메뉴 건너뛰기




Volumn 37, Issue 12, 2005, Pages 1093-1105

Capacity-driven acceptance of customer orders for a multi-stage batch manufacturing system: Models and algorithms

Author keywords

[No Author keywords available]

Indexed keywords

AUTOMOBILE MANUFACTURE; COMPUTATIONAL COMPLEXITY; GENETIC ALGORITHMS; HEURISTIC METHODS; INDUSTRIAL ENGINEERING; INTEGER PROGRAMMING; LINEAR PROGRAMMING; MATHEMATICAL MODELS; SIMULATED ANNEALING;

EID: 28144437544     PISSN: 0740817X     EISSN: None     Source Type: Journal    
DOI: 10.1080/07408170500288042     Document Type: Article
Times cited : (42)

References (36)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams, J. and Balas, E. and Zawack, D. (1988) The shifting bottleneck procedure for job shop scheduling Management Science, 34, pp. 391-401.
    • (1988) Management Science , vol.34 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 2
    • 0030243710 scopus 로고    scopus 로고
    • Overtime scheduling: An application in finite capacity real time scheduling
    • Akkan, C. (1996) Overtime scheduling: An application in finite capacity real time scheduling Journal of the Operational Research Society, 47, pp. 1137-1149.
    • (1996) Journal of the Operational Research Society , vol.47 , pp. 1137-1149
    • Akkan, C.1
  • 6
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng, T.C.E. and Gupta, M.C. (1989) Survey of scheduling research involving due date determination decisions European Journal of Operations Research, 38, pp. 156-166.
    • (1989) European Journal of Operations Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 9
    • 0001131108 scopus 로고
    • Single facility due date setting with multiple customer classes
    • Duenyas, I. (1995) Single facility due date setting with multiple customer classes Management Science, 41, pp. 608-619.
    • (1995) Management Science , vol.41 , pp. 608-619
    • Duenyas, I.1
  • 10
  • 11
    • 0030241634 scopus 로고    scopus 로고
    • Finite capacity scheduling systems: Performance issues and comparisons
    • Enns, S.T. (1996) Finite capacity scheduling systems: Performance issues and comparisons Computers&Industrial Engineering, 30, pp. 727-739.
    • (1996) Computers & Industrial Engineering , vol.30 , pp. 727-739
    • Enns, S.T.1
  • 12
    • 0000728790 scopus 로고    scopus 로고
    • Lead time selection and the behaviour of work flow in job shops
    • Enns, S.T. (1998) Lead time selection and the behaviour of work flow in job shops European Journal of Operational Research, 109, pp. 122-136.
    • (1998) European Journal of Operational Research , vol.109 , pp. 122-136
    • Enns, S.T.1
  • 13
    • 0015991935 scopus 로고
    • Co-ordinating aggregate and detailed scheduling decisions in the one machine job shop: Part I theory
    • Gelders, L. and Kleindorfer, P.R. (1974) Co-ordinating aggregate and detailed scheduling decisions in the one machine job shop: Part I theory Operations Research, 22, pp. 46-60.
    • (1974) Operations Research , vol.22 , pp. 46-60
    • Gelders, L.1    Kleindorfer, P.R.2
  • 14
    • 0016485364 scopus 로고
    • Co-ordinating aggregate and detailed scheduling decisions in the one machine job shop: Part II computation and structure
    • Gelders, L. and Kleindorfer, P.R. (1975) Co-ordinating aggregate and detailed scheduling decisions in the one machine job shop: Part II computation and structure Operations Research, 23, pp. 312-324.
    • (1975) Operations Research , vol.23 , pp. 312-324
    • Gelders, L.1    Kleindorfer, P.R.2
  • 16
    • 27944441056 scopus 로고    scopus 로고
    • Introducing APS: Getting production in lock step with customer demand
    • Gould, L.S. (1998) Introducing APS: Getting production in lock step with customer demand Automotive Manufacturing & Production, 10, pp. 54-58.
    • (1998) Automotive Manufacturing & Production , vol.10 , pp. 54-58
    • Gould, L.S.1
  • 17
    • 28144454329 scopus 로고    scopus 로고
    • SAP's apparel/footwear solution: Does it have all the answers?
    • Hili, S. (1998) SAP's apparel/footwear solution: Does it have all the answers? Apparel Industry Magazine, 59, pp. 62-63.
    • (1998) Apparel Industry Magazine , vol.59 , pp. 62-63
    • Hili, S.1
  • 18
    • 0002744495 scopus 로고
    • Job shop scheduling with due dates and overtime capability
    • Holloway, C.A and Nelson, R.T. (1974) Job shop scheduling with due dates and overtime capability Management Science, 21, pp. 68-78.
    • (1974) Management Science , vol.21 , pp. 68-78
    • Holloway, C.A.1    Nelson, R.T.2
  • 20
    • 28144436794 scopus 로고    scopus 로고
    • Scheduling and reliable lead time quotation for orders with availability intervals and lead time sensitive revenues
    • Pittsburgh: Working Paper, Carnegie Mellon University, PAO
    • Keskinocak, P. and Ravi, R. and Tayur, S.(1999) Scheduling and reliable lead time quotation for orders with availability intervals and lead time sensitive revenues. Pittsburgh: Working Paper, Carnegie Mellon University, PAO.
    • (1999)
    • Keskinocak, P.1    Ravi, R.2    Tayur, S.3
  • 21
    • 10044225927 scopus 로고    scopus 로고
    • Right from the get-go
    • Kevin, P. (1996) Right from the get-go Manufacturing Systems, 14, pp. 34.
    • (1996) Manufacturing Systems , vol.14 , pp. 34
    • Kevin, P.1
  • 22
    • 0030244109 scopus 로고
    • Simulated annealing and genetic algorithms for scheduling products with multi-level product structure
    • Kim, J. and Kim, Y. (1995) Simulated annealing and genetic algorithms for scheduling products with multi-level product structure Computers & Operations Research, 23, pp. 857-868.
    • (1995) Computers & Operations Research , vol.23 , pp. 857-868
    • Kim, J.1    Kim, Y.2
  • 23
    • 0041809043 scopus 로고    scopus 로고
    • Software delivers customized PC orders, tracking
    • King, J. (1996) Software delivers customized PC orders, tracking Computerworld, 30, pp. 45.
    • (1996) Computerworld , vol.30 , pp. 45
    • King, J.1
  • 24
    • 0032208462 scopus 로고    scopus 로고
    • ACLIPS: A capacity and lead time integrated procedure for scheduling
    • Lambrecht, M.R. and Ivens, P.L. and Vandale, N.J. (1998) ACLIPS: A capacity and lead time integrated procedure for scheduling Management Science, 44, pp. 1549-1561.
    • (1998) Management Science , vol.44 , pp. 1549-1561
    • Lambrecht, M.R.1    Ivens, P.L.2    Vandale, N.J.3
  • 26
    • 0343858610 scopus 로고    scopus 로고
    • A rapidly changing landscape
    • March
    • Layden, J.E. (1996) A rapidly changing landscape. Manufacturing Systems, March, A10.
    • (1996) Manufacturing Systems
    • Layden, J.E.1
  • 27
    • 28144444250 scopus 로고
    • A new approach to production planning scheduling and due-date quotation in manufacturing systems
    • Ph.D. Dissertation, Ithaca NY: Cornell University
    • Loerch, A.G. (1990) A new approach to production planning scheduling and due-date quotation in manufacturing systems. Ph.D. Dissertation, Ithaca NY: Cornell University.
    • (1990)
    • Loerch, A.G.1
  • 28
    • 0028408211 scopus 로고
    • An approach to production planning and scheduling in cyclically scheduled manufacturing systems
    • Loerch, A.G. and Muckstadt, J.A. (1994) An approach to production planning and scheduling in cyclically scheduled manufacturing systems International Journal of Production Research, 32, 851-871.
    • (1994) International Journal of Production Research , vol.32 , pp. 851-871
    • Loerch, A.G.1    Muckstadt, J.A.2
  • 29
    • 0027559574 scopus 로고
    • A due date assignment algorithm for multiproduct manufacturing facilities
    • Luss, H. and Rosenwein, M.B. (1993) A due date assignment algorithm for multiproduct manufacturing facilities European Journal of Operational Research, 65, 187-198.
    • (1993) European Journal of Operational Research , vol.65 , pp. 187-198
    • Luss, H.1    Rosenwein, M.B.2
  • 30
    • 0038190400 scopus 로고    scopus 로고
    • Capacity-driven acceptance of customer orders for a multi-state batch manufacturing system: Models and algorithms
    • Technical report TR1233 Ithaca NY: Cornell University
    • Round, R. Cakanyildirim, M. Chen, D. Chen, P. Freimer, M. Jackson, P.L. and Melkonian, V.(1999) Capacity-driven acceptance of customer orders for a multi-state batch manufacturing system: Models and algorithms. Technical report TR1233 Ithaca NY: Cornell University.
    • (1999)
    • Round, R.1    Cakanyildirim, M.2    Chen, D.3    Chen, P.4    Freimer, M.5    Jackson, P.L.6    Melkonian, V.7
  • 31
    • 0030084767 scopus 로고    scopus 로고
    • Selecting jobs for a heavily loaded shop with lateness penalties
    • Slotnick, S.A. and Morton, T.E. (1996) Selecting jobs for a heavily loaded shop with lateness penalties Computers&Operations Research, 23, 23, 131-140.
    • (1996) Computers & Operations Research , vol.23 , pp. 131-140
    • Slotnick, S.A.1    Morton, T.E.2
  • 36
    • 0026880663 scopus 로고
    • Order acceptance strategies in a production-to-order environment with setup times and due-dates
    • Wester, F.A.W. Wijngaard, J. and Zijm, W.H.M. (1992) Order acceptance strategies in a production-to-order environment with setup times and due-dates International Journal of Production Research, 30, 1313-1326.
    • (1992) International Journal of Production Research , vol.30 , pp. 1313-1326
    • Wester, F.A.W.1    Wijngaard, J.2    Zijm, W.H.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.