고
    • A dynamic programming formulation of a production sequencing problem
    • Rothblum UG (1983) A dynamic programming formulation of a production sequencing problem. Comput Ind Eng 7:69-75
    • (1983) Comput Ind Eng , vol.7 , pp. 69-75
    • Rothblum, U.G.1
  • 12
    • 0032142741 scopus 로고    scopus 로고
    • A new dynamic programming formulation of (n*m) flowshop sequencing problems with due dates
    • Sonmez AI, Baykasoglu A (1998) A new dynamic programming formulation of (n*m) flowshop sequencing problems with due dates. Int J Prod Res 36(6):2269-2283
    • (1998) Int J Prod Res , vol.36 , Issue.6 , pp. 2269-2283
    • Sonmez, A.I.1    Baykasoglu, A.2
  • 13
    • 33645513149 scopus 로고    scopus 로고
    • Top 1000 manufacturing firms
    • Taiwan R.O.C.
    • Commonwealth (2003) Top 1000 manufacturing firms. Commonwealth June:45-98, Taiwan R.O.C.
    • (2003) Commonwealth , vol.JUNE , pp. 45-98


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.