-
1
-
-
0027617410
-
Scheduling with alternative operations
-
J. Ahn, W. He and A. Kusiak, "Scheduling with alternative operations", IEEE Transactions on Robotics and Automation, 9, pp. 297-303, 1993.
-
(1993)
IEEE Transactions on Robotics and Automation
, vol.9
, pp. 297-303
-
-
Ahn, J.1
He, W.2
Kusiak, A.3
-
2
-
-
0037061463
-
A heuristic for job shop scheduling to minimise total weighted tardiness
-
M. Asano and H. Ohta, "A heuristic for job shop scheduling to minimise total weighted tardiness", Computers and Industrial Engineering, 42, pp. 137-147, 2002.
-
(2002)
Computers and Industrial Engineering
, vol.42
, pp. 137-147
-
-
Asano, M.1
Ohta, H.2
-
3
-
-
0024765468
-
A bottleneck-based beam search for job scheduling in a flexible manufacturing system
-
Y.L. Chang, H. Matsuo and R. Sullivan, "A bottleneck-based beam search for job scheduling in a flexible manufacturing system", International Journal of Production Research, 27, pp. 1949-1961, 1989.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 1949-1961
-
-
Chang, Y.L.1
Matsuo, H.2
Sullivan, R.3
-
4
-
-
0032096682
-
A note on scheduling alternative operations in two-machine flowshops
-
T.C.E. Cheng and G. Wang, "A note on scheduling alternative operations in two-machine flowshops", Journal of the Operational Research Society, 49, pp. 670-673, 1998.
-
(1998)
Journal of the Operational Research Society
, vol.49
, pp. 670-673
-
-
Cheng, T.C.E.1
Wang, G.2
-
6
-
-
0000965956
-
Heuristics in job shop scheduling
-
W.S. Gere, "Heuristics in job shop scheduling", Management Science, 13, pp. 167-190, 1996.
-
(1996)
Management Science
, vol.13
, pp. 167-190
-
-
Gere, W.S.1
-
8
-
-
0036027960
-
Local search heuristics for two-stage flow shop problems with secondary criterion
-
J.N.D. Gupta, K. Hennig and F. Werner, "Local search heuristics for two-stage flow shop problems with secondary criterion", Computers & Operations Research, 29, pp. 123-149, 2002.
-
(2002)
Computers & Operations Research
, vol.29
, pp. 123-149
-
-
Gupta, J.N.D.1
Hennig, K.2
Werner, F.3
-
9
-
-
0021589791
-
Using a CATS database for alternative machine loading
-
S.L. Hankins, R.A. Wysk and K.R. Fox, "Using a CATS database for alternative machine loading", Journal of Manufacturing Systems, 13, pp. 115-120, 1984.
-
(1984)
Journal of Manufacturing Systems
, vol.13
, pp. 115-120
-
-
Hankins, S.L.1
Wysk, R.A.2
Fox, K.R.3
-
10
-
-
0012473394
-
Optimisation of selection of machine-tool, loading sequence of parts and machining conditions in job-shop type machining systems
-
K. Iwata, Y. Murotsu and F. Oba, "Optimisation of selection of machine-tool, loading sequence of parts and machining conditions in job-shop type machining systems", Annals of the CIRP, 27, pp. 447-451, 1978.
-
(1978)
Annals of the CIRP
, vol.27
, pp. 447-451
-
-
Iwata, K.1
Murotsu, Y.2
Oba, F.3
-
11
-
-
0019145498
-
Solution of large-scale scheduling problems for job-shop type machining systems with alternative machine tools
-
K. Iwata, Y. Murotsu and F. Oba, "Solution of large-scale scheduling problems for job-shop type machining systems with alternative machine tools", Annals of the CIRP, 29, pp. 335-338, 1980.
-
(1980)
Annals of the CIRP
, vol.29
, pp. 335-338
-
-
Iwata, K.1
Murotsu, Y.2
Oba, F.3
-
12
-
-
0025430088
-
A comparison of dispatching rules for job shops with multiple identical jobs and alternative routings
-
Y. Kim, "A comparison of dispatching rules for job shops with multiple identical jobs and alternative routings", International Journal of Production Research, 28, pp. 953-962, 1990.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 953-962
-
-
Kim, Y.1
-
13
-
-
0346461748
-
On the complexity and some properties of multi-stage scheduling problems with earliness and tardiness penalties
-
V. Lauff and F. Werner, "On the complexity and some properties of multi-stage scheduling problems with earliness and tardiness penalties", Computers & Operations Research, 31, pp. 317-345, 2004.
-
(2004)
Computers & Operations Research
, vol.31
, pp. 317-345
-
-
Lauff, V.1
Werner, F.2
-
14
-
-
0024031525
-
Concurrent routing, sequencing, and setups for a two-machine flexible manufacturing cell
-
E.J. Lee and P.B. Mirchandani, "Concurrent routing, sequencing, and setups for a two-machine flexible manufacturing cell", IEEE Transactions on Robotics and Automation, 4, pp. 256-264, 1988.
-
(1988)
IEEE Transactions on Robotics and Automation
, vol.4
, pp. 256-264
-
-
Lee, E.J.1
Mirchandani, P.B.2
-
15
-
-
77951139709
-
Complexity of machine scheduling problems
-
J.K. Lenstra, A.H.G. Rinnooy Kan and P. Brucker, "Complexity of machine scheduling problems", Annals of Discrete Mathematics, 1, pp. 343-362, 1977.
-
(1977)
Annals of Discrete Mathematics
, vol.1
, pp. 343-362
-
-
Lenstra, J.K.1
Rinnooy Kan, A.H.G.2
Brucker, P.3
-
16
-
-
0029277066
-
Flow-shop scheduling with flexible processors
-
C. Liao, C. Sun and W. You, "Flow-shop scheduling with flexible processors", Computers & Operations Research, 22, pp. 297-306, 1995.
-
(1995)
Computers & Operations Research
, vol.22
, pp. 297-306
-
-
Liao, C.1
Sun, C.2
You, W.3
-
17
-
-
0742319169
-
An efficient genetic algorithm for job shop scheduling with tardiness objectives
-
D.C. Mattfeld and C. Bierwirth, "An efficient genetic algorithm for job shop scheduling with tardiness objectives", European Journal of Operational Research, 155, pp. 616-630, 2004.
-
(2004)
European Journal of Operational Research
, vol.155
, pp. 616-630
-
-
Mattfeld, D.C.1
Bierwirth, C.2
-
19
-
-
0031144678
-
Scheduling alternative operations in two-machine flow-shops
-
C.H. Pan and J.S. Chen, "Scheduling alternative operations in two-machine flow-shops", Journal of the Operational Research Society, 48, pp. 533-540, 1997.
-
(1997)
Journal of the Operational Research Society
, vol.48
, pp. 533-540
-
-
Pan, C.H.1
Chen, J.S.2
-
20
-
-
0036604748
-
Minimising tardiness in a two-machine flow-shop
-
J.C.H. Pan, J.S. Chen and C.M. Chao, "Minimising tardiness in a two-machine flow-shop", Computers & Operations Research, 29, pp. 869-885, 2002.
-
(2002)
Computers & Operations Research
, vol.29
, pp. 869-885
-
-
Pan, J.C.H.1
Chen, J.S.2
Chao, C.M.3
-
21
-
-
0032043112
-
"Scheduling to minimise mean tardiness and weighted mean tardiness in flowshop and flowline-based manufacturing cell"
-
S. Parthasarathy and C. Rajendran, "Scheduling to minimise mean tardiness and weighted mean tardiness in flowshop and flowline-based manufacturing cell", Computers & Industrial Engineering, 34, pp. 531-546, 1998.
-
(1998)
Computers & Industrial Engineering
, vol.34
, pp. 531-546
-
-
Parthasarathy, S.1
Rajendran, C.2
-
25
-
-
0021898921
-
Effectiveness of alternate operations in a flexible manufacturing system
-
W.E. Wilhelm and H. Shin, "Effectiveness of alternate operations in a flexible manufacturing system", International Journal of Production Research, 23, pp. 65-79, 1985.
-
(1985)
International Journal of Production Research
, vol.23
, pp. 65-79
-
-
Wilhelm, W.E.1
Shin, H.2
|