메뉴 건너뛰기




Volumn 2, Issue , 2005, Pages 1200-1205

An improved adaptive neural network for job-shop scheduling

Author keywords

Adaptive neural network; Constraint satisfaction; Heuristics; Job shop scheduling

Indexed keywords

ADAPTIVE CONTROL SYSTEMS; ALGORITHMS; CONSTRAINT THEORY; CONVERGENCE OF NUMERICAL METHODS; HEURISTIC METHODS; NEURAL NETWORKS; PRODUCTION ENGINEERING;

EID: 27944482545     PISSN: 1062922X     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (3)

References (9)
  • 2
    • 0024122608 scopus 로고
    • Neural networks for solving job-shop scheduling: Part 1. Problem representation
    • S. Y. Foo and Y. Takefuji, "Neural networks for solving job-shop scheduling: Part 1. Problem representation," Proc. IEEE IJCNN, vol. 2, pp. 275-282, 1988.
    • (1988) Proc. IEEE IJCNN , vol.2 , pp. 275-282
    • Foo, S.Y.1    Takefuji, Y.2
  • 3
    • 0024125703 scopus 로고
    • Stochastic neural networks for solving job-shop scheduling: Part 2. Architecture and simulations
    • S. Y. Foo and Y. Takefuji, "Stochastic neural networks for solving job-shop scheduling: Part 2. Architecture and simulations," Proc. IEEE IJCNN, vol. 2, pp. 283-290, 1988.
    • (1988) Proc. IEEE IJCNN , vol.2 , pp. 283-290
    • Foo, S.Y.1    Takefuji, Y.2
  • 4
    • 0000131281 scopus 로고
    • Algorithms for solving production scheduling problems
    • B. Giffler and G. Thompson, "Algorithms for solving production scheduling problems," Operations Research, vol. 8, pp. 487-503, 1960.
    • (1960) Operations Research , vol.8 , pp. 487-503
    • Giffler, B.1    Thompson, G.2
  • 6
    • 0028375547 scopus 로고
    • Neural networks for job-shop scheduling
    • T. M. Willems, "Neural networks for job-shop scheduling," Control Engg. Prac., vol. 2, no. 1, pp. 31-39, 1994.
    • (1994) Control Engg. Prac. , vol.2 , Issue.1 , pp. 31-39
    • Willems, T.M.1
  • 7
    • 0033742040 scopus 로고    scopus 로고
    • Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling
    • S. Yang and D. Wang, "Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling," IEEE Trans. on Neural Networks, vol. 11, no. 2, pp. 474-486, 2000.
    • (2000) IEEE Trans. on Neural Networks , vol.11 , Issue.2 , pp. 474-486
    • Yang, S.1    Wang, D.2
  • 8
    • 0035452563 scopus 로고    scopus 로고
    • A new adaptive neural network and heuristics hybrid approach for job-shop scheduling
    • S. Yang and D. Wang, "A new adaptive neural network and heuristics hybrid approach for job-shop scheduling," Comp. & Oper. Res., vol. 28, no. 10, pp. 955-971, 2001.
    • (2001) Comp. & Oper. Res. , vol.28 , Issue.10 , pp. 955-971
    • Yang, S.1    Wang, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.