Volumn 24, Issue 22, 2005, Pages 4055-4064

Regression analysis of initial geostress field for left bank high slope region at Longtan hydropower station

Author keywords

High slope; Hydraulic engineering; Initial geostress field; Longtan hydropower station

Indexed keywords

COMPUTER SIMULATION; HYDRAULICS; REGRESSION ANALYSIS; STRESSES;

EID: 30944437300     PISSN: 10006915     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (30)

References (17)
  • 1
    • 25144515873 scopus 로고
    • Analysis report of geostress measure on Longtan hydropower station
    • Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation. Changsha: Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation, Chinese source
    • Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation. Analysis report of geostress measure on Longtan hydropower station[R]. Changsha: Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation, 1993. (in Chinese)
    • (1993)
  • 2
    • 24344456801 scopus 로고
    • Tests and studies of the rock mass stress field of the underground powerhouse area of Longtan hydropower station
    • Chinese source
    • Gong Guangwei. Tests and studies of the rock mass stress field of the underground powerhouse area of Longtan hydropower station[J]. Hongshui River, 1994, 13(3): 11-18. (in Chinese)
    • (1994) Hongshui River , vol.13 , Issue.3 , pp. 11-18
    • Gong, G.1
  • 3
    • 30944465506 scopus 로고    scopus 로고
    • Geostress problems of underground powerhouse area of Longtan hydropower station
    • Chinese source
    • Zhao Guangzhi. Geostress problems of underground powerhouse area of Longtan hydropower station[J]. Mid-South Waterpower, 1998, 9(3): 1-6. (in Chinese)
    • (1998) Mid-South Waterpower , vol.9 , Issue.3 , pp. 1-6
    • Zhao, G.1
  • 4
    • 13444291295 scopus 로고    scopus 로고
    • Back analysis of 3D in-situ stress field of underground powerhouse area of Longtan hydropower station
    • Chinese source
    • Mei Songhua, Sheng Qian, Feng Xiating, et al. Back analysis of 3D in-situ stress field of underground powerhouse area of Longtan hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(23): 4006-4011. (in Chinese)
    • (2004) Chinese Journal of Rock Mechanics and Engineering , vol.23 , Issue.23 , pp. 4006-4011
    • Mei, S.1    Sheng, Q.2    Feng, X.3
  • 5
    • 0005833530 scopus 로고
    • Some consideration of the back analysis from displacements
    • Chinese source
    • Yang Zhifa, Xiong Shuncheng, Wang Cunyu, et al. Some consideration of the back analysis from displacements[J]. Chinese Journal of Rock Mechanics and Engineering, 1995, 14(1): 11-16. (in Chinese)
    • (1995) Chinese Journal of Rock Mechanics and Engineering , vol.14 , Issue.1 , pp. 11-16
    • Yang, Z.1    Xiong, S.2    Wang, C.3
  • 6
    • 15944381767 scopus 로고
    • The analytical method of the initial stress field for rock masses
    • Chinese source
    • Guo Huaizhi, Ma Qichao, Xue Xicheng, et al. The analytical method of the initial stress field for rock masses[J]. Chinese Journal of Geotechnical Engineering, 1983, 5(3): 64-75. (in Chinese)
    • (1983) Chinese Journal of Geotechnical Engineering , vol.5 , Issue.3 , pp. 64-75
    • Guo, H.1    Ma, Q.2    Xue, X.3
  • 8
    • 30944440140 scopus 로고    scopus 로고
    • Study on initial geostress of underground powerhouse of Nuozhadu power station
    • Chinese source
    • Li Li, He Jiangda, Lin Zhengwei, et al. Study on initial geostress of underground powerhouse of Nuozhadu power station[J]. Hongshui River, 2003, 22(4): 28-32. (in Chinese)
    • (2003) Hongshui River , vol.22 , Issue.4 , pp. 28-32
    • Li, L.1    He, J.2    Lin, Z.3
  • 9
    • 0028582873 scopus 로고
    • Back analysis of initial stresses in rock masses
    • Chinese source
    • Zhu Bofang. Back analysis of initial stresses in rock masses[J]. Journal of Hydraulic Engineering, 1994, (10): 30-35. (in Chinese)
    • (1994) Journal of Hydraulic Engineering , Issue.10 , pp. 30-35
    • Zhu, B.1
  • 10
    • 15944362418 scopus 로고    scopus 로고
    • Regression analysis of 3D geostress field on Jinping secondary hydropower station
    • Chinese source
    • Xiao Ming, Liu Zhiming. Regression analysis of 3D geostress field on Jinping secondary hydropower station[J]. Yangtze River, 2000, 31(9): 42-44. (in Chinese)
    • (2000) Yangtze River , vol.31 , Issue.9 , pp. 42-44
    • Xiao, M.1    Liu, Z.2
  • 11
    • 30944444873 scopus 로고    scopus 로고
    • Regression analysis of initial geostress for an underground power plant region
    • Chinese source
    • Dong Zhigao, Wu Jimin, Shi Zhiqun. et al. Regression analysis of initial geostress for an underground power plant region[J]. Journal of Hohai University (Natural Sciences), 2003, 31(5): 543-546. (in Chinese)
    • (2003) Journal of Hohai University (Natural Sciences) , vol.31 , Issue.5 , pp. 543-546
    • Dong, Z.1    Wu, J.2    Shi, Z.3
  • 12
    • 0005884433 scopus 로고
    • Some problems in FEA for geotechnical engineering
    • Chinese source
    • Zheng Hong, Ge Xiurun, Gu Xianrong, et al. Some problems in FEA for geotechnical engineering[J]. Rock and Soil Mechanics, 1995, 16(3): 7-12. (in Chinese)
    • (1995) Rock and Soil Mechanics , vol.16 , Issue.3 , pp. 7-12
    • Zheng, H.1    Ge, X.2    Gu, X.3
  • 13
    • 30944451248 scopus 로고    scopus 로고
    • A new method of simulating initial ground stress field in high slope
    • Chinese source
    • Jin Weiliang, Yu Junhua, Zou Daoqin. A new method of simulating initial ground stress field in high slope[J]. China Civil Engineering Journal, 2003, 36(10): 72-75. (in Chinese)
    • (2003) China Civil Engineering Journal , vol.36 , Issue.10 , pp. 72-75
    • Jin, W.1    Yu, J.2    Zou, D.3
  • 14
    • 25144489473 scopus 로고    scopus 로고
    • Reference documents of invite public bidding on principal part of building engineering of Longtan hydropower station (Engineering Geology)
    • Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation. Changsha: Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation, Chinese source
    • Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation. Reference documents of invite public bidding on principal part of building engineering of Longtan hydropower station (Engineering Geology)[R]. Changsha: Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation, 2001. (in Chinese)
    • (2001)
  • 17
    • 25144441639 scopus 로고
    • Compilation report of rock mechanics experimentation on Longtan hydropower station (Primary Design)
    • Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation. Changsha: Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation, Chinese source
    • Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation. Compilation report of rock mechanics experimentation on Longtan hydropower station (Primary Design)[R]. Changsha: Mid-South Design and Research Institute for Hydroelectric Projects, State Power Corporation, 1989. (in Chinese)
    • (1989)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.