메뉴 건너뛰기




Volumn 28, Issue 1, 2006, Pages 127-149

Bullwhip and inventory variance in a closed loop supply chain

Author keywords

Bullwhip; Inventory variance; Lead time; Manufacturing; Remanufacturing; Return rate

Indexed keywords


EID: 28844454999     PISSN: 01716468     EISSN: 14366304     Source Type: Journal    
DOI: 10.1007/s00291-005-0009-0     Document Type: Article
Times cited : (97)

References (43)
  • 2
    • 28844474326 scopus 로고    scopus 로고
    • Analysis of R out of N systems with several repairmen, exponential life times and phase type repair times: An algorithmic approach
    • forthcoming
    • Barron Y, Frostig E, Levikson B (2004) Analysis of R out of N systems with several repairmen, exponential life times and phase type repair times: an algorithmic approach. Eur J Oper Res (forthcoming); available online at http://www.sciencedirect.com
    • (2004) Eur J Oper Res
    • Barron, Y.1    Frostig, E.2    Levikson, B.3
  • 3
    • 0033872695 scopus 로고    scopus 로고
    • Quantifying the Bullwhip effect in a simple supply chain: The impact of forecasting, lead-times and information
    • Chen YF, Drezner Z, Ryan JK, Simchi-Levi D (2000) Quantifying the Bullwhip effect in a simple supply chain: the impact of forecasting, lead-times and information. Manage Sci 46:436-443
    • (2000) Manage Sci , vol.46 , pp. 436-443
    • Chen, Y.F.1    Drezner, Z.2    Ryan, J.K.3    Simchi-Levi, D.4
  • 5
    • 0037449229 scopus 로고    scopus 로고
    • Measuring and avoiding the bullwhip effect: A control theoretic approach
    • Dejonckheere J, Disney SM, Lambrecht MR, Towill DR (2003) Measuring and avoiding the bullwhip effect: a control theoretic approach. Eur J Oper Res 47(3):567-590
    • (2003) Eur J Oper Res , vol.47 , Issue.3 , pp. 567-590
    • Dejonckheere, J.1    Disney, S.M.2    Lambrecht, M.R.3    Towill, D.R.4
  • 7
    • 0037849864 scopus 로고    scopus 로고
    • On the bullwhip and inventory variance produced by an ordering policy
    • Disney SM, Towill DR (2003) On the bullwhip and inventory variance produced by an ordering policy. OMEGA: Int J Manag Sci 31(3):157-167
    • (2003) OMEGA: Int J Manag Sci , vol.31 , Issue.3 , pp. 157-167
    • Disney, S.M.1    Towill, D.R.2
  • 8
    • 2942685603 scopus 로고    scopus 로고
    • Variance amplification and the golden ratio in production and inventory control
    • Disney SM, Towill DR, Van de Velde W (2004) Variance amplification and the golden ratio in production and inventory control. Int J Prod Econ 90(3):295-309
    • (2004) Int J Prod Econ , vol.90 , Issue.3 , pp. 295-309
    • Disney, S.M.1    Towill, D.R.2    Van De Velde, W.3
  • 9
    • 0042090654 scopus 로고    scopus 로고
    • On optimal inventory control with independent stochastic item returns
    • Fleischmann M, Kuik R (2003) On optimal inventory control with independent stochastic item returns. Eur J Oper Res 151:25-37
    • (2003) Eur J Oper Res , vol.151 , pp. 25-37
    • Fleischmann, M.1    Kuik, R.2
  • 11
    • 0033738099 scopus 로고    scopus 로고
    • Production planning and control for remanufecturing: Industry practice and research needs
    • Guide VDR Jr (2000) Production planning and control for remanufecturing: industry practice and research needs, J Oper Manag 18:467-483
    • (2000) J Oper Manag , vol.18 , pp. 467-483
    • Guide Jr., V.D.R.1
  • 12
    • 0035815822 scopus 로고    scopus 로고
    • Lead-time effects and policy improvement for stochastic inventory control with remanufacturing
    • Iderfurth K, van der Laan E (2001) Lead-time effects and policy improvement for stochastic inventory control with remanufacturing. Int J Prod Econ 71:381-390
    • (2001) Int J Prod Econ , vol.71 , pp. 381-390
    • Iderfurth, K.1    Van Der Laan, E.2
  • 13
    • 0000016519 scopus 로고
    • Dynamic analysis of a WIP compensated decision support system
    • John S, Naim MM, Towill DR (1994) Dynamic analysis of a WIP compensated decision support system. Int J Manuf Syst Des 1(4):283-297
    • (1994) Int J Manuf Syst des , vol.1 , Issue.4 , pp. 283-297
    • John, S.1    Naim, M.M.2    Towill, D.R.3
  • 14
    • 0037449040 scopus 로고    scopus 로고
    • A new approach for controlling a hybrid stochastic manufacturing/ remanufacturing system with inventories and different lead-times
    • Kiesmüller GP (2003) A new approach for controlling a hybrid stochastic manufacturing/ remanufacturing system with inventories and different lead-times, Eur J Oper Res 147:62-71
    • (2003) Eur J Oper Res , vol.147 , pp. 62-71
    • Kiesmüller, G.P.1
  • 15
    • 0035973362 scopus 로고    scopus 로고
    • An inventory model with dependent product demands and returns
    • Kiesmüller GP, van der Laan EA (2001) An inventory model with dependent product demands and returns. Int J Prod Econ 72:73-87
    • (2001) Int J Prod Econ , vol.72 , pp. 73-87
    • Kiesmüller, G.P.1    Van Der Laan, E.A.2
  • 16
    • 0037151824 scopus 로고    scopus 로고
    • A continuous time inventory model for a product recovery system with multiple options
    • Kleber R, Minner S, Kiesmüller G (2002) A continuous time inventory model for a product recovery system with multiple options. Int J Prod Econ 79:121-141
    • (2002) Int J Prod Econ , vol.79 , pp. 121-141
    • Kleber, R.1    Minner, S.2    Kiesmüller, G.3
  • 17
    • 0037962814 scopus 로고    scopus 로고
    • Reversibility and disassembly time of part connection
    • Kondo Y, Deguchi K, Hayashi Y (2003) Reversibility and disassembly time of part connection. Resour Conserv Recycl 38:175-184
    • (2003) Resour Conserv Recycl , vol.38 , pp. 175-184
    • Kondo, Y.1    Deguchi, K.2    Hayashi, Y.3
  • 19
    • 50949087630 scopus 로고    scopus 로고
    • Determining a common production cycle time for an economic lot scheduling problem with deteriorating items
    • forthcoming
    • Lin GC, Kroll DE, Lin CJ (2005) Determining a common production cycle time for an economic lot scheduling problem with deteriorating items. Eur J Oper Res (forthcoming); available online at http://www.sciencedirect.com
    • (2005) Eur J Oper Res
    • Lin, G.C.1    Kroll, D.E.2    Lin, C.J.3
  • 21
    • 0042283595 scopus 로고    scopus 로고
    • Periodic review, push inventory policies for remanufacturing
    • Mahadevan B, Pyke DF, Fleischmann M (2003) Periodic review, push inventory policies for remanufacturing. Eur J Oper Res 151(3):536-551
    • (2003) Eur J Oper Res , vol.151 , Issue.3 , pp. 536-551
    • Mahadevan, B.1    Pyke, D.F.2    Fleischmann, M.3
  • 22
    • 0000192839 scopus 로고
    • An analysis of single item inventory systems with returns
    • Muckstadt J, Isaac MH (1981) An analysis of single item inventory systems with returns. Nav Res Logist Q 28:237-254
    • (1981) Nav Res Logist Q , vol.28 , pp. 237-254
    • Muckstadt, J.1    Isaac, M.H.2
  • 25
    • 4444279225 scopus 로고    scopus 로고
    • Managing product recovery operations: The case of automotive engine remanufacturing
    • Como Lake, Italy, 16-18 June
    • Seitz MA, Disney SM, Naim MM (2003) Managing product recovery operations: the case of automotive engine remanufacturing. EUROMA POMS Conference, Como Lake, Italy, 16-18 June, Vol 2, pp 1045-1053
    • (2003) EUROMA POMS Conference , vol.2 , pp. 1045-1053
    • Seitz, M.A.1    Disney, S.M.2    Naim, M.M.3
  • 26
    • 0001412093 scopus 로고
    • On the application of servomechanism theory to the study of production control
    • Simon HA (1952) On the application of servomechanism theory to the study of production control. Econometrica 20:247-268
    • (1952) Econometrica , vol.20 , pp. 247-268
    • Simon, H.A.1
  • 27
    • 0000361362 scopus 로고
    • Modelling managerial behaviour: Misperceptions of feedback in a dynamic decision making experiment
    • Sterman J (1989) Modelling managerial behaviour: misperceptions of feedback in a dynamic decision making experiment. Manage Sci 35(3):321-339
    • (1989) Manage Sci , vol.35 , Issue.3 , pp. 321-339
    • Sterman, J.1
  • 28
    • 5144220494 scopus 로고    scopus 로고
    • The impact of information transparency on the dynamic behaviour of a hybrid manufacturing/remanufecturing system
    • Tang O, Naim MM (2004) The impact of information transparency on the dynamic behaviour of a hybrid manufacturing/remanufecturing system. Int J Prod Res 42(19):4135-4152
    • (2004) Int J Prod Res , vol.42 , Issue.19 , pp. 4135-4152
    • Tang, O.1    Naim, M.M.2
  • 29
    • 0037050705 scopus 로고    scopus 로고
    • On the necessity of a disposal option for returned items that can be remanufactured
    • Teunter RH, Vlachos D (2002) On the necessity of a disposal option for returned items that can be remanufactured. Int J Prod Econ 75:257-266
    • (2002) Int J Prod Econ , vol.75 , pp. 257-266
    • Teunter, R.H.1    Vlachos, D.2
  • 33
    • 0020203589 scopus 로고
    • Dynamic analysis of an inventory and order based production control system
    • Towill DR (1982b) Dynamic analysis of an inventory and order based production control system. Int J Prod Res 20:369-383
    • (1982) Int J Prod Res , vol.20 , pp. 369-383
    • Towill, D.R.1
  • 35
    • 0037431638 scopus 로고    scopus 로고
    • An NPV and AC analysis of a stochastic inventory system with joint manufacturing and remanufacturing
    • van der Laan E (2003) An NPV and AC analysis of a stochastic inventory system with joint manufacturing and remanufacturing. Int J Prod Econ 81-82:317-331
    • (2003) Int J Prod Econ , vol.81-82 , pp. 317-331
    • Van Der Laan, E.1
  • 36
    • 0345253867 scopus 로고    scopus 로고
    • An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control strategies
    • van der Laan E, Salomon M, Dekker R (1999a) An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control strategies. Eur J Oper Res 115:195-214
    • (1999) Eur J Oper Res , vol.115 , pp. 195-214
    • Van Der Laan, E.1    Salomon, M.2    Dekker, R.3
  • 39
    • 2642586388 scopus 로고    scopus 로고
    • The impact of a free-repair warranty policy on EMQ model for imperfect production systems
    • Wang CH (2004) The impact of a free-repair warranty policy on EMQ model for imperfect production systems. Comput Oper Res 31:2021-2035
    • (2004) Comput Oper Res , vol.31 , pp. 2021-2035
    • Wang, C.H.1
  • 43
    • 28844469538 scopus 로고    scopus 로고
    • Dynamic performance of a hybrid inventory system with a Kanban policy in remanufacturing process
    • (forthcoming); available online on 5 March 2005
    • Zhou L, Naim MM, Tang O, Towill DR (2005) Dynamic performance of a hybrid inventory system with a Kanban policy in remanufacturing process. OMEGA: Int J Manag Sci (forthcoming); available online on 5 March 2005
    • (2005) OMEGA: Int J Manag Sci
    • Zhou, L.1    Naim, M.M.2    Tang, O.3    Towill, D.R.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.