메뉴 건너뛰기




Volumn 11, Issue 11, 2005, Pages 1587-1592

Research on BOM transformation based on feature identification

Author keywords

Bill of material; Enterprise resource planning; Feature identification; Product data management

Indexed keywords

COMPUTER INTEGRATED MANUFACTURING; ELECTRONIC DOCUMENT IDENTIFICATION SYSTEMS; ENTERPRISE RESOURCE PLANNING; FEATURE EXTRACTION; INFORMATION ANALYSIS; MAPPING; MATHEMATICAL MODELS;

EID: 30544447041     PISSN: 10065911     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (6)

References (8)
  • 1
    • 0030205646 scopus 로고    scopus 로고
    • Restructuring the bill of material for productivity: A strategic evaluation of product configuration
    • STONEBRAKER P W. Restructuring the bill of material for productivity: a strategic evaluation of product configuration[J]. International of Production Economics, 1996, 45(1-3): 251-260.
    • (1996) International of Production Economics , vol.45 , Issue.1-3 , pp. 251-260
    • Stonebraker, P.W.1
  • 2
    • 30544447943 scopus 로고    scopus 로고
    • Integrating PDM with ERP
    • BREULS I. Integrating PDM with ERP[EB/OL]. http://www.baan.com/Integrating PDM with ERP By Pierre Breuls.htm, 2004-07-19.
    • (2004)
    • Breuls, I.1
  • 3
    • 30544436556 scopus 로고    scopus 로고
    • Chinese source, Beijing: Publishing House of Electronics Industry
    • CHEN Qishen. ERP-step forward from internal integration[M]. Beijing. Publishing House of Electronics Industry, 2004 (in Chinese).
    • (2004) ERP - Step Forward from Internal Integration
    • Chen, Q.1
  • 4
    • 30544442185 scopus 로고    scopus 로고
    • Construction of assembly BOM for integration of PDM and MRP II
    • Chinese source
    • LU Huaijing, YU Dingwen, ZHANG Yufeng. Construction of assembly BOM for integration of PDM and MRP II[J]. Machine Design and Manufacturing Engineering, 2002, 31(1): 34-36 (in Chinese).
    • (2002) Machine Design and Manufacturing Engineering , vol.31 , Issue.1 , pp. 34-36
    • Lu, H.1    Yu, D.2    Zhang, Y.3
  • 5
    • 24344441385 scopus 로고    scopus 로고
    • Research on xBOM for product whole life cycle
    • Chinese source
    • LIU Xiaobing, HUANG Xuewen, MA Yue, et al. Research on xBOM for product whole life cycle[J]. Computer Integrated Manufacturing Systems, 2002, 8(12): 983-987 (in Chinese).
    • (2002) Computer Integrated Manufacturing Systems , vol.8 , Issue.12 , pp. 983-987
    • Liu, X.1    Huang, X.2    Ma, Y.3
  • 6
    • 0037464687 scopus 로고    scopus 로고
    • The method of drawing network graph based on BOM/BOP
    • Chinese source
    • ZHAN Dechen, WANG Zhongjie, LI Xiaoping, et al. The method of drawing network graph based on BOM/BOP[J]. China Mechanical Engineering, 2003, 14(1): 120-125 (in Chinese).
    • (2003) China Mechanical Engineering , vol.14 , Issue.1 , pp. 120-125
    • Zhan, D.1    Wang, Z.2    Li, X.3
  • 7
    • 30544433422 scopus 로고
    • Chinese source, Beijing: Tsinghua University Press
    • GENG Suyun, QU Wanting, ZHANG Li'ang. Discrete mathematics[M]. Beijing: Tsinghua University Press, 1992 (in Chinese).
    • (1992) Discrete Mathematics
    • Geng, S.1    Qu, W.2    Zhang, L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.