메뉴 건너뛰기




Volumn 25, Issue 24, 2005, Pages 41-46

Economic equivalent of the power system security and reliability measure in power market environment

Author keywords

Economic equivalent; Load service entities; Power generation company; Power grid company; Power market; Power systems; Reliability; Security

Indexed keywords

INDUSTRIAL ECONOMICS; MATHEMATICAL MODELS; SECURITY SYSTEMS;

EID: 33644836089     PISSN: 02588013     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (10)

References (30)
  • 1
    • 85009335937 scopus 로고    scopus 로고
    • Chinese source
  • 2
    • 3242770441 scopus 로고    scopus 로고
    • Preliminary analysis of large scale blackout in interconnected North America power grid on August 14 and lessons to be drawn
    • Yin Yonghua, Guo Jianbo, Zhao Jianjun et al. Preliminary analysis of large scale blackout in interconnected North America power grid on August 14 and lessons to be drawn[J]. Power system technology, 2003, 27(10): 8-11.
    • (2003) Power System Technology , vol.27 , Issue.10 , pp. 8-11
    • Yin, Y.1    Guo, J.2    Zhao, J.3
  • 3
    • 2342429662 scopus 로고    scopus 로고
    • Rethinking and enlightenment of large scope blackout in interconnected north America power grid
    • Hu Xuehao. Rethinking and enlightenment of large scope blackout in interconnected north America power grid[J]. Power system technology, 2003, 27(9): T2-T6.
    • (2003) Power System Technology , vol.27 , Issue.9
    • Hu, X.1
  • 4
    • 2542491170 scopus 로고    scopus 로고
    • Power system security and its prevention
    • Han Zhenxiang, Cao Yijia. Power system security and its prevention [J]. Power system technology, 2004, 28(9): 1-6.
    • (2004) Power System Technology , vol.28 , Issue.9 , pp. 1-6
    • Han, Z.1    Cao, Y.2
  • 5
    • 4344597453 scopus 로고    scopus 로고
    • Strengthen power system security to ensure reliable delivery
    • Zhao Xizheng. Strengthen power system security to ensure reliable delivery[J]. Power System Technology, 2003, 27(10): 1-7.
    • (2003) Power System Technology , vol.27 , Issue.10 , pp. 1-7
    • Zhao, X.1
  • 6
    • 13944282146 scopus 로고    scopus 로고
    • Analyses of two typical voltage collapse incidents worldwide
    • Liu Peng, Wu Gang. Analyses of two typical voltage collapse incidents worldwide[J]. Power System Technology, 2003, 27(5): 35-37.
    • (2003) Power System Technology , vol.27 , Issue.5 , pp. 35-37
    • Liu, P.1    Wu, G.2
  • 7
    • 9744271757 scopus 로고    scopus 로고
    • Rethinking over 8.14 US-Canada blackout after one year
    • He Deyu. Rethinking over 8.14 US-Canada blackout after one year[J]. Power System Technology, 2004, 28(21): 1-5.
    • (2004) Power System Technology , vol.28 , Issue.21 , pp. 1-5
    • He, D.1
  • 8
    • 23944520843 scopus 로고    scopus 로고
    • Self-organized criticality phenomenon for power system blackouts
    • Cao Yijia, Jiang Quanyuan, Ding Lijie. Self-organized criticality phenomenon for power system blackouts[J]. Power System Technology, 2005, 29(15): 1-5.
    • (2005) Power System Technology , vol.29 , Issue.15 , pp. 1-5
    • Cao, Y.1    Jiang, Q.2    Ding, L.3
  • 9
    • 4744356298 scopus 로고    scopus 로고
    • Blackout in south of London and its lessons
    • Tang Baosheng. Blackout in south of London and its lessons[J]. Power System Technology, 2003, 27(11): 1-5.
    • (2003) Power System Technology , vol.27 , Issue.11 , pp. 1-5
    • Tang, B.1
  • 10
    • 2542425554 scopus 로고    scopus 로고
    • Analysis on blackout of interconnected north America power grid occurred on aug.14, 2003 from the viewpoint of Power system dispatching
    • Liu Yongqi, Xie Kai. Analysis on blackout of interconnected north America power grid occurred on aug.14, 2003 from the viewpoint of Power system dispatching[J]. Power System Technology, 28(8): 10-15, 45.
    • Power System Technology , vol.28 , Issue.8
    • Liu, Y.1    Xie, K.2
  • 11
    • 0038447126 scopus 로고    scopus 로고
    • The economic evaluation and responsibility assumption of back-up protection in power market environment
    • Zhang Baohui, Tan Lunnong. The economic evaluation and responsibility assumption of back-up protection in power market environment [J]. Proceedings of the CSEE, 2003, 23(3): 43-47.
    • (2003) Proceedings of the CSEE , vol.23 , Issue.3 , pp. 43-47
    • Zhang, B.1    Tan, L.2
  • 12
    • 0036872673 scopus 로고    scopus 로고
    • Reserve capacity for failure in power market environment
    • Tan Lunnong, Zhang Baohui. Reserve capacity for failure in power market environment[J]. Proceedings of the CSEE, 2002, 22(11): 54-58.
    • (2002) Proceedings of the CSEE , vol.22 , Issue.11 , pp. 54-58
    • Tan, L.1    Zhang, B.2
  • 13
    • 33644838993 scopus 로고    scopus 로고
    • Economic determination of the power system security in power market environment
    • Xi'an: Xi'an Jiaotong University
    • Tan Lunnong. Economic Determination of the Power System Security in Power Market Environment[D]. Xi'an: Xi'an Jiaotong University, 2003.
    • (2003)
    • Tan, L.1
  • 14
    • 14544286532 scopus 로고    scopus 로고
    • Research of power system security and reliability considering risk under environment of electricity market
    • Zhang Baohui, Wang Liyong, Tan Lunnong et al. Research of power system security and reliability considering risk under environment of electricity market[J]. Power System Technology, 2005, 29(3): 44-49.
    • (2005) Power System Technology , vol.29 , Issue.3 , pp. 44-49
    • Zhang, B.1    Wang, L.2    Tan, L.3
  • 15
    • 0031197386 scopus 로고    scopus 로고
    • A risk-based security index for determining operating limits in stability-limited electric power systems
    • McCalley J D, Fouad A A, Vittal V et al. A risk-based security index for determining operating limits in stability-limited electric power systems [J]. IEEE Trans. Power Systems, 1997, 12(3): 1210-1219.
    • (1997) IEEE Trans. Power Systems , vol.12 , Issue.3 , pp. 1210-1219
    • McCalley, J.D.1    Fouad, A.A.2    Vittal, V.3
  • 16
    • 0036577792 scopus 로고    scopus 로고
    • Dynamic security enhancement in power market system
    • David A K, Liu Xujun. Dynamic security enhancement in power market system[J]. IEEE Trans. Power Systems, 2002, 17(2): 431-438.
    • (2002) IEEE Trans. Power Systems , vol.17 , Issue.2 , pp. 431-438
    • David, A.K.1    Liu, X.2
  • 17
    • 0027541528 scopus 로고
    • Stability constrained optimal rescheduling of generation
    • Fouad A A, Tang Jianzhou. Stability constrained optimal rescheduling of generation[J]. IEEE Trans. Power Systems, 1993, 8(1): 105-112.
    • (1993) IEEE Trans. Power Systems , vol.8 , Issue.1 , pp. 105-112
    • Fouad, A.A.1    Tang, J.2
  • 18
    • 3242791916 scopus 로고    scopus 로고
    • Power system security cost optimization based on practical dynamic security region
    • Yu Yixin, Zhao Yishu. Power system security cost optimization based on practical dynamic security region[J]. Proceedings of the CSEE, 2004, 24(6): 13-18.
    • (2004) Proceedings of the CSEE , vol.24 , Issue.6 , pp. 13-18
    • Yu, Y.1    Zhao, Y.2
  • 19
    • 14544274934 scopus 로고    scopus 로고
    • Application of risk based transient stability and security assessment in power system
    • Wang Ying, Tang Dingzhong. Application of risk based transient stability and security assessment in power system[J]. Power System Technology, 2003, 27(12): 37-41.
    • (2003) Power System Technology , vol.27 , Issue.12 , pp. 37-41
    • Wang, Y.1    Tang, D.2
  • 20
    • 14544272249 scopus 로고    scopus 로고
    • Security cost calculation based on transient stability margin
    • Wu Zhengqiu, Jing Yong. Security cost calculation based on transient stability margin[J]. Power System Technology. 2001, 25(12): 26-30.
    • (2001) Power System Technology , vol.25 , Issue.12 , pp. 26-30
    • Wu, Z.1    Jing, Y.2
  • 21
    • 85009324985 scopus 로고    scopus 로고
    • Chinese source
  • 22
    • 0012498744 scopus 로고
    • Ministry of Water Resource and Power Industry, Beijing: Hydraulic and Electric Power Press
    • Ministry of Water Resource and Power Industry. Power System Technical Criteria SD131-84[S]. Beijing: Hydraulic and Electric Power Press. 1984.
    • (1984) Power System Technical Criteria SD131-84
  • 23
    • 33644847746 scopus 로고
    • Ministry of Water Resource and Power Industry, Beijing: Hydraulic and Electric Power Press
    • Ministry of Water Resource and Power Industry. Power system design technical regulations SDJ161-85[S]. Beijing: Hydraulic and Electric Power Press. 1985.
    • (1985) Power System Design Technical Regulations SDJ161-85
  • 24
    • 85009334140 scopus 로고    scopus 로고
    • Chinese source
  • 25
    • 85009317926 scopus 로고    scopus 로고
    • Chinese source
  • 26
    • 85009325910 scopus 로고    scopus 로고
    • Chinese source
  • 28
    • 0035248562 scopus 로고    scopus 로고
    • Reliability and reserve in competitive electricity market scheduling
    • Flynn M, Sheridan W P, Dillon J D et al. Reliability and reserve in competitive electricity market scheduling[J]. IEEE Trans. on Power Systems, 2001, 16(1): 78-87.
    • (2001) IEEE Trans. on Power Systems , vol.16 , Issue.1 , pp. 78-87
    • Flynn, M.1    Sheridan, W.P.2    Dillon, J.D.3
  • 29
    • 0034186802 scopus 로고    scopus 로고
    • Designing ancillary services markets for power system security
    • Zammit M A Z, Hill D J, Kaye R J. Designing ancillary services markets for power system security[J]. IEEE Transactions on Power Systems, 2000, 15(2): 675-680.
    • (2000) IEEE Transactions on Power Systems , vol.15 , Issue.2 , pp. 675-680
    • Zammit, M.A.Z.1    Hill, D.J.2    Kaye, R.J.3
  • 30
    • 68349150000 scopus 로고    scopus 로고
    • A model for the ISO insecurity costs management in a deregulated market scenario
    • Portugal
    • Carpentier J, Menniti D, Pinnarelli A et al. A model for the ISO insecurity costs management in a deregulated market scenario [C]. Portugal: IEEE Porto Power Tech Conference, 2001.
    • (2001) IEEE Porto Power Tech Conference
    • Carpentier, J.1    Menniti, D.2    Pinnarelli, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.