메뉴 건너뛰기




Volumn 74, Issue 1-4, 2005, Pages 397-402

The ITER neutral beam test facility: Designs of the general infrastructure, cryosystem and cooling plant

Author keywords

Facility; Infrastructure; ITER; Neutral beam

Indexed keywords

COOLING SYSTEMS; CRYOSTATS; ION BEAMS;

EID: 27844598432     PISSN: 09203796     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.fusengdes.2005.06.114     Document Type: Conference Paper
Times cited : (5)

References (4)
  • 3
    • 27844483764 scopus 로고    scopus 로고
    • The NBTF cryopumping operation, preliminary analysis and design of the cryogenic system
    • China, April
    • B. Gravil, et al., The NBTF cryopumping operation, preliminary analysis and design of the cryogenic system, in: Proceedings of the ICEC20 Conference, China, April 2004.
    • (2004) Proceedings of the ICEC20 Conference
    • Gravil, B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.