메뉴 건너뛰기




Volumn 18, Issue 8, 2005, Pages 702-709

Critical-path-analysis-based dynamic component supplier optimization

Author keywords

Component supplier optimization; Critical path analysis; Dynamic collaboration

Indexed keywords

ALGORITHMS; COMPUTER INTEGRATED MANUFACTURING; FUZZY SETS; MARKETING; OPTIMIZATION; PRODUCT DEVELOPMENT;

EID: 29744432641     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/09511920500324290     Document Type: Article
Times cited : (5)

References (23)
  • 1
    • 0031076123 scopus 로고    scopus 로고
    • Note on minimizing the weighted sum of tardy and early completion penalties in a single machine: A case of small common due date
    • Alidaee, B. and Dragan, I., Note on minimizing the weighted sum of tardy and early completion penalties in a single machine: a case of small common due date. Eur. J. Op. Rex., 1997, 96, 559-563.
    • (1997) Eur. J. Op. Rex. , vol.96 , pp. 559-563
    • Alidaee, B.1    Dragan, I.2
  • 2
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties. A review
    • Baker, K.R. and Scudder, G.D., Sequencing with earliness and tardiness penalties. A review. Ops Res., 1990, 38, 22-36.
    • (1990) Ops Res. , vol.38 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 3
    • 0002087984 scopus 로고    scopus 로고
    • Design and implementation of a collaborative engineering information system for allied concurrent engineering
    • Chen, Y.M. and Liang, M.W., Design and implementation of a collaborative engineering information system for allied concurrent engineering. Int. J. Computer Integ. Mfg, 2000, 13, 11-30.
    • (2000) Int. J. Computer Integ. Mfg , vol.13 , pp. 11-30
    • Chen, Y.M.1    Liang, M.W.2
  • 4
    • 0030288205 scopus 로고    scopus 로고
    • An exploration of supplier selection practices across the supply chain
    • Choi, T.Y. and Hartley, H.L., An exploration of supplier selection practices across the supply chain. J. Op. Mgmt, 1996, 14, 333-343.
    • (1996) J. Op. Mgmt , vol.14 , pp. 333-343
    • Choi, T.Y.1    Hartley, H.L.2
  • 8
    • 0032156562 scopus 로고    scopus 로고
    • A decision support system for supplier selection using an integrated analytic hierarchy process and linear programming
    • Ghodspour, S.H. and Brien, C.O., A decision support system for supplier selection using an integrated analytic hierarchy process and linear programming. Int. J. Prod. Econ., 1998, 56-57, 199-212.
    • (1998) Int. J. Prod. Econ. , vol.56-57 , pp. 199-212
    • Ghodspour, S.H.1    Brien, C.O.2
  • 9
    • 0036567963 scopus 로고    scopus 로고
    • A goal programming model for partner selection decisions in international joint ventures
    • Hajidimitrious, Y.A. and Georgiou, A.C., A goal programming model for partner selection decisions in international joint ventures. Eur. J. Op. Res., 2002, 138, 649-662.
    • (2002) Eur. J. Op. Res. , vol.138 , pp. 649-662
    • Hajidimitrious, Y.A.1    Georgiou, A.C.2
  • 11
    • 0033752188 scopus 로고    scopus 로고
    • A web-based framework to support early supplier involvement in new product development
    • Huang, G.Q. and Mak, K.L., A web-based framework to support early supplier involvement in new product development. Robotics Computer Integ. Mfg, 2000, 16, 169-179.
    • (2000) Robotics Computer Integ. Mfg , vol.16 , pp. 169-179
    • Huang, G.Q.1    Mak, K.L.2
  • 12
    • 2542419300 scopus 로고    scopus 로고
    • A two-stage manufacturing partner selection framework for virtual enterprises
    • Huang, X.G., Wong, Y.S. and Wang, J.G., A two-stage manufacturing partner selection framework for virtual enterprises. Int. J. Computer Integ. Mfg, 2004, 17, 294-304.
    • (2004) Int. J. Computer Integ. Mfg , vol.17 , pp. 294-304
    • Huang, X.G.1    Wong, Y.S.2    Wang, J.G.3
  • 13
    • 0001620447 scopus 로고
    • Critical path planning and scheduling, mathematical basis
    • Kelly, J.E.J.. Critical path planning and scheduling, mathematical basis. Op. Res., 1961, 9, 296-320.
    • (1961) Op. Res. , vol.9 , pp. 296-320
    • Kelly, J.E.J.1
  • 14
    • 0034322544 scopus 로고    scopus 로고
    • Decision supporting functionality in a virtual enterprise network
    • Lau, H.C.W., Chin, K.S., Pun, K.F. and Ning, A., Decision supporting functionality in a virtual enterprise network. Expert Systems Applic., 2000, 19, 261-270.
    • (2000) Expert Systems Applic. , vol.19 , pp. 261-270
    • Lau, H.C.W.1    Chin, K.S.2    Pun, K.F.3    Ning, A.4
  • 15
    • 0242666708 scopus 로고    scopus 로고
    • Partner selection and information infrastructure of a virtual enterprise network
    • Lau, H.C.W. and Wong, E., Partner selection and information infrastructure of a virtual enterprise network. Int. J. Computer Integ. Mfg, 2001, 14, 186-193.
    • (2001) Int. J. Computer Integ. Mfg , vol.14 , pp. 186-193
    • Lau, H.C.W.1    Wong, E.2
  • 16
    • 29744438342 scopus 로고
    • Reliability maturity index (RMI) - An extension of PERT into reliability management
    • Malcolm, D.G., Reliability maturity index (RMI) - an extension of PERT into reliability management. J.Ind. Engng, 1963, 14, 3-12.
    • (1963) J.Ind. Engng , vol.14 , pp. 3-12
    • Malcolm, D.G.1
  • 21
    • 0032630723 scopus 로고    scopus 로고
    • A framework for designing efficient value chain networks
    • Talluri, S., Baker, R.C. and Sarkis, J., A framework for designing efficient value chain networks. Int. J. Prod. Econ., 1999, 62, 133-144.
    • (1999) Int. J. Prod. Econ. , vol.62 , pp. 133-144
    • Talluri, S.1    Baker, R.C.2    Sarkis, J.3
  • 22
    • 0036165350 scopus 로고    scopus 로고
    • Concurrent process planning and scheduling in distributed virtual manufacturing
    • Wu, S.H., Fuh, J.Y.H. and Nee, A.Y.C., Concurrent process planning and scheduling in distributed virtual manufacturing. IIE Trans., 2002, 34, 77-89.
    • (2002) IIE Trans. , vol.34 , pp. 77-89
    • Wu, S.H.1    Fuh, J.Y.H.2    Nee, A.Y.C.3
  • 23
    • 0026158109 scopus 로고
    • Algorithms for a class of single-machine weighted tardiness and earliness problems
    • Yano, C.A. and Kim, Y.-D., Algorithms for a class of single-machine weighted tardiness and earliness problems. Eur. J. Op. Res., 1991, 52, 167-178.
    • (1991) Eur. J. Op. Res. , vol.52 , pp. 167-178
    • Yano, C.A.1    Kim, Y.-D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.