메뉴 건너뛰기




Volumn 36, Issue 2, 2006, Pages 286-297

Assembling off-the-shelf components: "Learn as you go" systems engineering

Author keywords

Commercial off the shelf software (COTS); Multiobjective optimization; Programmatic and technical risk; Project management; Risk management; System assembly

Indexed keywords

OPTIMIZATION; PROJECT MANAGEMENT; RISK MANAGEMENT; SOFTWARE ENGINEERING; STRATEGIC PLANNING; SYSTEMS ANALYSIS;

EID: 33244478095     PISSN: 10834427     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSMCA.2005.851285     Document Type: Article
Times cited : (13)

References (43)
  • 3
    • 0035339048 scopus 로고    scopus 로고
    • "COTS-based systems top 10 list"
    • May
    • V. R. Basili and B. Boehm, "COTS-based systems top 10 list," Computer, vol. 34, no. 5, pp. 91-95, May 2001.
    • (2001) Computer , vol.34 , Issue.5 , pp. 91-95
    • Basili, V.R.1    Boehm, B.2
  • 4
    • 0035250133 scopus 로고    scopus 로고
    • "The problem with aviation COTS"
    • Feb
    • L. D. Alford, Jr., "The problem with aviation COTS," IEEE Aerosp. Electron. Syst. Mag., vol. 16, no. 2, pp. 33-37, Feb. 2001.
    • (2001) IEEE Aerosp. Electron. Syst. Mag. , vol.16 , Issue.2 , pp. 33-37
    • Alford Jr., L.D.1
  • 8
    • 0034431842 scopus 로고    scopus 로고
    • "NASA earth observing system mission operations center development using COTS products"
    • Big Sky, MT Mar. 18-25
    • J. A. DiUbaldo, "NASA earth observing system mission operations center development using COTS products," in IEEE Aerospace Conf. Proc., Big Sky, MT, Mar. 18-25, 2000, vol. 2, pp. 243-247.
    • (2000) IEEE Aerospace Conf. Proc. , vol.2 , pp. 243-247
    • DiUbaldo, J.A.1
  • 9
    • 4243560167 scopus 로고    scopus 로고
    • System Implementation Using Commercial Off-The-Shelf Software
    • Ottawa, ON, Canada: NRC-CNRC Software Engineering 2001. [Online]. Available
    • M. R. Vigder and J. Dean, System Implementation Using Commercial Off-The-Shelf Software. Ottawa, ON, Canada: NRC-CNRC Software Engineering, 2001. [Online]. Available: http://www.sel.iit.nrc.ca/ projects/cots/COTSpg.html
    • Vigder, M.R.1    Dean, J.2
  • 10
    • 0030689243 scopus 로고    scopus 로고
    • "COTS integration and critical systems"
    • Digest No. 97/013 London, U.K. Jan
    • V. Stavridou, "COTS, integration and critical systems," in IEE Colloq. Cots and Safety Critical Systems, Digest No. 97/013, London, U.K., Jan. 1997, pp. 3/1-3/5.
    • (1997) IEE Colloq. Cots and Safety Critical Systems
    • Stavridou, V.1
  • 11
    • 0032023574 scopus 로고    scopus 로고
    • "Acquiring COTS software selection requirements"
    • Mar.-Apr
    • N. A. Maiden and C. Ncube, "Acquiring COTS software selection requirements," IEEE Softw., vol. 15, no. 2, pp. 46-56, Mar.-Apr. 1998.
    • (1998) IEEE Softw. , vol.15 , Issue.2 , pp. 46-56
    • Maiden, N.A.1    Ncube, C.2
  • 12
    • 0031371613 scopus 로고    scopus 로고
    • "Lessons learned during requirements acquisition for COTS systems"
    • Dec
    • N. A. M. Maiden, C. Ncube, and A. Moore, "Lessons learned during requirements acquisition for COTS systems," Commun. ACM, vol. 40, no. 12, pp. 21-25, Dec. 1997.
    • (1997) Commun. ACM , vol.40 , Issue.12 , pp. 21-25
    • Maiden, N.A.M.1    Ncube, C.2    Moore, A.3
  • 14
    • 0033327182 scopus 로고    scopus 로고
    • "Requirements engineering for COTS based systems"
    • Nov
    • C. Rolland, "Requirements engineering for COTS based systems," Inf. Softw. Technol., vol. 41, no. 14, pp. 985-990, Nov. 1999.
    • (1999) Inf. Softw. Technol. , vol.41 , Issue.14 , pp. 985-990
    • Rolland, C.1
  • 16
    • 0034821851 scopus 로고    scopus 로고
    • "Integrated process planning and scheduling in holonic manufacturing systems"
    • Fukuoka,Japan
    • N. Sugimura, R. Hino, and T. Moriwaki, "Integrated process planning and scheduling in holonic manufacturing systems," in Proc. IEEE Int. Symp. Assembly and Task Planning, Fukuoka, Japan, 2001, pp. 250-255.
    • (2001) Proc. IEEE Int. Symp. Assembly Task Planning , pp. 250-255
    • Sugimura, N.1    Hino, R.2    Moriwaki, T.3
  • 19
    • 0142221400 scopus 로고    scopus 로고
    • "System of Systems (SoS) enterprise systems engineering for information-intensive organizations"
    • P. G. Carlock and R. E. Fenton, "System of Systems (SoS) enterprise systems engineering for information-intensive organizations," Syst. Eng., vol. 4, no. 4, pp. 242-261, 2001.
    • (2001) Syst. Eng. , vol.4 , Issue.4 , pp. 242-261
    • Carlock, P.G.1    Fenton, R.E.2
  • 20
    • 0003346045 scopus 로고    scopus 로고
    • "On customer value and improvement in product development processes"
    • T. R. Browning, "On customer value and improvement in product development processes," Syst. Eng., vol. 6, no. 1, pp. 49-61, 2003.
    • (2003) Syst. Eng. , vol.6 , Issue.1 , pp. 49-61
    • Browning, T.R.1
  • 21
    • 0013446501 scopus 로고    scopus 로고
    • "Process integration using the design structure matrix"
    • T. R. Browning, "Process integration using the design structure matrix," Syst. Eng., vol. 5, no. 3, pp. 180-193, 2002.
    • (2002) Syst. Eng. , vol.5 , Issue.3 , pp. 180-193
    • Browning, T.R.1
  • 24
    • 10444262299 scopus 로고    scopus 로고
    • "From a single discipline product to a multidisciplinary system: Adapting the right style to the right project"
    • D. Dvir, A. J. Shenhar, and S. Alkaher, "From a single discipline product to a multidisciplinary system: Adapting the right style to the right project," Syst. Eng., vol. 6, no. 3, pp. 123-134, 2003.
    • (2003) Syst. Eng. , vol.6 , Issue.3 , pp. 123-134
    • Dvir, D.1    Shenhar, A.J.2    Alkaher, S.3
  • 26
    • 0030242824 scopus 로고    scopus 로고
    • "Systems integration via software risk management"
    • Sep
    • C. G. Chittister and Y. Y. Haimes, "Systems integration via software risk management," IEEE Trans. Syst., Man, Cybern., A, vol. 26, pp. 521-532, Sep. 1996.
    • (1996) IEEE Trans. Syst. Man Cybern. A , vol.26 , pp. 521-532
    • Chittister, C.G.1    Haimes, Y.Y.2
  • 27
    • 0028381627 scopus 로고
    • "Assessment and management of software technical risk"
    • Feb
    • C. Chittister and Y. Y. Haimes, "Assessment and management of software technical risk," IEEE Trans. Syst., Man, Cybern., vol. 24, pp. 187-202, Feb. 1994.
    • (1994) IEEE Trans. Syst. Man Cybern. , vol.24 , pp. 187-202
    • Chittister, C.1    Haimes, Y.Y.2
  • 28
    • 0027601346 scopus 로고
    • "Risk associated with software development: A holistic framework for assessment and management"
    • May-Jun
    • C. Chittister and Y. Y. Haimes, "Risk associated with software development: A holistic framework for assessment and management," IEEE Trans. Syst., Man, Cybern., vol. 23, pp. 710-723, May-Jun. 1993.
    • (1993) IEEE Trans. Syst. Man Cybern. , vol.23 , pp. 710-723
    • Chittister, C.1    Haimes, Y.Y.2
  • 30
    • 24744439200 scopus 로고    scopus 로고
    • "Selection of technical risk responses for efficient contingencies"
    • E. Kujawski, "Selection of technical risk responses for efficient contingencies," Syst. Eng., vol. 5, no. 3, pp. 194-212, 2002a.
    • (2002) Syst. Eng. , vol.5 , Issue.3 , pp. 194-212
    • Kujawski, E.1
  • 31
    • 24744466680 scopus 로고    scopus 로고
    • "Why projects often fail even with high cost-contingencies"
    • E. Kujawski, "Why projects often fail, even with high cost-contingencies," Syst. Eng., vol. 5, no. 2, pp. 151-155, 2002b.
    • (2002) Syst. Eng. , vol.5 , Issue.2 , pp. 151-155
    • Kujawski, E.1
  • 32
    • 0030283987 scopus 로고    scopus 로고
    • "Managing design processes: A risk assessment approach"
    • Nov
    • N. Larson and A. Kusiak, "Managing design processes: A risk assessment approach," IEEE Trans. Syst., Man, Cybern., A, vol. 26, pp. 749-759, Nov. 1996.
    • (1996) IEEE Trans. Syst. Man Cybern. A , vol.26 , pp. 749-759
    • Larson, N.1    Kusiak, A.2
  • 33
    • 0013358510 scopus 로고    scopus 로고
    • "Sources of schedule risk in complex system development"
    • T. R. Browning, "Sources of schedule risk in complex system development," Syst. Eng., vol. 2, no. 3, pp. 129-142, 1999.
    • (1999) Syst. Eng. , vol.2 , Issue.3 , pp. 129-142
    • Browning, T.R.1
  • 34
    • 24744471149 scopus 로고    scopus 로고
    • "Project schedule recomputation after risk inclusion"
    • M. A. Shaikh, "Project schedule recomputation after risk inclusion," Syst. Eng., vol. 1, no. 3, pp. 242-249, 1998.
    • (1998) Syst. Eng. , vol.1 , Issue.3 , pp. 242-249
    • Shaikh, M.A.1
  • 35
    • 1842754758 scopus 로고    scopus 로고
    • "A methodology for modeling VVT risks and costs"
    • A. Engel and B. Miryam, "A methodology for modeling VVT risks and costs," Syst. Eng., vol. 6, no. 3, pp. 135-151, 2003.
    • (2003) Syst. Eng. , vol.6 , Issue.3 , pp. 135-151
    • Engel, A.1    Miryam, B.2
  • 36
    • 23744455799 scopus 로고    scopus 로고
    • "Predicting technology operational availability using technical maturity assessment"
    • C. R. Kenley and T. R. Creque, "Predicting technology operational availability using technical maturity assessment," Syst. Eng., vol. 2, no. 4, pp. 198-211, 1999.
    • (1999) Syst. Eng. , vol.2 , Issue.4 , pp. 198-211
    • Kenley, C.R.1    Creque, T.R.2
  • 41
  • 42
    • 0000096680 scopus 로고
    • "Mean-risk analysis with risk associated with below-target returns"
    • P. C. Fishburn, "Mean-risk analysis with risk associated with below-target returns," The Amer. Econ. Rev., vol. 67, no. 2, pp. 116-126, 1977.
    • (1977) The Amer. Econ. Rev. , vol.67 , Issue.2 , pp. 116-126
    • Fishburn, P.C.1
  • 43
    • 0028516886 scopus 로고
    • "Operational risk management: A new paradigm for decision making"
    • Oct
    • G. E. G. Beroggi and W. A. Wallace, "Operational risk management: A new paradigm for decision making," IEEE Trans. Syst., Man, Cybern., vol. 24, pp. 1450-1457, Oct. 1994.
    • (1994) IEEE Trans. Syst. Man, Cybern. , vol.24 , pp. 1450-1457
    • Beroggi, G.E.G.1    Wallace, W.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.