-
1
-
-
0023977010
-
The shifting bottleneck procedure for job shop scheduling
-
Adams, J., Balas, E. and Zawack, D. (1988) The shifting bottleneck procedure for job shop scheduling. Management Science, 34, 391-401.
-
(1988)
Management Science
, vol.34
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
5
-
-
3142659452
-
-
M.S. thesis, Sakarya University Institute of Science and Technology, Sakarya, Turkey
-
Canbolat, Y. B. (2000) Scheduling with Fuzzy Logic at Job Shop Control, M.S. thesis, Sakarya University Institute of Science and Technology, Sakarya, Turkey.
-
(2000)
Scheduling with Fuzzy Logic at Job Shop Control
-
-
Canbolat, Y.B.1
-
6
-
-
3142721082
-
Reducing work in process (WIP) with fuzzy logic at job shop scheduling
-
Hamburg, Germany, September 2000
-
Canbolat, Y. B., Ariduru, A., Gundogar, E. and Aksoy, S. (2000) Reducing work in process (WIP) with fuzzy logic at job shop scheduling. Proceedings of the 12th European Simulation Symposium, Hamburg, Germany, September 2000, pp. 271-275.
-
(2000)
Proceedings of the 12th European Simulation Symposium
, pp. 271-275
-
-
Canbolat, Y.B.1
Ariduru, A.2
Gundogar, E.3
Aksoy, S.4
-
8
-
-
0004083533
-
-
McGraw-Hill Companies, New York
-
Chase, R. B., Aquilano, N. J. and Jacobs, F. R. (1998) Production and Operations Management: Manufacturing and Services, McGraw-Hill Companies, New York.
-
(1998)
Production and Operations Management: Manufacturing and Services
-
-
Chase, R.B.1
Aquilano, N.J.2
Jacobs, F.R.3
-
13
-
-
0004156935
-
-
Natick, MA
-
Fuzzy Logic Toolbox. (1998) The Math Works, Natick, MA.
-
(1998)
The Math Works
-
-
-
16
-
-
0023978834
-
Expert systems for planning and scheduling manufacturing systems
-
Kusiak, A. and Chen, M. (1988) Expert systems for planning and scheduling manufacturing systems. European Journal of Operational Research, 34, 113-130.
-
(1988)
European Journal of Operational Research
, vol.34
, pp. 113-130
-
-
Kusiak, A.1
Chen, M.2
-
17
-
-
0026461248
-
Job shop scheduling by simulated annealing
-
Laarhoven, P. J., Aarts, E. H. L. and Lenstra, J. K. (1992) Job shop scheduling by simulated annealing. Operations Research, 40, 113-125.
-
(1992)
Operations Research
, vol.40
, pp. 113-125
-
-
Laarhoven, P.J.1
Aarts, E.H.L.2
Lenstra, J.K.3
-
19
-
-
0004249572
-
-
Prentice-Hall Inc, New Jersey
-
Narasimhan, S. L., Mcleavey, D. W. and Billington, P. J. (1995) Production Planning and Inventory Control, Prentice-Hall Inc, New Jersey.
-
(1995)
Production Planning and Inventory Control
-
-
Narasimhan, S.L.1
McLeavey, D.W.2
Billington, P.J.3
-
20
-
-
0004909888
-
Expert system for selecting priority rules in flexible manufacturing systems
-
Pierreval, H. (1992) Expert system for selecting priority rules in flexible manufacturing systems. Expert Systems with Application, 5, 51-57.
-
(1992)
Expert Systems with Application
, vol.5
, pp. 51-57
-
-
Pierreval, H.1
-
21
-
-
0005869183
-
Neural network to select dynamic scheduling heuristic
-
Pierreval, H. (1993) Neural network to select dynamic scheduling heuristic, Journal of Decision System, 2, 173-190.
-
(1993)
Journal of Decision System
, vol.2
, pp. 173-190
-
-
Pierreval, H.1
-
22
-
-
0031165072
-
Dynamic selection of despatching rules for manufacturing system scheduling
-
Pierreval, H. and Mebarki, N. (1997) Dynamic selection of despatching rules for manufacturing system scheduling. International Journal of Production Research, 35, 1575-1591.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 1575-1591
-
-
Pierreval, H.1
Mebarki, N.2
-
23
-
-
0003438602
-
-
Prentice-Hall, Englewood Cliffs, NJ
-
Pinedo, M. (1995) Scheduling: Theory, Algorithms, and Systems, Prentice-Hall, Englewood Cliffs, NJ.
-
(1995)
Scheduling: Theory, Algorithms, and Systems
-
-
Pinedo, M.1
-
25
-
-
84952488322
-
An expert neural network system for dynamic job shop scheduling
-
Sim, S. K., Yeo, K. T. and Lee, W. H. (1994) An expert neural network system for dynamic job shop scheduling. International Journal of Production Research, 32, 1759-1773.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 1759-1773
-
-
Sim, S.K.1
Yeo, K.T.2
Lee, W.H.3
-
26
-
-
0032686543
-
Fuzzy inference-based multiple criteria FMS scheduling
-
Yu, L., Shih, H. M. and Sekiguchi, T. (1999) Fuzzy inference-based multiple criteria FMS scheduling. International Journal of Production Research, 37, 2315-2333.
-
(1999)
International Journal of Production Research
, vol.37
, pp. 2315-2333
-
-
Yu, L.1
Shih, H.M.2
Sekiguchi, T.3
-
28
-
-
1842467064
-
A theory of approximate reasoning
-
University of California, Berkeley
-
Zadeh, L. A. (1977) A theory of approximate reasoning. Memo UCB/ERL M77/58, University of California, Berkeley.
-
(1977)
Memo UCB/ERL M77/58
-
-
Zadeh, L.A.1
-
30
-
-
84872240302
-
A neural network approach to job-shop scheduling
-
San Diego
-
Zhou, D. N., Cherkassky V., Baldwin, T. R. and Olson, D. E. (1991) A neural network approach to job-shop scheduling. Proceedings of the International Joint Conference on Neural Networks, vol. 3, San Diego, pp. 889-894.
-
(1991)
Proceedings of the International Joint Conference on Neural Networks
, vol.3
, pp. 889-894
-
-
Zhou, D.N.1
Cherkassky, V.2
Baldwin, T.R.3
Olson, D.E.4
|