|
Volumn 28, Issue 14, 2004, Pages 6-9
|
An introduction to pingguo TCSC project and its function in China southern power grid
|
Author keywords
Power system stability; TCSC; Transmission capacity
|
Indexed keywords
COMPUTER SIMULATION;
ELECTRIC UTILITIES;
GEOGRAPHICAL REGIONS;
NETWORKS (CIRCUITS);
STABILITY;
FIXED SERIAL COMPENSATION (FSC);
POWER SYSTEM STABILITY;
TCSC;
TRANSMISSION CAPACITY;
POWER TRANSMISSION;
|
EID: 3242815350
PISSN: 10003673
EISSN: None
Source Type: Journal
DOI: None Document Type: Article |
Times cited : (15)
|
References (6)
|