메뉴 건너뛰기




Volumn 66, Issue 9, 2000, Pages 1371-1377

Optimal after-service strategy of the infrastructure equipment (1st report) - Establishment of the cost-optimized maintenance method of an elevator part

Author keywords

After service; BM; CBM; Elevator; Maintenance; Taguchi Methods; TBM

Indexed keywords


EID: 30844465741     PISSN: 09120289     EISSN: None     Source Type: Journal    
DOI: 10.2493/jjspe.66.1371     Document Type: Article
Times cited : (1)

References (10)
  • 3
    • 30844438836 scopus 로고    scopus 로고
    • Japanese source
  • 4
    • 30844470797 scopus 로고    scopus 로고
    • Japanese source
  • 5
    • 0027540073 scopus 로고
    • An Analysis of Taguchi's On-Line Quality-Monitoring Procedures for Attributes
    • M. R. Nayebpour and W. H. Woodall: An Analysis of Taguchi's On-Line Quality-Monitoring Procedures for Attributes, Technometrics, 35, 1, (1993) 53.
    • (1993) Technometrics , vol.35 , Issue.1 , pp. 53
    • Nayebpour, M.R.1    Woodall, W.H.2
  • 6
    • 30844470798 scopus 로고    scopus 로고
    • Japanese source
  • 7
    • 30844436035 scopus 로고    scopus 로고
    • Japanese source
  • 8
    • 0026915230 scopus 로고
    • A Model of Condition Monitoring of a Production Plant
    • A. H. Christer and W. Wang: A Model of Condition Monitoring of a Production Plant, Int. J. Prod. Res., 30, 9, (1992) 2199.
    • (1992) Int. J. Prod. Res. , vol.30 , Issue.9 , pp. 2199
    • Christer, A.H.1    Wang, W.2
  • 9
    • 30844469673 scopus 로고    scopus 로고
    • Japanese source
  • 10
    • 0024682424 scopus 로고
    • The Service Parts Control Problem
    • H. Yamashina: The Service Parts Control Problem, Eng. Costs and Prod. Economics, 16, 3, (1989) 195.
    • (1989) Eng. Costs and Prod. Economics , vol.16 , Issue.3 , pp. 195
    • Yamashina, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.