|
Volumn 184, Issue 1-3, 2005, Pages 197-210
|
Selection, operation and control of a work exchanger energy recovery system based on the Singapore project
a
Calder AG
(Switzerland)
|
Author keywords
Energy recovery; Pressure exchanger; Reverse osmosis; Work exchanger
|
Indexed keywords
COST EFFECTIVENESS;
ENERGY CONSERVATION;
ENERGY EFFICIENCY;
ENERGY UTILIZATION;
HEAT EXCHANGERS;
OPTIMIZATION;
POWER CONTROL;
REVERSE OSMOSIS;
WATER TREATMENT PLANTS;
ENERGY RECOVERY SYSTEM;
PRESSURE EXCHANGER;
REVERSE OSMOSIS PLANT;
SINGAPORE;
WORK EXCHANGER;
DESALINATION;
ENERGY RECOVERY;
REVERSE OSMOSIS;
|
EID: 27944482505
PISSN: 00119164
EISSN: None
Source Type: Journal
DOI: 10.1016/j.desal.2005.04.031 Document Type: Article |
Times cited : (51)
|
References (4)
|