-
1
-
-
0035253032
-
A factor-analysis method for diagnosing variability in multivariate manufacturing processes
-
Apley, D. and Shi, J., (2001), "A Factor-Analysis Method for Diagnosing Variability in Multivariate Manufacturing Processes", Technometrics. Vol. 43, No.1 pp84-95
-
(2001)
Technometrics
, vol.43
, Issue.1
, pp. 84-95
-
-
Apley, D.1
Shi, J.2
-
2
-
-
0029321774
-
Dimensional variation reduction for automotive body assembly
-
Ceglarek, D. and Shi, J., (1995), "Dimensional Variation Reduction for Automotive Body Assembly", J. of Mfg. Review, Vol. 8, pp139-154.
-
(1995)
J. of Mfg. Review
, vol.8
, pp. 139-154
-
-
Ceglarek, D.1
Shi, J.2
-
3
-
-
0039927702
-
Stream of variation modeling and diagnosis of multistation machining processes
-
MED November, Orlando, FL
-
Huang, Q., Zhou, N. and Shi, J., (2000), "Stream of Variation Modeling and Diagnosis of Multistation Machining Processes", Proc. 2000 ASME IMECE, MED-Vol. 11, pp.81-88, November, Orlando, FL.
-
(2000)
Proc. 2000 ASME IMECE
, vol.11
, pp. 81-88
-
-
Huang, Q.1
Zhou, N.2
Shi, J.3
-
4
-
-
0000246790
-
Principal components and factor analysis: Part i - Principal components
-
Jackson, J. E. (1980), "Principal Components and Factor Analysis: part I - Principal Components," J. of Quality Tech., Vol. 12, pp201-213
-
(1980)
J. of Quality Tech.
, vol.12
, pp. 201-213
-
-
Jackson, J.E.1
-
5
-
-
0033117158
-
A hybrid approach for identification of root causes and reliability improvement of a die bonding process- A case study
-
Li, H. X., Zuo, M. J., (1999), "A hybrid approach for identification of root causes and reliability improvement of a die bonding process- a case study", Reliability Eng. & Sys. Safety, Vol. 64, pp43-48.
-
(1999)
Reliability Eng. & Sys. Safety
, vol.64
, pp. 43-48
-
-
Li, H.X.1
Zuo, M.J.2
-
6
-
-
0030288312
-
PDES - An expert system for constructing the precedence diagram
-
Liu, T. I. and Yuan, G., (1996), "PDES - an expert system for constructing the precedence diagram", J. of the Franklin Inst., v 333B, n 6, p 975-990.
-
(1996)
J. of the Franklin Inst.
, vol.333 B
, Issue.6
-
-
Liu, T.I.1
Yuan, G.2
-
7
-
-
0026214707
-
Improving manufacturing reliability in IC package assembly using the FMEA technique
-
Sep
-
Prasad, S., (1991), "Improving manufacturing reliability in IC package assembly using the FMEA technique", IEEE Trans. on Components, Hybrids and Mfg. Tech., v 14, n 3, Sep, p 452-456.
-
(1991)
IEEE Trans. on Components, Hybrids and Mfg. Tech.
, vol.14
, Issue.3
, pp. 452-456
-
-
Prasad, S.1
-
9
-
-
0001648555
-
Research issues and ideas in statistical process control
-
Woodall, W. H. and Montgomery, D. C., (1999), "Research Issues and Ideas in Statistical Process Control", J. of Quality Tech., Vol.31, pp376-386.
-
(1999)
J. of Quality Tech.
, vol.31
, pp. 376-386
-
-
Woodall, W.H.1
Montgomery, D.C.2
-
10
-
-
0037389565
-
State space modeling of dimensional variation propagation in multistage machining process using differential motion vector
-
Zhou, S., Huang Q. and Shi J., (2003), "State Space Modeling of Dimensional Variation Propagation in Multistage Machining Process Using Differential Motion Vector", IEEE Trans. on Robotics and Automation, Vol. 19, No. 2, pp296-309.
-
(2003)
IEEE Trans. on Robotics and Automation
, vol.19
, Issue.2
, pp. 296-309
-
-
Zhou, S.1
Huang, Q.2
Shi, J.3
|