-
1
-
-
0022667867
-
Optimal control of production rate in a failure prone manufacturing system
-
Akella, R. and Kumar, P.R., Optimal control of production rate in a failure prone manufacturing system. IEEE Trans. Autom. Control, 1986, AC-31, 116-126.
-
(1986)
IEEE Trans. Autom. Control
, vol.AC-31
, pp. 116-126
-
-
Akella, R.1
Kumar, P.R.2
-
2
-
-
0024037430
-
Optimality of zero inventory policies for unreliable manufacturing systems
-
Bielecki, T. and Kumar, P.R., Optimality of zero inventory policies for unreliable manufacturing systems. Int, J. Oper. Res., 1988, 36, 532-541.
-
(1988)
Int, J. Oper. Res.
, vol.36
, pp. 532-541
-
-
Bielecki, T.1
Kumar, P.R.2
-
4
-
-
0036646995
-
Optimal threshold control in discrete failure-prone manufacturing system
-
Feng, Y. and Xiao, B., Optimal threshold control in discrete failure-prone manufacturing system. IEEE Trans. Autom. Control, 2002, 47, 1167-1174.
-
(2002)
IEEE Trans. Autom. Control
, vol.47
, pp. 1167-1174
-
-
Feng, Y.1
Xiao, B.2
-
5
-
-
3743055741
-
Short-term production scheduling of an automated manufacturing facility
-
Gershwin, S.B., Akella, R. and Choong, Y., Short-term production scheduling of an automated manufacturing facility. In Massachusetts Institute of Technology Laboratory for Information and Decision Systems Report, LIDS-FR-1356, 1984.
-
(1984)
Massachusetts Institute of Technology Laboratory for Information and Decision Systems Report
, vol.LIDS-FR-1356
-
-
Gershwin, S.B.1
Akella, R.2
Choong, Y.3
-
6
-
-
0041417619
-
Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems
-
Gharbi, A. and Kenne, J.P., Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems. IIE Trans., 2003, 35, 941-952.
-
(2003)
IIE Trans.
, vol.35
, pp. 941-952
-
-
Gharbi, A.1
Kenne, J.P.2
-
7
-
-
0035481909
-
A simulation optimization approach in production of failure prone manufacturing systems
-
Kenne, J.P. and Gharbi, A., A simulation optimization approach in production of failure prone manufacturing systems. J. Intell. Manuf., 2001, 12, 421-431.
-
(2001)
J. Intell. Manuf.
, vol.12
, pp. 421-431
-
-
Kenne, J.P.1
Gharbi, A.2
-
9
-
-
9444266436
-
A decision analysis model for maintenance policy selection using a CMMS
-
Labib, A.W., A decision analysis model for maintenance policy selection using a CMMS. J. Qual. Mainten. Eng., 2004, 10, 191-202.
-
(2004)
J. Qual. Mainten. Eng.
, vol.10
, pp. 191-202
-
-
Labib, A.W.1
-
10
-
-
0032121547
-
An intelligent maintenance model (system): An application of analytic hierarchy process and a fuzzy logic rule-based controller
-
Labib, A.W., Williams, G.B. and O'Connor, R.F., An intelligent maintenance model (system): an application of analytic hierarchy process and a fuzzy logic rule-based controller. J. Oper. Res. Soc., 1998, 49, 745-757.
-
(1998)
J. Oper. Res. Soc.
, vol.49
, pp. 745-757
-
-
Labib, A.W.1
Williams, G.B.2
O'Connor, R.F.3
-
11
-
-
4043107770
-
Optimal control of failure prone manufacturing systems with constant repair times
-
Perkins, J.R., Optimal control of failure prone manufacturing systems with constant repair times. Ann. Oper. Res., 2004, 125, 233-261.
-
(2004)
Ann. Oper. Res.
, vol.125
, pp. 233-261
-
-
Perkins, J.R.1
-
12
-
-
0024048635
-
Production control of a manufacturing systems with multiple machine states
-
Sharifnia, A., Production control of a manufacturing systems with multiple machine states. IEEE Trans. Autom. Control, 1988, AC-33, 620-625.
-
(1988)
IEEE Trans. Autom. Control
, vol.AC-33
, pp. 620-625
-
-
Sharifnia, A.1
-
14
-
-
31744439299
-
Optimal control system of an unreliable machine using fuzzy logic control: From design to implementation
-
in press a
-
Yuniarto, M.N. and Labib, A.W., Optimal control system of an unreliable machine using fuzzy logic control: from design to implementation. Int. J. Prod. Res. (in press a).
-
Int. J. Prod. Res.
-
-
Yuniarto, M.N.1
Labib, A.W.2
|