-
1
-
-
4344680315
-
A problem of forest harvesting and road building
-
N. Andalaft, P. Andalaft, M. Guignard, A. Magendzo, A. Wainer, and A. Weintraub A problem of forest harvesting and road building Oper. Res. 51 4 2003 613 628
-
(2003)
Oper. Res.
, vol.51
, Issue.4
, pp. 613-628
-
-
Andalaft, N.1
Andalaft, P.2
Guignard, M.3
Magendzo, A.4
Wainer, A.5
Weintraub, A.6
-
2
-
-
0026435460
-
Habitat dispersión in forest planning and the stable set problem
-
F. Barahona, A. Weintraub, and R. Epstein Habitat dispersión in forest planning and the stable set problem Oper. Res. 40 1 1992 S14 S21
-
(1992)
Oper. Res.
, vol.40
, Issue.1
-
-
Barahona, F.1
Weintraub, A.2
Epstein, R.3
-
3
-
-
0030764730
-
Voronoi tessellation methods to delineate harvest units for spatial forest planning
-
T. Barrett Voronoi tessellation methods to delineate harvest units for spatial forest planning Canad. J. Forest Res. 27 1997 903 910
-
(1997)
Canad. J. Forest Res.
, vol.27
, pp. 903-910
-
-
Barrett, T.1
-
4
-
-
0031742605
-
Economic and fragmentation effects of clear cut restrictions
-
T. Barret, T. Gilles, and L. Davis Economic and fragmentation effects of clear cut restrictions Forest Sci. 44 1998 569 577
-
(1998)
Forest Sci.
, vol.44
, pp. 569-577
-
-
Barret, T.1
Gilles, T.2
Davis, L.3
-
5
-
-
0035874108
-
The economic impact of green-up constraints in the southeastern united states
-
K. Boston, and P. Bettinger The economic impact of green-up constraints in the southeastern united states Forest Ecol. Manage. 145 2001 191 202
-
(2001)
Forest Ecol. Manage.
, vol.145
, pp. 191-202
-
-
Boston, K.1
Bettinger, P.2
-
6
-
-
33644588528
-
A 2 opt tabu search procedure for the multi-period forest harvesting problem with adjacency, green-up, old growth and even flow constraints
-
F. Caro, A. Weintraub, T. Martins, M. Constantino, A 2 opt tabu search procedure for the multi-period forest harvesting problem with adjacency, green-up, old growth and even flow constraints, Forest Sci. (2003) 191-202.
-
(2003)
Forest Sci.
, pp. 191-202
-
-
Caro, F.1
Weintraub, A.2
Martins, T.3
Constantino, M.4
-
8
-
-
0034127090
-
A three-stage heuristic for harvest scheduling with access road network development
-
M.M. Clark, R. Meller, and T. McDonald A three-stage heuristic for harvest scheduling with access road network development Forest Sci. 46 2000 204 218
-
(2000)
Forest Sci.
, vol.46
, pp. 204-218
-
-
Clark, M.M.1
Meller, R.2
McDonald, T.3
-
10
-
-
25144511439
-
Harvest scheduling subject to maximum area restrictions: Exploring exact approaches
-
M. Goycoolea, A. Murray, F. Barahona, R. Epstein, and A. Weintraub Harvest scheduling subject to maximum area restrictions: exploring exact approaches Oper. Res. 53 3 2005
-
(2005)
Oper. Res.
, vol.53
, Issue.3
-
-
Goycoolea, M.1
Murray, A.2
Barahona, F.3
Epstein, R.4
Weintraub, A.5
-
11
-
-
0032212039
-
Using dynamic programming and overlapping subproblems to address adjacency in large harvest scheduling problems
-
H. Hogansson, and J. Borges Using dynamic programming and overlapping subproblems to address adjacency in large harvest scheduling problems Forest Sci. 44 1998 526 538
-
(1998)
Forest Sci.
, vol.44
, pp. 526-538
-
-
Hogansson, H.1
Borges, J.2
-
12
-
-
0020821782
-
Evaluating spatial feasibility of harvest schedules with simulated stand-selection decisions
-
R.H. Hokans, Evaluating spatial feasibility of harvest schedules with simulated stand-selection decisions, J. Forestry 81 (1983) 601-603, 613.
-
(1983)
J. Forestry
, vol.81
, pp. 601-603
-
-
Hokans, R.H.1
-
13
-
-
0027577685
-
Exact optimal solution for facility layout: Deciding which pairs of locations should be adjacent
-
A. Houshyar, and B. White Exact optimal solution for facility layout: deciding which pairs of locations should be adjacent Comput. Ind. Eng. 24 1993 177 187
-
(1993)
Comput. Ind. Eng.
, vol.24
, pp. 177-187
-
-
Houshyar, A.1
White, B.2
-
14
-
-
0002243686
-
Natural resource land management planning using large-scale linear programming: The USDA forest service experience with FORPLAN
-
B. Kent, B. Bare, R. Field, and G. Bradle Natural resource land management planning using large-scale linear programming: the USDA forest service experience with FORPLAN Oper. Res. 39 1991 13 27
-
(1991)
Oper. Res.
, vol.39
, pp. 13-27
-
-
Kent, B.1
Bare, B.2
Field, R.3
Bradle, G.4
-
15
-
-
0001285126
-
Simultaneous planning of wildland management and transportation alternatives
-
M. Kirby, W. Hager, and P. Wong Simultaneous planning of wildland management and transportation alternatives TIMS Stud. Manage. Sci. 21 1986 371 387
-
(1986)
TIMS Stud. Manage. Sci.
, vol.21
, pp. 371-387
-
-
Kirby, M.1
Hager, W.2
Wong, P.3
-
16
-
-
0027749947
-
Harvest scheduling with spatial constraints: A simulated annealing approach
-
C. Lockwood, and T. Moore Harvest scheduling with spatial constraints: a simulated annealing approach Canad. J. Forest Res. 23 1993 468 478
-
(1993)
Canad. J. Forest Res.
, vol.23
, pp. 468-478
-
-
Lockwood, C.1
Moore, T.2
-
17
-
-
0031675880
-
Forest management challenges for operational researchers
-
D. Martell, A. Gunn, and A. Weintraub Forest management challenges for operational researchers European J. Oper. Res. 104 1998 1 17
-
(1998)
European J. Oper. Res.
, vol.104
, pp. 1-17
-
-
Martell, D.1
Gunn, A.2
Weintraub, A.3
-
18
-
-
2342529513
-
A column generation approach for solving a non-temporal forest harvest model with spatial structure constraints
-
Centro de Investigacao Operational, Universidad de Lisboa
-
I. Martins, M. Constantino, J. Borges, A column generation approach for solving a non-temporal forest harvest model with spatial structure constraints, Technical Report, Centro de Investigacao Operational, Universidad de Lisboa, 2001.
-
(2001)
Technical Report
-
-
Martins, I.1
Constantino, M.2
Borges, J.3
-
20
-
-
0033083079
-
Spatial restrictions in harvest scheduling
-
A. Murray Spatial restrictions in harvest scheduling Forest Sci. 45 1 1999 1 8
-
(1999)
Forest Sci.
, vol.45
, Issue.1
, pp. 1-8
-
-
Murray, A.1
-
21
-
-
0001682671
-
Heuristic solution approaches to operational forest planning problems
-
A. Murray, and R. Church Heuristic solution approaches to operational forest planning problems OR Spektrum 17 1995 193 203
-
(1995)
OR Spektrum
, vol.17
, pp. 193-203
-
-
Murray, A.1
Church, R.2
-
22
-
-
0029810962
-
Analyzing cliques for imposing adjacency restrictions in forest models
-
A. Murray, and R. Church Analyzing cliques for imposing adjacency restrictions in forest models Forest Sci. 42 1996 166 175
-
(1996)
Forest Sci.
, vol.42
, pp. 166-175
-
-
Murray, A.1
Church, R.2
-
23
-
-
0036845146
-
Scale and unit specification influences in harvest scheduling with maximum area restrictions
-
A. Murray, and A. Weintraub Scale and unit specification influences in harvest scheduling with maximum area restrictions Forest Sci. 48 2002 779 789
-
(2002)
Forest Sci.
, vol.48
, pp. 779-789
-
-
Murray, A.1
Weintraub, A.2
-
24
-
-
33644588668
-
Timber ram a long term planning method for commercial timber lands under multiple use management
-
USDA Forest Service, Berkeley, California
-
D. Navon, Timber ram a long term planning method for commercial timber lands under multiple use management, Research Paper PAW-70, USDA Forest Service, Berkeley, California, 1971, p. 22.
-
(1971)
Research Paper
, vol.PAW-70
, pp. 22
-
-
Navon, D.1
-
25
-
-
84974861933
-
A strong cutting plane/branch-and-bound algorithm for node packing
-
G. Nemhauser, and G. Sigismondi A strong cutting plane/branch-and-bound algorithm for node packing Oper. Res. 43 5 1992 443 457
-
(1992)
Oper. Res.
, vol.43
, Issue.5
, pp. 443-457
-
-
Nemhauser, G.1
Sigismondi, G.2
-
26
-
-
0034029986
-
A model and tabu search method to optimize stand harvest and road construction schedules
-
E. Richards, and E. Gunn A model and tabu search method to optimize stand harvest and road construction schedules Forest Sci. 46 2000 188 203
-
(2000)
Forest Sci.
, vol.46
, pp. 188-203
-
-
Richards, E.1
Gunn, E.2
-
29
-
-
0016986036
-
Forest management planning model integrating silvicultural and transportation activities
-
A. Weintraub, and D. Navon Forest management planning model integrating silvicultural and transportation activities Manage. Sci. 22 12 1976 1299 1309
-
(1976)
Manage. Sci.
, vol.22
, Issue.12
, pp. 1299-1309
-
-
Weintraub, A.1
Navon, D.2
|