-
2
-
-
85189746381
-
Evaluation of rock riprap design practices for protection of channels near highway structures-Phase I
-
prepared by the U. S. Geological Survey in cooperation with Federal Highway Administration
-
Blodgett, J. C., and McConaughy, C. E. (1985). "Evaluation of rock riprap design practices for protection of channels near highway structures-Phase I. " Preliminary report subject to revision, prepared by the U. S. Geological Survey in cooperation with Federal Highway Administration.
-
(1985)
Preliminary report subject to revision
-
-
Blodgett, J.C.1
McConaughy, C.E.2
-
3
-
-
33144470791
-
-
Publication No. 204 1, C. V. J. Sharma, K. R. Saxema, and M. K. Rao, eds., Central Board of Irrigation and Power, New Delhi, India
-
Central Board of Irrigation and Power. (1989). "River behaviour management and training. " Publication No. 204, Vol. 1, C. V. J. Sharma, K. R. Saxema, and M. K. Rao, eds., Central Board of Irrigation and Power, New Delhi, India.
-
(1989)
River behaviour management and training
-
-
Board Of Irrigation, C.1
Power2
-
4
-
-
0029527684
-
Mechanics of riprap failure at bridge piers
-
Chiew, Y. M. (1995). "Mechanics of riprap failure at bridge piers. " J. Hydraul. Eng., 121(9), 635-643.
-
(1995)
J. Hydraul. Eng.
, vol.121
, Issue.9
, pp. 635-643
-
-
Chiew, Y.M.1
-
5
-
-
0142088868
-
Clear-water scour development at bridge abutments
-
Coleman, S. E., Lauchlan, C. S., and Melville, B. W. (2003). "Clear-water scour development at bridge abutments. " J. Hydraul. Res., 41(5), 521-532.
-
(2003)
J. Hydraul. Res.
, vol.41
, Issue.5
, pp. 521-532
-
-
Coleman, S.E.1
Lauchlan, C.S.2
Melville, B.W.3
-
6
-
-
33144469154
-
-
Report 89-A9303, Central Laboratories, Works and Development Services Corporation (NZ) Ltd., Lower Hutt, New Zealand
-
Croad, R. N. (1989). "Investigation of the pre-excavation of the abutment scour hole at bridge abutments. " Report 89-A9303, Central Laboratories, Works and Development Services Corporation (NZ) Ltd., Lower Hutt, New Zealand.
-
(1989)
Investigation of the pre-excavation of the abutment scour hole at bridge abutments
-
-
Croad, R.N.1
-
7
-
-
33144455458
-
-
ME thesis, Civil and Resource Engineering Dept., Univ. of Auckland, Auckland, New Zealand
-
Eve, N. J. (1999). "Riprap protection of bridge abutments. " ME thesis, Civil and Resource Engineering Dept., Univ. of Auckland, Auckland, New Zealand.
-
(1999)
Riprap protection of bridge abutments
-
-
Eve, N.J.1
-
8
-
-
33144465451
-
-
Civil Division Publication, Ministry of Works and Development, Hamilton, New Zealand
-
Gregorius, B. H. (1985). "Waterway design procedures-Guidelines. " Civil Division Publication, Ministry of Works and Development, Hamilton, New Zealand.
-
(1985)
Waterway design procedures-Guidelines
-
-
Gregorius, B.H.1
-
9
-
-
85189761051
-
Hydraulic design of bridges
-
Chap. 1, Drainage and Hydrology Section, Ontario Ministry of Transportation, Downsview, Ontario, Canada
-
Harris, J. D. (1988). "Hydraulic design of bridges. " MTC Drainage Manual, Chap. 1, Drainage and Hydrology Section, Ontario Ministry of Transportation, Downsview, Ontario, Canada, I1-IC21.
-
(1988)
MTC Drainage Manual
, pp. I1-IC21
-
-
Harris, J.D.1
-
10
-
-
33144469378
-
-
Project Report No. PCRE 01:18, Dept. of Civil and Resource Engineering, Univ. of Auckland, Auckland, New Zealand
-
Hoe, D. A. (2001). "Cable-tied block protection of bridge abutments. " Project Report No. PCRE 01:18, Dept. of Civil and Resource Engineering, Univ. of Auckland, Auckland, New Zealand.
-
(2001)
Cable-tied block protection of bridge abutments
-
-
Hoe, D.A.1
-
11
-
-
0029232088
-
Alternative scour countermeasures
-
New York
-
Jones, J. S., Bertoldi, D. A., and Stein, S. (1995). "Alternative scour countermeasures. " Proc., Hydraulic Engineering '95, ASCE, New York, 1819-1823.
-
(1995)
Proc., Hydraulic Engineering '95, ASCE
, pp. 1819-1823
-
-
Jones, J.S.1
Bertoldi, D.A.2
Stein, S.3
-
12
-
-
33144482811
-
-
PhD thesis, Univ. of Auckland, Auckland, New Zealand
-
Lauchlan, C. S. (1999). "Countermeasures for pier scour. " PhD thesis, Univ. of Auckland, Auckland, New Zealand.
-
(1999)
Countermeasures for pier scour
-
-
Lauchlan, C.S.1
-
14
-
-
33144477436
-
-
Report 3-86/12, Central Laboratories, Ministry of Works and Development, Lower Hutt, New Zealand
-
Macky, G. H. (1986). "Model testing of bridge abutment scour protection. " Report 3-86/12, Central Laboratories, Ministry of Works and Development, Lower Hutt, New Zealand.
-
(1986)
Model testing of bridge abutment scour protection
-
-
MacKy, G.H.1
-
15
-
-
0029414290
-
Bridge abutment scour in compound channels
-
Melville, B. W. (1995). "Bridge abutment scour in compound channels. " J. Hydraul. Eng., 121(12), 863-868.
-
(1995)
J. Hydraul. Eng.
, vol.121
, Issue.12
, pp. 863-868
-
-
Melville, B.W.1
-
16
-
-
0031080348
-
Pier and abutment scour: Integrated approach
-
Melville, B. W. (1997). "Pier and abutment scour: Integrated approach. " J. Hydraul. Eng., 123(2), 125-136.
-
(1997)
J. Hydraul. Eng.
, vol.123
, Issue.2
, pp. 125-136
-
-
Melville, B.W.1
-
18
-
-
33144484084
-
-
Ministry of Works and Development. Civil Division Publication CDP 705/C, Ministry of Works and Development, Wellington, New Zealand
-
Ministry of Works and Development. (1979). "Code of practice for the design of bridge waterways. " Civil Division Publication CDP 705/C, Ministry of Works and Development, Wellington, New Zealand.
-
(1979)
Code of practice for the design of bridge waterways
-
-
-
19
-
-
11744285963
-
-
Report No. FHWA-RD-91-057, Federal Highway Administration, USDOT, Washington, D. C
-
Pagan-Ortiz, J. E. (1991). "Stability of rock riprap for protection at the toe of abutments located at the flood plain. " Report No. FHWA-RD-91-057, Federal Highway Administration, USDOT, Washington, D. C.
-
(1991)
Stability of rock riprap for protection at the toe of abutments located at the flood plain
-
-
Pagan-Ortiz, J.E.1
-
20
-
-
0242400858
-
-
Draft Final Report (Project NCHRP 24-7) prepared for National Cooperative Highway Research Program, Univ. of Minnesota, Minneapolis
-
Parker, G., Toro-Escobar, C., and Voigt, R. L., Jr. (1998). "Countermeasures to protect bridge piers from scour. " Draft Final Report (Project NCHRP 24-7) prepared for National Cooperative Highway Research Program, Univ. of Minnesota, Minneapolis.
-
(1998)
Countermeasures to protect bridge piers from scour
-
-
Parker, G.1
Toro-Escobar, C.2
Voigt, R.L.3
-
21
-
-
0027402348
-
Stability of riprap at bridge piers
-
Parola, A. C. (1993). "Stability of riprap at bridge piers. " J. Hydraul. Eng., 119(10), 1080-1093.
-
(1993)
J. Hydraul. Eng.
, vol.119
, Issue.10
, pp. 1080-1093
-
-
Parola, A.C.1
-
22
-
-
0003391902
-
-
Balkema, Rotterdam, The Netherlands
-
Przedwojski, B., Blazejeski, R., and Pilarczyk, K. W. (1995). River training techniques, Balkema, Rotterdam, The Netherlands.
-
(1995)
River training techniques
-
-
Przedwojski, B.1
Blazejeski, R.2
Pilarczyk, K.W.3
-
23
-
-
85189750160
-
-
Report No. FHWA-IP-90-017, Hydraulic Engineering Circular No. 18 (HEC-18), 3rd. Ed., Office of Technology Applications, HTA-22, Federal Highway Administration, USDOT, Washington, D. C
-
Richardson, E. V., and Davis, S. R. (1995). "Evaluating scour at bridges. " Report No. FHWA-IP-90-017, Hydraulic Engineering Circular No. 18 (HEC-18), 3rd. Ed., Office of Technology Applications, HTA-22, Federal Highway Administration, USDOT, Washington, D. C.
-
(1995)
Evaluating scour at bridges
-
-
Richardson, E.V.1
Davis, S.R.2
-
24
-
-
33144484565
-
-
C. S. U. Civil Engineering Report No. CER71-72DBS-GL10, prepared for the Wyoming State Highway Dept. in conjunction with USDOT, Washington, D. C
-
Simons, D. B., and Lewis, G. L. (1971). "Report-Flood protection at bridge crossings. " C. S. U. Civil Engineering Report No. CER71-72DBS-GL10, prepared for the Wyoming State Highway Dept. in conjunction with USDOT, Washington, D. C.
-
(1971)
Report-Flood protection at bridge crossings
-
-
Simons, D.B.1
Lewis, G.L.2
-
25
-
-
33144478184
-
-
Report No. FHWA-AZ-89-260 1, Arizona DOT
-
Simons, D. B., Li, R. M., and Associates (1989). "Sizing riprap for the protection of approach embankments and spur dykes and limiting the depth of scour at bridge piers and abutments. " Vol. 1, Report No. FHWA-AZ-89-260, Vol. 1, Arizona DOT.
-
(1989)
Sizing riprap for the protection of approach embankments and spur dykes and limiting the depth of scour at bridge piers and abutments
, vol.1
-
-
Simons, D.B.1
Li, R.M.2
Associates3
-
26
-
-
0028667708
-
Clear-water scour around abutments in floodplains
-
Sturm, T. W., and Janjua, N. S. (1994). "Clear-water scour around abutments in floodplains. " J. Hydraul. Eng., 120(8), 956-972.
-
(1994)
J. Hydraul. Eng.
, vol.120
, Issue.8
, pp. 956-972
-
-
Sturm, T.W.1
Janjua, N.S.2
|