메뉴 건너뛰기




Volumn 29, Issue 20, 2005, Pages 15-19

Primary design of the generator maintenance market

Author keywords

Electricity market; Fare calculation; Maintenance bid; Maintenance scheduling

Indexed keywords

INDUSTRIAL ECONOMICS; MAINTENANCE; MATHEMATICAL MODELS;

EID: 27944464557     PISSN: 10001026     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (8)

References (10)
  • 1
    • 3643103158 scopus 로고    scopus 로고
    • Unit maintenance scheduling in open access electric power system
    • YAO Yu-wang, HANDSCHIN E. Unit Maintenance Scheduling in Open Access Electric Power System. IEEE Power Engineering Review, 1998, 18(12): 64-65.
    • (1998) IEEE Power Engineering Review , vol.18 , Issue.12 , pp. 64-65
    • Yao, Y.-W.1    Handschin, E.2
  • 2
    • 3142748677 scopus 로고    scopus 로고
    • Unit maintenance scheduling model under primary electricity market environment
    • WANG Peng, ZHANG Li-zi, BAO Hai et al. Unit Maintenance Scheduling Model Under Primary Electricity Market Environment. Electric Power, 2000, 33(11): 79-81.
    • (2000) Electric Power , vol.33 , Issue.11 , pp. 79-81
    • Wang, P.1    Zhang, L.-Z.2    Bao, H.3
  • 3
    • 18344365063 scopus 로고    scopus 로고
    • Competitive mechanism for maintenance scheduling of generating units
    • GAO Zhi-hua, REN Zhen, HUANG Wen-ying et al. Competitive Mechanism for Maintenance Scheduling of Generating Units. Automation of Electric Power Systems, 2005, 29(7): 38-42.
    • (2005) Automation of Electric Power Systems , vol.29 , Issue.7 , pp. 38-42
    • Gao, Z.-H.1    Ren, Z.2    Huang, W.-Y.3
  • 4
    • 3142573007 scopus 로고    scopus 로고
    • Research on the modeling and algorithm to global generator and transmission maintenance scheduling
    • DING Ming, FENG Yong-qing. Research on the Modeling and Algorithm to Global Generator and Transmission Maintenance Scheduling. Proceedings of the CSEE, 2004, 24(5): 18-23.
    • (2004) Proceedings of the CSEE , vol.24 , Issue.5 , pp. 18-23
    • Ding, M.1    Feng, Y.-Q.2
  • 5
    • 10444269038 scopus 로고    scopus 로고
    • Optimal maintenance strategy for generation companies based on chance-constrained programming
    • WANG Jian, WEN Fu-shuan, YANG Ren-gang. Optimal Maintenance Strategy for Generation Companies Based on Chance-constrained Programming. Automation of Electric Power Systems, 2004, 28(19): 27-31.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.19 , pp. 27-31
    • Wang, J.1    Wen, F.-S.2    Yang, R.-G.3
  • 6
    • 3142673927 scopus 로고    scopus 로고
    • A preliminary investigation on the regulation mechanism for maintenance scheduling of generating units in the electricity market environment
    • WANG Jian, WEN Fu-shuan, YANG Ren-gang. A Preliminary Investigation on the Regulation Mechanism for Maintenance Scheduling of Generating Units in the Electricity Market Environment. Automation of Electric Power Systems, 2004, 28(7): 20-34.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.7 , pp. 20-34
    • Wang, J.1    Wen, F.-S.2    Yang, R.-G.3
  • 7
    • 0037173794 scopus 로고    scopus 로고
    • Research for maintenances scheduling of a turbine power plant in the electricity power market
    • QUAN Hong-xing, LIU Jun-yong. Research for Maintenances Scheduling of a Turbine Power Plant in the Electricity Power Market. Automation of Electric Power Systems, 2002, 26(14): 35-39.
    • (2002) Automation of Electric Power Systems , vol.26 , Issue.14 , pp. 35-39
    • Quan, H.-X.1    Liu, J.-Y.2
  • 10
    • 13344293120 scopus 로고    scopus 로고
    • Two bidding modes of generation-side electricity market for application
    • YAO Jian-gang, TANG Jie, LI Xi-quan et al. Two Bidding Modes of Generation-side Electricity Market for Application. Automation of Electric Power Systems, 2003, 27(24): 14-17.
    • (2003) Automation of Electric Power Systems , vol.27 , Issue.24 , pp. 14-17
    • Yao, J.-G.1    Tang, J.2    Li, X.-Q.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.