-
1
-
-
85040855641
-
-
John Wiley & Sons, New York John Wiley & Sons, New York (1995)
-
Asfahl CR (1985) Robots and manufacturing automation, John Wiley & Sons, New York John Wiley & Sons, New York (1995)
-
(1985)
Robots and Manufacturing Automation
-
-
Asfahl, C.R.1
-
2
-
-
9344244585
-
Final results on the one-cycle conjecture in robotic cells
-
Laboratoire LEIBNIZ, Institut IMAG, Grenoble, France
-
Brauner N, Finke G (1997) Final results on the one-cycle conjecture in robotic cells. Internal note, Laboratoire LEIBNIZ, Institut IMAG, Grenoble, France
-
(1997)
Internal Note
-
-
Brauner, N.1
Finke, G.2
-
3
-
-
0002804434
-
On the conjecture in robotic cells: New simplified proof for the three-machine case
-
Brauner N, Finke G (1999) On the conjecture in robotic cells: New simplified proof for the three-machine case. INFOR 37:20-36
-
(1999)
INFOR
, vol.37
, pp. 20-36
-
-
Brauner, N.1
Finke, G.2
-
5
-
-
0000424475
-
Classification of flexible manufacturing systems
-
April
-
Browne J, Dubois D, Rathmill K, Sethi SP, Stecke KE (April 1984) Classification of flexible manufacturing systems. The FMS Magazine 2(2): 114-117
-
(1984)
The FMS Magazine
, vol.2
, Issue.2
, pp. 114-117
-
-
Browne, J.1
Dubois, D.2
Rathmill, K.3
Sethi, S.P.4
Stecke, K.E.5
-
6
-
-
0034367676
-
Cyclic scheduling in robotic flow shops
-
Crama Y, Kats V, van de Klundert J, Levner E (2000) Cyclic scheduling in robotic flow shops. Annals of Operations Research: Mathematics of Industrial Systems 96(1):97-124
-
(2000)
Annals of Operations Research: Mathematics of Industrial Systems
, vol.96
, Issue.1
, pp. 97-124
-
-
Crama, Y.1
Kats, V.2
Van De Klundert, J.3
Levner, E.4
-
7
-
-
0031272146
-
Cyclic scheduling of identical parts in a robotic cell
-
Crama Y, van de Klundert J (1997) Cyclic scheduling of identical parts in a robotic cell. Operations Research 45:952-965
-
(1997)
Operations Research
, vol.45
, pp. 952-965
-
-
Crama, Y.1
Van De Klundert, J.2
-
8
-
-
0002604088
-
Cyclic scheduling in 3-machine robotic flow shops
-
Crama Y, van de Klundert J (1999) Cyclic scheduling in 3-machine robotic flow shops. Journal of Scheduling 2:35-54
-
(1999)
Journal of Scheduling
, vol.2
, pp. 35-54
-
-
Crama, Y.1
Van De Klundert, J.2
-
9
-
-
28244489538
-
Dominance of cyclic solutions and challenges in the scheduling of robotic cells
-
Dawande M, Geismar HN, Sethi S (2005a) Dominance of cyclic solutions and challenges in the scheduling of robotic cells. SIAM Review 47(4):709-721
-
(2005)
SIAM Review
, vol.47
, Issue.4
, pp. 709-721
-
-
Dawande, M.1
Geismar, H.N.2
Sethi, S.3
-
10
-
-
23944522312
-
Sequencing and scheduling in robotic cells: Recent developments
-
Dawande M, Geismar HN, Sethi S, Sriskandarajah C (2005b) Sequencing and scheduling in robotic cells: Recent developments. Journal of Scheduling 8(5):387-126
-
(2005)
Journal of Scheduling
, vol.8
, Issue.5
, pp. 387-1126
-
-
Dawande, M.1
Geismar, H.N.2
Sethi, S.3
Sriskandarajah, C.4
-
12
-
-
23944501918
-
A note on scheduling multiple parts in two-machine dual gripper robotic cell: Heuristic algorithm and performance guarantee
-
Drobouchevitch IG, Sethi S, Sidney J, Sriskandarajah C (2004) A note on scheduling multiple parts in two-machine dual gripper robotic cell: Heuristic algorithm and performance guarantee. International Journal of Operations and Quantitative Management 10(4):297-314
-
(2004)
International Journal of Operations and Quantitative Management
, vol.10
, Issue.4
, pp. 297-314
-
-
Drobouchevitch, I.G.1
Sethi, S.2
Sidney, J.3
Sriskandarajah, C.4
-
13
-
-
4043145060
-
Robotic cells with parallel machines: Throughput maximization in constant travel-time cells
-
Geismar HN, Dawande M, Sriskandarajah C (2004) Robotic cells with parallel machines: Throughput maximization in constant travel-time cells. Journal of Scheduling 7(5):375-395
-
(2004)
Journal of Scheduling
, vol.7
, Issue.5
, pp. 375-395
-
-
Geismar, H.N.1
Dawande, M.2
Sriskandarajah, C.3
-
16
-
-
0031142587
-
Scheduling in robotic cells: Classification, two and three machine cells
-
Hall NG, Kamoun H, Sriskandarajah C (1997) Scheduling in robotic cells: Classification, two and three machine cells. Operations Research 45:421-439
-
(1997)
Operations Research
, vol.45
, pp. 421-439
-
-
Hall, N.G.1
Kamoun, H.2
Sriskandarajah, C.3
-
18
-
-
0033727025
-
Evaluating the impact of process changes on cluster tool performance
-
Herrmann J, Chandrasekaran N, Conaghan B, Nguyen M, Rubloff G, Shi R (2000) Evaluating the impact of process changes on cluster tool performance. IEEE Transactions on Semiconductor Manufacturing 13:181-192
-
(2000)
IEEE Transactions on Semiconductor Manufacturing
, vol.13
, pp. 181-192
-
-
Herrmann, J.1
Chandrasekaran, N.2
Conaghan, B.3
Nguyen, M.4
Rubloff, G.5
Shi, R.6
-
21
-
-
0030214772
-
Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on throughput
-
Perkinson T, Gyurcsik R, McLarty P (1996) Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on throughput. IEEE Transactions on Semiconductor Manufacturing 9:384-400
-
(1996)
IEEE Transactions on Semiconductor Manufacturing
, vol.9
, pp. 384-400
-
-
Perkinson, T.1
Gyurcsik, R.2
McLarty, P.3
-
25
-
-
0000222016
-
Sequencing of parts and robot moves in a robotic cell
-
Sethi SP, Sriskandarajah C, Sorger G, Błażewicz J, Kubiak W (1992) Sequencing of parts and robot moves in a robotic cell. International Journal of Flexible Manufacturing Systems 4:331-358
-
(1992)
International Journal of Flexible Manufacturing Systems
, vol.4
, pp. 331-358
-
-
Sethi, S.P.1
Sriskandarajah, C.2
Sorger, G.3
Błazewicz, J.4
Kubiak, W.5
-
26
-
-
9644286254
-
Scheduling multiple parts in a robotic cell served by a dual gripper robot
-
Sriskandarajah C, Drobouchevitch IG, Sethi S, Chandrasekaran R (2004) Scheduling multiple parts in a robotic cell served by a dual gripper robot. Operations Research 52(1):65-82
-
(2004)
Operations Research
, vol.52
, Issue.1
, pp. 65-82
-
-
Sriskandarajah, C.1
Drobouchevitch, I.G.2
Sethi, S.3
Chandrasekaran, R.4
-
28
-
-
0030086424
-
Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems
-
Su Q, Chen F (1996) Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems. IEEE Transactions on Robotics and Automation 12:22-30
-
(1996)
IEEE Transactions on Robotics and Automation
, vol.12
, pp. 22-30
-
-
Su, Q.1
Chen, F.2
-
30
-
-
0030212052
-
Simple performance models for integrated processing tools
-
Wood S (1996) Simple performance models for integrated processing tools. IEEE Transactions on Semiconductor Manufacturing 9:320-328
-
(1996)
IEEE Transactions on Semiconductor Manufacturing
, vol.9
, pp. 320-328
-
-
Wood, S.1
|