메뉴 건너뛰기




Volumn 154, Issue 5 SPEC. ISS., 2006, Pages 867-879

Review of combinatorial problems induced by spatial forest harvesting planning

Author keywords

Combinatorial algorithms; Environment; Spatial forestry

Indexed keywords

ALGORITHMS; BIODIVERSITY; EROSION; FORESTRY; HARVESTING; HEURISTIC METHODS; PROBLEM SOLVING; WATER QUALITY;

EID: 33644590512     PISSN: 0166218X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.dam.2005.05.025     Document Type: Article
Times cited : (44)

References (29)
  • 2
    • 0026435460 scopus 로고
    • Habitat dispersión in forest planning and the stable set problem
    • F. Barahona, A. Weintraub, and R. Epstein Habitat dispersión in forest planning and the stable set problem Oper. Res. 40 1 1992 S14 S21
    • (1992) Oper. Res. , vol.40 , Issue.1
    • Barahona, F.1    Weintraub, A.2    Epstein, R.3
  • 3
    • 0030764730 scopus 로고    scopus 로고
    • Voronoi tessellation methods to delineate harvest units for spatial forest planning
    • T. Barrett Voronoi tessellation methods to delineate harvest units for spatial forest planning Canad. J. Forest Res. 27 1997 903 910
    • (1997) Canad. J. Forest Res. , vol.27 , pp. 903-910
    • Barrett, T.1
  • 4
    • 0031742605 scopus 로고    scopus 로고
    • Economic and fragmentation effects of clear cut restrictions
    • T. Barret, T. Gilles, and L. Davis Economic and fragmentation effects of clear cut restrictions Forest Sci. 44 1998 569 577
    • (1998) Forest Sci. , vol.44 , pp. 569-577
    • Barret, T.1    Gilles, T.2    Davis, L.3
  • 5
    • 0035874108 scopus 로고    scopus 로고
    • The economic impact of green-up constraints in the southeastern united states
    • K. Boston, and P. Bettinger The economic impact of green-up constraints in the southeastern united states Forest Ecol. Manage. 145 2001 191 202
    • (2001) Forest Ecol. Manage. , vol.145 , pp. 191-202
    • Boston, K.1    Bettinger, P.2
  • 6
    • 33644588528 scopus 로고    scopus 로고
    • A 2 opt tabu search procedure for the multi-period forest harvesting problem with adjacency, green-up, old growth and even flow constraints
    • F. Caro, A. Weintraub, T. Martins, M. Constantino, A 2 opt tabu search procedure for the multi-period forest harvesting problem with adjacency, green-up, old growth and even flow constraints, Forest Sci. (2003) 191-202.
    • (2003) Forest Sci. , pp. 191-202
    • Caro, F.1    Weintraub, A.2    Martins, T.3    Constantino, M.4
  • 8
    • 0034127090 scopus 로고    scopus 로고
    • A three-stage heuristic for harvest scheduling with access road network development
    • M.M. Clark, R. Meller, and T. McDonald A three-stage heuristic for harvest scheduling with access road network development Forest Sci. 46 2000 204 218
    • (2000) Forest Sci. , vol.46 , pp. 204-218
    • Clark, M.M.1    Meller, R.2    McDonald, T.3
  • 10
    • 25144511439 scopus 로고    scopus 로고
    • Harvest scheduling subject to maximum area restrictions: Exploring exact approaches
    • M. Goycoolea, A. Murray, F. Barahona, R. Epstein, and A. Weintraub Harvest scheduling subject to maximum area restrictions: exploring exact approaches Oper. Res. 53 3 2005
    • (2005) Oper. Res. , vol.53 , Issue.3
    • Goycoolea, M.1    Murray, A.2    Barahona, F.3    Epstein, R.4    Weintraub, A.5
  • 11
    • 0032212039 scopus 로고    scopus 로고
    • Using dynamic programming and overlapping subproblems to address adjacency in large harvest scheduling problems
    • H. Hogansson, and J. Borges Using dynamic programming and overlapping subproblems to address adjacency in large harvest scheduling problems Forest Sci. 44 1998 526 538
    • (1998) Forest Sci. , vol.44 , pp. 526-538
    • Hogansson, H.1    Borges, J.2
  • 12
    • 0020821782 scopus 로고
    • Evaluating spatial feasibility of harvest schedules with simulated stand-selection decisions
    • R.H. Hokans, Evaluating spatial feasibility of harvest schedules with simulated stand-selection decisions, J. Forestry 81 (1983) 601-603, 613.
    • (1983) J. Forestry , vol.81 , pp. 601-603
    • Hokans, R.H.1
  • 13
    • 0027577685 scopus 로고
    • Exact optimal solution for facility layout: Deciding which pairs of locations should be adjacent
    • A. Houshyar, and B. White Exact optimal solution for facility layout: deciding which pairs of locations should be adjacent Comput. Ind. Eng. 24 1993 177 187
    • (1993) Comput. Ind. Eng. , vol.24 , pp. 177-187
    • Houshyar, A.1    White, B.2
  • 14
    • 0002243686 scopus 로고
    • Natural resource land management planning using large-scale linear programming: The USDA forest service experience with FORPLAN
    • B. Kent, B. Bare, R. Field, and G. Bradle Natural resource land management planning using large-scale linear programming: the USDA forest service experience with FORPLAN Oper. Res. 39 1991 13 27
    • (1991) Oper. Res. , vol.39 , pp. 13-27
    • Kent, B.1    Bare, B.2    Field, R.3    Bradle, G.4
  • 15
    • 0001285126 scopus 로고
    • Simultaneous planning of wildland management and transportation alternatives
    • M. Kirby, W. Hager, and P. Wong Simultaneous planning of wildland management and transportation alternatives TIMS Stud. Manage. Sci. 21 1986 371 387
    • (1986) TIMS Stud. Manage. Sci. , vol.21 , pp. 371-387
    • Kirby, M.1    Hager, W.2    Wong, P.3
  • 16
    • 0027749947 scopus 로고
    • Harvest scheduling with spatial constraints: A simulated annealing approach
    • C. Lockwood, and T. Moore Harvest scheduling with spatial constraints: a simulated annealing approach Canad. J. Forest Res. 23 1993 468 478
    • (1993) Canad. J. Forest Res. , vol.23 , pp. 468-478
    • Lockwood, C.1    Moore, T.2
  • 17
    • 0031675880 scopus 로고    scopus 로고
    • Forest management challenges for operational researchers
    • D. Martell, A. Gunn, and A. Weintraub Forest management challenges for operational researchers European J. Oper. Res. 104 1998 1 17
    • (1998) European J. Oper. Res. , vol.104 , pp. 1-17
    • Martell, D.1    Gunn, A.2    Weintraub, A.3
  • 18
    • 2342529513 scopus 로고    scopus 로고
    • A column generation approach for solving a non-temporal forest harvest model with spatial structure constraints
    • Centro de Investigacao Operational, Universidad de Lisboa
    • I. Martins, M. Constantino, J. Borges, A column generation approach for solving a non-temporal forest harvest model with spatial structure constraints, Technical Report, Centro de Investigacao Operational, Universidad de Lisboa, 2001.
    • (2001) Technical Report
    • Martins, I.1    Constantino, M.2    Borges, J.3
  • 20
    • 0033083079 scopus 로고    scopus 로고
    • Spatial restrictions in harvest scheduling
    • A. Murray Spatial restrictions in harvest scheduling Forest Sci. 45 1 1999 1 8
    • (1999) Forest Sci. , vol.45 , Issue.1 , pp. 1-8
    • Murray, A.1
  • 21
    • 0001682671 scopus 로고
    • Heuristic solution approaches to operational forest planning problems
    • A. Murray, and R. Church Heuristic solution approaches to operational forest planning problems OR Spektrum 17 1995 193 203
    • (1995) OR Spektrum , vol.17 , pp. 193-203
    • Murray, A.1    Church, R.2
  • 22
    • 0029810962 scopus 로고    scopus 로고
    • Analyzing cliques for imposing adjacency restrictions in forest models
    • A. Murray, and R. Church Analyzing cliques for imposing adjacency restrictions in forest models Forest Sci. 42 1996 166 175
    • (1996) Forest Sci. , vol.42 , pp. 166-175
    • Murray, A.1    Church, R.2
  • 23
    • 0036845146 scopus 로고    scopus 로고
    • Scale and unit specification influences in harvest scheduling with maximum area restrictions
    • A. Murray, and A. Weintraub Scale and unit specification influences in harvest scheduling with maximum area restrictions Forest Sci. 48 2002 779 789
    • (2002) Forest Sci. , vol.48 , pp. 779-789
    • Murray, A.1    Weintraub, A.2
  • 24
    • 33644588668 scopus 로고
    • Timber ram a long term planning method for commercial timber lands under multiple use management
    • USDA Forest Service, Berkeley, California
    • D. Navon, Timber ram a long term planning method for commercial timber lands under multiple use management, Research Paper PAW-70, USDA Forest Service, Berkeley, California, 1971, p. 22.
    • (1971) Research Paper , vol.PAW-70 , pp. 22
    • Navon, D.1
  • 25
    • 84974861933 scopus 로고
    • A strong cutting plane/branch-and-bound algorithm for node packing
    • G. Nemhauser, and G. Sigismondi A strong cutting plane/branch-and-bound algorithm for node packing Oper. Res. 43 5 1992 443 457
    • (1992) Oper. Res. , vol.43 , Issue.5 , pp. 443-457
    • Nemhauser, G.1    Sigismondi, G.2
  • 26
    • 0034029986 scopus 로고    scopus 로고
    • A model and tabu search method to optimize stand harvest and road construction schedules
    • E. Richards, and E. Gunn A model and tabu search method to optimize stand harvest and road construction schedules Forest Sci. 46 2000 188 203
    • (2000) Forest Sci. , vol.46 , pp. 188-203
    • Richards, E.1    Gunn, E.2
  • 29
    • 0016986036 scopus 로고
    • Forest management planning model integrating silvicultural and transportation activities
    • A. Weintraub, and D. Navon Forest management planning model integrating silvicultural and transportation activities Manage. Sci. 22 12 1976 1299 1309
    • (1976) Manage. Sci. , vol.22 , Issue.12 , pp. 1299-1309
    • Weintraub, A.1    Navon, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.