메뉴 건너뛰기




Volumn 184, Issue 1-3, 2005, Pages 197-210

Selection, operation and control of a work exchanger energy recovery system based on the Singapore project

Author keywords

Energy recovery; Pressure exchanger; Reverse osmosis; Work exchanger

Indexed keywords

COST EFFECTIVENESS; ENERGY CONSERVATION; ENERGY EFFICIENCY; ENERGY UTILIZATION; HEAT EXCHANGERS; OPTIMIZATION; POWER CONTROL; REVERSE OSMOSIS; WATER TREATMENT PLANTS;

EID: 27944482505     PISSN: 00119164     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.desal.2005.04.031     Document Type: Article
Times cited : (51)

References (4)
  • 1
    • 27944440709 scopus 로고    scopus 로고
    • Shumway: The Work Exchanger for SWRO Energy Recovery
    • A. Scott, Shumway: The Work Exchanger for SWRO Energy Recovery, 2005.
    • (2005)
    • Scott, A.1
  • 2
    • 27944460127 scopus 로고    scopus 로고
    • 3/day Seawater Reverse Osmosis Work Exchanger Energy Recovery System IDA Conference
    • San Diego
    • 3/day Seawater Reverse Osmosis Work Exchanger Energy Recovery System IDA Conference, San Diego 1999
    • (1999)
    • Andrews, W.T.1    Scott, A.2
  • 3
    • 27944493773 scopus 로고    scopus 로고
    • Pressure Centre and Boron Removal in Ashkelon Desalination Plant
    • IDA Conference, Bahamas
    • M. Faigon and B. Liberman Pressure Centre and Boron Removal in Ashkelon Desalination Plant IDA Conference, Bahamas 2003
    • (2003)
    • Faigon, M.1    Liberman, B.2
  • 4
    • 27944456656 scopus 로고    scopus 로고
    • Ashkelon 100 Mcm/Year BOT Project
    • IDS Conference, Tel Aviv
    • G. Kronenberg Ashkelon 100 Mcm/Year BOT Project IDS Conference, Tel Aviv 2005
    • (2005)
    • Kronenberg, G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.