Volumn 44, Issue 4, 2006, Pages 715-728

Minimizing the total weighted completion time in a two-machine proportionate flow shop with different machine speeds

Author keywords

Machine speed; NP complete; Proportionate flow shop; Weighted shortest processing time; Worst case performance ratio

Indexed keywords

ASSEMBLY MACHINES; COMPUTATIONAL METHODS; HEURISTIC METHODS; PROBLEM SOLVING; SPEED;

EID: 30844462555     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540500268780     Document Type: Article
Times cited : (12)

References (17)
  • 2
    • 0000655780 scopus 로고
    • Generalized pairwise interchanges and machine scheduling
    • Croce, F.D., Generalized pairwise interchanges and machine scheduling. Eur. J. Oper, Res., 1995, 83, 310-319.
    • (1995) Eur. J. Oper, Res. , vol.83 , pp. 310-319
    • Croce, F.D.1
  • 4
    • 0035521426 scopus 로고    scopus 로고
    • Generating experimental data for computational testing with machine scheduling applications
    • Hall, N.G. and Postner, M.E., Generating experimental data for computational testing with machine scheduling applications. Op. Res., 2001, 49, 854-865.
    • (2001) Op. Res. , vol.49 , pp. 854-865
    • Hall, N.G.1    Postner, M.E.2
  • 5
    • 0033311145 scopus 로고    scopus 로고
    • Minimizing total completion time in a two-machine flowsop: Analysis of special cases
    • Hoogeveen, J.A. and Kawaguchi, T., Minimizing total completion time in a two-machine flowsop: analysis of special cases. Math. Oper. Res., 1999, 24, 887-910.
    • (1999) Math. Oper. Res. , vol.24 , pp. 887-910
    • Hoogeveen, J.A.1    Kawaguchi, T.2
  • 6
    • 0037402799 scopus 로고    scopus 로고
    • The three-machine proportionate flow shop problem with unequal machine speeds
    • Hou, S. and Hoogeveen, H., The three-machine proportionate flow shop problem with unequal machine speeds. Oper. Res. Lett., 2003, 31, 225-231.
    • (2003) Oper. Res. Lett. , vol.31 , pp. 225-231
    • Hou, S.1    Hoogeveen, H.2
  • 8
    • 0022093883 scopus 로고
    • Focused scheduling in proportionate flow shops
    • Ow, P.S., Focused scheduling in proportionate flow shops. Manag. Sci., 1985, 31, 851-869.
    • (1985) Manag. Sci. , vol.31 , pp. 851-869
    • Ow, P.S.1
  • 9
    • 0016993158 scopus 로고
    • An ordered flow shop sequencing problem with mean completion time criterion
    • Panwalkar, S.S. and Kahn, A.W., An ordered flow shop sequencing problem with mean completion time criterion. Int. J. Prod. Res., 1976, 14, 631-635.
    • (1976) Int. J. Prod. Res. , vol.14 , pp. 631-635
    • Panwalkar, S.S.1    Kahn, A.W.2
  • 11
    • 0042983554 scopus 로고    scopus 로고
    • Polynomial time approximation algorithms for machine scheduling: Ten open problems
    • Schuurman, P. and Woeginger, G.J., Polynomial time approximation algorithms for machine scheduling: ten open problems. J. Schedul., 1999, 2, 203-213.
    • (1999) J. Schedul. , vol.2 , pp. 203-213
    • Schuurman, P.1    Woeginger, G.J.2
  • 13
    • 0012775455 scopus 로고    scopus 로고
    • Minimizing total weighted completion time in a proportionate flow shop
    • Shakhlevich, N., Hoogeveen, H. and Pinedo, M., Minimizing total weighted completion time in a proportionate flow shop. J. Schedul., 1998, 1, 157-168.
    • (1998) J. Schedul. , vol.1 , pp. 157-168
    • Shakhlevich, N.1    Hoogeveen, H.2    Pinedo, M.3
  • 14
    • 0000660478 scopus 로고
    • Flowshop sequencing problem with ordered processing time matrices
    • Smith, M.L., Panwalkar, S.S. and Dudek, R.A., Flowshop sequencing problem with ordered processing time matrices. Manag. Sci., 1975, 21, 544-549.
    • (1975) Manag. Sci. , vol.21 , pp. 544-549
    • Smith, M.L.1    Panwalkar, S.S.2    Dudek, R.A.3
  • 15
    • 0017001721 scopus 로고
    • Flowshop sequencing problem with ordered processing time matrices: A general case
    • Smith, M.L., Panwalkar, S.S. and Dudek, R.A., Flowshop sequencing problem with ordered processing time matrices: a general case. Nav. Res. Log. Q., 1976, 23, 481-486.
    • (1976) Nav. Res. Log. Q. , vol.23 , pp. 481-486
    • Smith, M.L.1    Panwalkar, S.S.2    Dudek, R.A.3
  • 16
    • 0002906088 scopus 로고    scopus 로고
    • Some results of the worst-case analysis for flow shop scheduling
    • Smutnicki, C., Some results of the worst-case analysis for flow shop scheduling. Eur. J. Oper. Res., 1998, 109, 66-87.
    • (1998) Eur. J. Oper. Res. , vol.109 , pp. 66-87
    • Smutnicki, C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.